Can't believe how much of this rock fell off! Its looks totally different - no longer a castle. Sad but very glad that the huge rock did not hit anything on the way down!
Photograph captioned by Fairfax, "Closed sign at Castle Rock, following earthquake".
Photograph captioned by Fairfax, "Closed sign at Castle Rock, following earthquake".
A very different looking Castle Rock to what was there pre earthquakes.
Photograph captioned by Fairfax, "Rock fall from Castle Rock following the Canterbury earthquakes".
A photograph of children playing on a bouncy castle at the Gap Filler Fun Fair.
Ian Beale joins us from Mt Pleasant where there has been a rock fall off Castle Rock.
Photograph captioned by Fairfax, "Castle Rock in Heathcote Valley lost its point and slid down the hill".
A large pile of liquefaction silt in Parklands has been topped with a Christmas star. The photographer comments, "Not exactly the kind of sand castle you want to build on your Summer holidays. This is the biggest of several piles of liquefaction in just one street in Parklands/Queenspark".
The damage to Castle Rock, overlooking the Heathcote Valley from the 7.1 earthquake on September 4th.
A digger works on top of a pile of soil and building rubble.
Photograph captioned by Fairfax, "Workmen repairing to remove dangerous rocks/boulders on Castle Hill above the Lyttelton tunnel road".
A silt castle has been built by Christchurch East that wins the competition. Context: The eastern suburbs have had a lot of problems with liquefaction following earthquakes and aftershocks. Quantity: 1 digital cartoon(s).
Two of the large boulders (larger than a house or two) that came down from Castle Rock (see the fence in front of the boulders).
Castle Rock above Heathcote, showing damage (and two very large pieces in the foreground) that came down during the 7.1 quake on 4th September.
Today we’re going back to Christchurch’s hinterland, this time to Kura Tāwhiti/Castle Hill, a place that’s still an important and valued part of the city’s surrounds. But in the interests of full disclosure, I feel like I should let you … Continue reading →
Photograph captioned by Fairfax, "Solutions to Access Ltd are clearing loose rock from Castle Rock after the September 4th earthquake dislodged a massive bolder the size of a house and sent it careening down Heathcote Valley".
A video of an interview with Robin Judkins, Canterbury personality and Coast to Coast founder, about his experiences during the 22 February 2011 earthquake, and the changes to Christchurch. This video is part of The Press's 'Christchurch, one year after February 22, 2011' series.
Photograph captioned by Fairfax, "Solutions to Access Ltd are clearing loose rock from Castle Rock after the September 4th earthquake dislodged a massive bolder the size of a house and sent it careening down Heathcote Valley. (L-R) Martin Freeman and Andrew Kingdon dislodge loose rock".
Photograph captioned by Fairfax, "Solutions to Access Ltd are clearing loose rock from Castle Rock after the September 4th earthquake dislodged a massive bolder the size of a house and sent it careening down Heathcote Valley. (L-R) Martin Freeman and Andrew Kingdon dislodge loose rock".
The Queen tells Prince Philip that she has received a 'Dear John' letter from PM John Key and that it 'seems the earth has moved for him back in NZ'. Text above reads 'Keynote'. In a second version the queen says that John Key 'preferred to stay at home 'cos the earth moved'. A third version refers to the decision of the PM to remain in New Zealand because of the Christchurch earthquake instead of going on a trip to Europe with his wife during which they were to have stayed at the invitation of the Queen at Balmoral Castle in Scotland. Quantity: 3 digital cartoon(s).
Text above reads 'Prince William comes to Christchurch...' A special royal portaloo has been arranged for the visit of Prince William to Christchurch; it is built to resemble a castle and has gold door fittings. On either side of the portaloo stands a sentry guard. The prince who is inside whispers 'I can't find the royal flush button' (wordplay on 'royal flush' and the 'flush' of a toilet) Context - Prince William visited the Civil Defence headquarters in Christchurch with Earthquake Recovery Minister Gerry Brownlee and Christchurch Mayor Bob Parker on the 17th March to see the damage caused by the earthquakes of the 4th September 2010 and the 22 February 2011. Quantity: 1 digital cartoon(s).
This project was initiated by ENGEO Limited and KiwiRail Holdings Limited to assess the stability of Slovens Creek Viaduct (specifically its western abutment) and a 3km section of rail corridor between Slovens Creek Viaduct and Avoca on the Midland Line (MDL). Commonly known as the scenic TranzAlpine rail journey (through Arthurs Pass National Park) the MDL connects Greymouth to Christchurch via Rolleston, where the MDL meets the Main South Line into Christchurch. The project area is approximately 40km southeast of Arthurs Pass Township, in the eastern extension of the Castle Hill Basin which is part of the Waimakariri Catchment and Canterbury Foothills. The field area is underlain by Rakaia Terrane, which is part of the Torlesse Composite Terrane forming the basement rock unit for the field area. Cretaceous-Tertiary rocks of the Castle Hill Basin overlie the basement strata and record a transgression-regression sequence, as well as mid-Oligocene submarine volcanism. The stratigraphic sequence in the Castle Hill Basin, and its eastern extension to Avoca, comprises two formations of the Eyre group, the older Broken River Formation and the younger Iron Creek Formation. Deep marine Porter Group limestones, marls, and tuffs of Oligocene age succeed the Iron Creek Formation of the Eyre Group, and probably records the maximum of the transgression. The Enys Formation lies disconformably on the Porter Group and is overlain unconformably by Late Pleistocene glacifluvial and glacial deposits. The Tertiary strata in the Slovens-Avoca rail corridor are weak, and the clay-rich tuff derived from mid-Oligocene volcanism is particularly prone to slaking. Extensive mapping carried out for this project has identified that some 90 percent of the surface along the length of the Slovens-Avoca corridor has been subject to mass movement. The landslides of the Slovens-Avoca rail corridor are clearly younger than the Last Glaciation, and Slovens Creek has been downcutting, with associated faulting and uplift, to form the present day geomorphology of the rail corridor. Deep-seated landslides in the rail corridor extend to Slovens Creek, locally deflecting the stream course, and a generic ground failure model for the rail corridor has been developed. Exploratory geotechnical investigations, including core drilling, installation of an inclinometer and a piezometer, enabled the construction of a simple ground model and cross section for the Slovens Creek Viaduct western abutment. Limit-equilibrium and pseudo-static slope stability analyses using both circular and block critical slip surface search methods were applied to the ground model for the western abutment of Slovens Creek Viaduct. Piezometric and strength data obtained during laboratory testing of core material have been used to constrain the western abutment stability assessment for one representative section line (C-C’). Prior to pseudo-static sensitivity analyses peak ground acceleration (PGA) for various Ultimate Limit State (ULS) design return periods, defined by an equation given in NZS1170.5:2004, were calculated and have been used as a calibration technique to find and compare specific PGA values for pseudo-static analyses in the Slovens Creek Viaduct area. The main purpose has been to provide an indication of how railway infrastructure could be affected by seismic events of various return periods defined by ULS design standards for the area. Limit equilibrium circular slip surface search methods, both grid search and auto refine search, indicated the slope is stable with a FoS greater than 1.0 returned from each, although one particular surface returned the lowest FoS in each. This surface is in the lower portion of the slope, adjacent to Slovens Stream and northeast of the MDL. As expected, pseudo-static analyses returned a lower FoS overall when compared to limit equilibrium analyses. The PGA analyses suggest that partial ground failure at the Slovens Creek Viaduct western abutment could occur in a 1 in 25-year return period event within materials on the slower slope beyond the immediate rail corridor. A ULS (1 in 500-year) event in the Slovens Creek Viaduct area would likely produce a PGA of ~0.9g, and the effects on the western abutment and rail infrastructure would most likely be catastrophic. Observed ground conditions for the western abutment of the Slovens Creek Viaduct suggest there is no movement within the landslide at depth within the monitoring timeframe of this project (22 May 2015 – 4 August 2015). Slope stability monitoring is recommended to be continued in two parts: (1) the inclinometer in BH1 is to be monitored on a six monthly basis for one year following completion of this thesis, and then annually unless ground movements become evident; and (2) surface movement monitoring should be installed using a fixed datum on the stable eastern abutment. Long-term stability management strategies for the Slovens Creek Viaduct western abutment are dependent upon future observed changes and ongoing monitoring. Hazard and risk assessment using the KiwiRail Qualitative Risk Assessment Framework (QRA) is recommended, and if slope stability becomes problematic for operation of the Midland Line consideration should be given to deep slope drainage. In the event of a large magnitude or high PGA earthquake all monitoring should be reviewed.