Search

found 3123 results

Research papers, University of Canterbury Library

This study contains an evaluation of the seismic hazard associated with the Springbank Fault, a blind structure discovered in 1998 close to Christchurch. The assessment of the seismic hazard is approached as a deterministic process in which it is necessary to establish: 1) fault characteristics; 2) the maximum earthquake that the fault is capable of producing and 3) ground motions estimations. Due to the blind nature of the fault, conventional techniques used to establish the basic fault characteristics for seismic hazard assessments could not be applied. Alternative methods are used including global positioning system (GPS) surveys, morphometric analyses along rivers, shallow seismic reflection surveys and computer modelling. These were supplemented by using multiple empirical equations relating fault attributes to earthquake magnitude, and attenuation relationships to estimate ground motions in the near-fault zone. The analyses indicated that the Springbank Fault is a reverse structure located approximately 30 km to the northwest of Christchurch, along a strike length of approximately 16 km between the Eyre and Ashley River. The fault does not reach the surface, buy it is associated with a broad anticline whose maximum topographic expression offers close to the mid-length of the fault. Two other reverse faults, the Eyrewell and Sefton Faults, are inferred in the study area. These faults, together with the Springbank and Hororata Faults and interpreted as part of a sys of trust/reverse faults propagating from a decollement located at mid-crustal depths of approximately 14 km beneath the Canterbury Plains Within this fault system, the Springbank Fault is considered to behave in a seismically independent way, with a fault slip rate of ~0.2 mm/yr, and the capacity of producing a reverse-slip earthquake of moment magnitude ~6.4, with an earthquake recurrence of 3,000 years. An earthquake of the above characteristics represents a significant seismic hazard for various urban centres in the near-fault zone including Christchurch, Rangiora, Oxford, Amberley, Kaiapoi, Darfield, Rollestion and Cust. Estimated peak ground accelerations for these towns range between 0.14 g to 0.5 g.

Research papers, University of Canterbury Library

In major seismic events, a number of plan-asymmetric buildings which experienced element failure or structural collapse had twisted significantly about their vertical axis during the earthquake shaking. This twist, known as “building torsion”, results in greater demands on one side of a structure than on the other side. The Canterbury Earthquakes Royal Commission’s reports describe the response of a number of buildings in the February 2011 Christchurch earthquakes. As a result of the catastrophic collapse of one multi-storey building with significant torsional irregularity, and significant torsional effects also in other buildings, the Royal Commission recommended that further studies be undertaken to develop improved simple and effective guides to consider torsional effects in buildings which respond inelastically during earthquake shaking. Separately from this, as building owners, the government, and other stakeholders, are planning for possible earthquake scenarios, they need good estimates of the likely performance of both new and existing buildings. These estimates, often made using performance based earthquake engineering considerations and loss estimation techniques, inform decision making. Since all buildings may experience torsion to some extent, and torsional effects can influence demands on building structural and non-structural elements, it is crucial that demand estimates consider torsion. Building seismic response considering torsion can be evaluated with nonlinear time history analysis. However, such analysis involves significant computational effort, expertise and cost. Therefore, from an engineers’ point of view, simpler analysis methods, with reasonable accuracy, are beneficial. The consideration of torsion in simple analysis methods has been investigated by many researchers. However, many studies are theoretical without direct relevance to structural design/assessment. Some existing methods also have limited applicability, or they are difficult to use in routine design office practice. In addition, there has been no consensus about which method is best. As a result, there is a notable lack of recommendations in current building design codes for torsion of buildings that respond inelastically. There is a need for building torsion to be considered in yielding structures, and for simple guidance to be developed and adopted into building design standards. This study aims to undertaken to address this need for plan-asymmetric structures which are regular over their height. Time history analyses are first conducted to quantify the effects of building plan irregularity, that lead to torsional response, on the seismic response of building structures. Effects of some key structural and ground motion characteristics (e.g. hysteretic model, ground motion duration, etc.) are considered. Mass eccentricity is found to result in rather smaller torsional response compared to stiffness/strength eccentricity. Mass rotational inertia generally decreases the torsional response; however, the trend is not clearly defined for torsionally restrained systems (i.e. large λty). Systems with EPP and bilinear models have close displacements and systems with Takeda, SINA, and flag-shaped models yield almost the same displacements. Damping has no specific effect on the torsional response for the single-storey systems with the unidirectional eccentricity and excitation. Displacements of the single-storey systems subject to long duration ground motion records are smaller than those for short duration records. A method to consider torsional response of ductile building structures under earthquake shaking is then developed based on structural dynamics for a wide range of structural systems and configurations, including those with low and high torsional restraint. The method is then simplified for use in engineering practice. A novel method is also proposed to simply account for the effects of strength eccentricity on response of highly inelastic systems. A comparison of the accuracy of some existing methods (including code-base equivalent static method and model response spectrum analysis method), and the proposed method, is conducted for single-storey structures. It is shown that the proposed method generally provides better accuracy over a wide range of parameters. In general, the equivalent static method is not adequate in capturing the torsional effects and the elastic modal response spectrum analysis method is generally adequate for some common parameters. Record-to-record variation in maximum displacement demand on the structures with different degrees of torsional response is considered in a simple way. Bidirectional torsional response is then considered. Bidirectional eccentricity and excitation has varying effects on the torsional response; however, it generally increases the weak and strong edges displacements. The proposed method is then generalized to consider the bidirectional torsion due to bidirectional stiffness/strength eccentricity and bidirectional seismic excitation. The method is shown to predict displacements conservatively; however, the conservatism decreases slightly for cases with bidirectional excitation compared to those subject to unidirectional excitation. In is shown that the roof displacement of multi-storey structures with torsional response can be predicted by considering the first mode of vibration. The method is then further generalized to estimate torsional effects on multi-storey structure displacement demands. The proposed procedure is tested multi-storey structures and shown to predict the displacements with a good accuracy and conservatively. For buildings which twist in plan during earthquake shaking, the effect of P-Δλ action is evaluated and recommendations for design are made. P-Δλ has more significant effects on systems with small post- yield stiffness. Therefore, system stability coefficient is shown not to be the best indicator of the importance of P-Δλ and it is recommended to use post-yield stiffness of system computed with allowance for P-Δλ effects. For systems with torsional response, the global system stability coefficient and post- yield stiffness ration do not reflect the significance of P-Δλ effects properly. Therefore, for torsional systems individual seismic force resisting systems should be considered. Accuracy of MRSA is investigated and it is found that the MRSA is not always conservative for estimating the centre of mass and strong edge displacements as well as displacements of ductile systems with strength eccentricity larger than stiffness eccentricity. Some modifications are proposed to get the MRSA yields a conservative estimation of displacement demands for all cases.

Images, UC QuakeStudies

A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Future Insurability. In an article in the New Zealand Herald of 5 November 2014, the CEO of IAG refers to cooperation with the NZ Government on a strategic intent in 2011 to avoid depopulation of Christchurch. Now that the ICNZ has signalled its intention to withdraw from high-risk areas and the CCC also plans to redefine the boundaries of the city so as to exclude properties below the Mean High Water Springs. We ask whether a 'recovery' involves abandoning people once the insurance and bank sectors have managed a retreat? We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".

Audio, Radio New Zealand

The best interviews from Radio New Zealand Sport for the week ending Friday 27 May. This week, the New Zealand footballers head for the United States this weekend for the first of two friendlies and we hear from the man who's likely to stand in for the regular skipper Ryan Nelsen. And in Nelsen's home town, we talk to the director of the Christchurch marathon which looked as if it would have to be cancelled after the earthquake on the 22nd of February Another top All Black has re-signed with the New Zealand Rugby Union - the head coach Graham Henry gives his views on what Richie McCaw's decision means while the captain explains why he's staying when others are going. We'll also hear from one of the standout players in the Highlanders team which continues to mock pre-season wooden spoon predictions. Extra Time - a weekly show from Radio New Zealand Sport which provides extended interviews and comment from issues arising from the sporting week.

Audio, Radio New Zealand

The David and Goliath battle over a heritage building sitting in the way of a planned $473 million dollar, multi-use arena for Christchurch has ended up in court. The 25,000-seated, roofed arena is the final anchor project for the Christchurch rebuild and will be designed to host everything from All Blacks tests to big concerts. But sitting on the edge of the site, at 212 Madras Street, is the NG Building, a 115-year old warehouse that's home to a number of creative businesses. It escaped the worst of the 2011 earthquake and was strengthened by its owners: Roland Logan and Sharon Ng. They say they were told in 2013 the building could be incorporated into the arena's design, and are at loggerheads over its compulsory acquisition. Last week they were at the High Court seeking an injunction that would allow them to temporarily maintain ownership of the building, and that decision was released yesterday - and upheld. Roland joins Kathryn to discuss why they hope the building can be saved.

Audio, Radio New Zealand

A review of the week's news including... National MP Todd Barclay falls on his sword while Labour is in damage control, the decision to not prosecute the Pike River Mine CEO is to be contested in the Supreme Court, the lawyer for Akshay Chand says she sought bail on his behalf believing his mother and aunt would monitor his every movement, The Education Ministry is forced to apologise for its flawed handling of school closures and mergers after the 2011 Canterbury earthquake, The Health Minister is forced to defend his embattled Ministry following a major budget blunder, employment lawyers aren't surprised another health sector group is taking a pay equity claim, Ministry for Primary Industries officials come under fire at a packed Stewart Island public meeting on the cull of the island's farmed oysters, it's Plan B for a crowd funded initiative that wants to take control of Dunedin's Cadbury factory and All Black great Sir Colin 'pinetree' Meads has been immortalised in bronze.

Images, Alexander Turnbull Library

The text 'Rugby World Cup' runs across the top of the cartoon. Below is a poster depicting the shape of a rugby ball with a double koru design and the year '2011'. It is accompanied by the words 'Rugby New Zealand (well not quite all New Zealand)' Someone off screen kicks a rugby ball that represents 'Christrch' across the frame. Context - Christchurch has been told that they will not be able to host any Rugby World Cup games because of the damage to the city after the earthquakes 4 September 2010 and 22 February 2011. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Two people stare at a demolition scene. The man thinks there must have been an earthquake but the woman advises him that it was the city council. Refers to plans to demolish three buildings in Wellington's Willis Street without public consultation. The buildings due for demolition are owned by Singaporean Grand Complex Properties, which plans eventually to build a multimillion-dollar high-rise on the site, reports stuff.co.nz. The Canterbury earthquake happened 4th September and as a result there has been a lot of discussion about the need to preserve historic buildings if at all possible. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

The cartoon shows the word 'survivors' in very large print which fades out towards the end of the word. A second version is the same as the first but has the text 'Search called off' in the top left corner. A third version shows the word 'survivors' against a background of the ruined Christchurch Cathedral. Context - The moment when it was realized that no more people could have survived the Christchurch of 22 February 2011. To date there have been about 165 confirmed dead but there are more bodies still trapped in the rubble of collapsed buildings. Three versions of this cartoon are available Quantity: 3 digital cartoon(s).

Images, Alexander Turnbull Library

Text above reads 'Prince William comes to Christchurch...' A special royal portaloo has been arranged for the visit of Prince William to Christchurch; it is built to resemble a castle and has gold door fittings. On either side of the portaloo stands a sentry guard. The prince who is inside whispers 'I can't find the royal flush button' (wordplay on 'royal flush' and the 'flush' of a toilet) Context - Prince William visited the Civil Defence headquarters in Christchurch with Earthquake Recovery Minister Gerry Brownlee and Christchurch Mayor Bob Parker on the 17th March to see the damage caused by the earthquakes of the 4th September 2010 and the 22 February 2011. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

In the living room of a house half-ruined by the Christchurch earthquake a decrepit and useless-looking man in a grubby white singlet doses in his armchair with a glass of beer in his hand; his wife whispers to a friend 'Just between you and me, I'm hoping to have him red-stickered!' Context - The two Christchurch earthquakes of 4 September 2010 and 22 February 2011 and the technique of using different coloured stickers to designate the degree of damage to buildings - 'red' indicates that it needs to be demolished. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

A container labelled 'Chch East residents'has landed on the far side of the planet Mars. Others have landed or are descending. People in space suits exit the containers. One of them shakes hands with a green Martian commenting to him that the ground there is solid, it has nice views and the locals are a lot less alien than the insurance agents back home. Context: refers to NASA's exploration of the surface of Mars by the Curiosity rover. The rover landed on Mars in September 2012 and the ongoing problems of earthquake survivors in Christchurch's eastern suburbs. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

The cartoon shows God sitting at his computer with an image of a devastated Christchurch on the screen. He is about to hit the 'smite' key. Text above reads 'God at his computer'. Context - Two more earthquakes rocked Christchurch on 13th June, following those of 4 September 2010 and 22 February 2011. The first magnitude 5.5 quake struck at 1pm, 10 kilometres east of Christchurch at Taylor's Mistake beach, at a depth of 11 kilometres, and sent people scrambling for cover. It was followed at 2.20pm by a more powerful magnitude 6 quake, centred 10 kilometres southeast of the city and 9km underground. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

The cartoon consists of the words 'More quACHES' drawn with a stencil. Context - Two more earthquakes rocked Christchurch on 13th June, following those of 4 September 2010 and 22 February 2011. The first magnitude 5.5 quake struck at 1pm, 10 kilometres east of Christchurch at Taylor's Mistake beach, at a depth of 11 kilometres, and sent people scrambling for cover. It was followed at 2.20pm by a more powerful magnitude 6 quake, centred 10 kilometres southeast of the city and 9km underground. There is a wordplay on 'quakes' and 'aches'. Quantity: 1 digital cartoon(s).

Research Papers, Lincoln University

It is no secret that there is a problem with the suburb of Aranui. Developed in the 1950s, Aranui and neighbouring Wainoni are an example of the large-scale, state-funded subdivisions of the time, yet, unlike similar developments in the North Island, they have received little to no attention from researchers. In light of the recent Canterbury earthquakes, this dissertation aims to trace the evolution of these suburbs until the 1970s and act as the first stage of a more comprehensive review of state housing and the Aranui/Wainoni area. By critically reviewing existing literature on state housing and housing policy in New Zealand, as well as undertaking archival research, this dissertation addresses the international influences on state housing in New Zealand generally and the development of the Aranui and Wainoni area more specifically in order to provide a foundation for answering the question, "What went so wrong?"

Research Papers, Lincoln University

The New Zealand Kellogg Rural Leaders Programme develops emerging agribusiness leaders to help shape the future of New Zealand agribusiness and rural affairs. Lincoln University has been involved with this leaders programme since 1979 when it was launched with a grant from the Kellogg Foundation, USA.On 2 March 1987 the Bay of Plenty region suffered an earthquake of magnitude 6.3 on the Richter scale, centred at Edgecumbe. Severe damage to personal and industrial property and drainage systems occurred. In hindsight, although much of the damage was covered by insurance, loans, public and government contributions, the continuing reconstruction costs have had a tremendous impact financially on individuals and the District as a whole. By highlighting some of these ongoing costs and suggestions of alternatives other Rural communities may be better prepared to lessen the effect of a natural disaster such as the Edgecumbe Earthquake of 1987.

Research papers, Victoria University of Wellington

© 2018 The Authors. Published by Elsevier Ltd. Governance is understood to have considerable influence on the success of recoveries following a natural disaster. What constitutes good governance and successful recovery in these circumstances? This question is discussed in relation to two recent recovery processes. Sri Lanka has, for all intents and purposes, recovered from the tsunami that struck there and other parts of southern Asia in 2004. Christchurch, New Zealand was devastated by a sequence of earthquakes during 2010 and 2011 and recovery there is now well under way. The paper discusses the governance structures that have guided these two recoveries. While it is understood that the effects of disasters could potentially be life long and recovery from them complex, compatibility of the process and outcomes in relation to cultural norms and the critical issue of housing are the key issues discussed across the two cases.

Research papers, University of Canterbury Library

The University of Canterbury Dept. of Chemistry has weathered the Canterbury Earthquake of September 4, 2010 very well due to a combination of good luck, good planning and dedicated effort. We owe a great deal to university Emergency Response Team and Facilities Management Personnel. The overall emergency preparedness of the university was tested to a degree far beyond anything else in its history and shown to be well up to scratch. A strong cooperative relationship between the pan-campus controlling body and the departmental response teams greatly facilitated our efforts. Information and assistance was provided promptly, as and when we needed it without unnecessary bureaucratic overheads. At the departmental level we are indebted to the technical staff who implemented the invaluable pre-quake mitigation measures and carried the majority of the post-quake clean-up workload. These people put aside their personal concerns and anxieties at a time when magnitude-5 aftershocks were still a regular occurrence.

Research papers, University of Canterbury Library

A preliminary case study assessing the seismic sustainability of two reinforced concrete structures, a frame structure and a wall structure, was conducted to determine which structural system is more seismically sustainable. The two structures were designed to the same standards and were assumed to be located in Christchurch, New Zealand. A component-based probabilistic seismic loss assessment, considering direct losses only, was conducted for two ground motion records, regarded to approximately represent a 1 in 500 year earthquake event and a 1 in 2500 year earthquake event, respectively. It is shown that the wall structure results in lower direct losses than the frame structure in the less severe ground motion scenario. However, in the more severe ground motion scenario, the frame structure results in lower direct losses. Hence, this study demonstrates that which structural system has the lower direct losses depends on the ground motion intensity level.

Research papers, University of Canterbury Library

On 4 September 2010, people in Canterbury were shaken from their beds by a major earthquake. This report tells the story of the University of Canterbury (UC), its staff and its students, as they rose to the many challenges presented by the earthquake. This report however, is intended to do more than just acknowledge their hard work and determination; it also critically reflects on the things that worked well and the aspects of the response that, in hindsight, could have been done better. Luckily major events such as this earthquake do not happen every day. UC has benefited from the many universities around the world that have shared their experiences of previous disasters. We hope that this report serves to pass forward the favour and enables others to benefit from the lessons that we have learnt from this event.

Research papers, University of Canterbury Library

essential systems upon which the well-being and functioning of societies depend. They deliver a service or a good to the population using a network, a combination of spatially-distributed links and nodes. As they are interconnected, network elements’ functionality is also interdependent. In case of a failure of one component, many others could be momentarily brought out-of-service. Further problems arise for buried infrastructure when it comes to buried infrastructure in earthquake and liquefaction-prone areas for the following reasons: • Technically more demanding inspections than those required for surface horizontal infrastructure • Infrastructure subject to both permanent ground displacement and transient ground deformation • Increase in network maintenance costs (i.e. deterioration due to ageing material and seismic hazard) These challenges suggest careful studies on network resilience will yield significant benefits. For these reasons, the potable water network of Christchurch city (Figure 1) has been selected for its well-characterized topology and its extensive repair dataset.

Research papers, University of Canterbury Library

The M7.8 Kaikoura Earthquake in 2016 presented a number of challenges to science agencies and institutions throughout New Zealand. The earthquake was complex, with 21 faults rupturing throughout the North Canterbury and Marlborough landscape, generating a localised seven metre tsunami and triggering thousands of landslides. With many areas isolated as a result, it presented science teams with logistical challenges as well as the need to coordinate efforts across institutional and disciplinary boundaries. Many research disciplines, from engineering and geophysics to social science, were heavily involved in the response. Coordinating these disciplines and institutions required significant effort to assist New Zealand during its most complex earthquake yet recorded. This paper explores that effort and acknowledges the successes and lessons learned by the teams involved.

Research papers, University of Canterbury Library

The 14 November 2016 Kaikōura earthquake had major impacts on New Zealand's transport system. Road, rail and port infrastructure was damaged, creating substantial disruption for transport operators, residents, tourists, and business owners in the Canterbury, Marlborough and Wellington regions, with knock-on consequences elsewhere. During both the response and recovery phases, a large amount of information and data relating to the transport system was generated, managed, analysed, and exchanged within and between organisations to assist decision making. To improve information and data exchanges and related decision making in the transport sector during future events and guide new resilience strategies, we present key findings from a recent post-earthquake assessment. The research involved 35 different stakeholder groups and was conducted for the Ministry of Transport. We consider what transport information was available, its usefulness, where it was sourced from, mechanisms for data transfer between organisations, and suggested approaches for continued monitoring.

Research papers, University of Canterbury Library

This report contributes to a collaborative project between the Marlborough District Council (MDC) and University of Canterbury (UC) which aims to help protect and promote the recovery of native dune systems on the Marlborough coast. It is centred around the mapping of dune vegetation and identification of dune protection zones for old-growth seed sources of the native sand-binders spinifex (Spinifex sericeus) and pīngao (Ficinia spiralis). Both are key habitat-formers associated with nationally threatened dune ecosystems, and pīngao is an important weaving resource and Ngāi Tahu taonga species. The primary goal is to protect existing seed sources that are vital for natural regeneration following major disturbances such as the earthquake event. Several additional protection zones are also identified for areas where new dunes are successfully regenerating, including areas being actively restored in the Beach Aid project that is assisting new native dunes to become established where there is available space.

Research papers, University of Canterbury Library

The Lake Coleridge Rock Avalanche Deposits (LCRADs) are located on Ryton Station in the middle Rakaia Valley, approximately 80 km west of Christchurch. Torlesse Supergroup greywacke is the basement material and has been significantly influenced by both active tectonics and glaciation. Both glacial and post-glacial processes have produced large volumes of material which blanket the bedrock on slopes and in the valley floors. The LCRADs were part of a regional study of rock avalanches by WHITEHOUSE (1981, 1983) and WHITEHOUSE and GRIFFITHS (1983), and a single rock avalanche event was recognised with a weathering rind age of 120 years B.P. that was later modified to 150 ± 40 years B.P. The present study has refined details of both the age and the sequence of events at the site, by identifying three separate rock avalanche deposits (termed the LCRA1, LCRA2 and LCRA3 deposits), which are all sourced from near the summit of Carriage Drive. The LCRA1 deposit is lobate in shape and had an estimated original deposit volume of 12.5 x 10⁶ m³, although erosion by the Ryton River has reduced the present day debris volume to 5.1 x 10⁶ m³. An optically stimulated luminescence date taken from sandy loess immediately beneath the LCRA1 deposit provided a maximum age for the rock avalanche event of 9,720 ± 750 years B.P., which is believed to be realistic given that this is shortly after the retreat of Acheron 3 ice from this part of the valley. Emplacement of rock avalanche material into an ancestral Ryton riverbed created a natural dam with a ~17 M m³ lake upstream. The river is thought to have created a natural spillway over the dam structure at ~557 m (a.s.l), and to have existed for a number of years before any significant downcutting occurred. Although a triggering mechanism for the LCRA1 deposit was poorly constrained, it is thought that stress rebound after glacial ice removal may have initiated failure. Due to the event occurring c.10,000 years ago, there was a lack of definition for a possible earthquake trigger, though the possibility is obvious. The LCRA₂ event had an original deposit volume of 0.66 x 10⁶ m³, and was constrained to the low-lying area adjacent to the Ryton River that had been created by river erosion of the LCRA1 deposit. Further erosion by the Ryton River has reduced the deposit volume to 0.4 x 10⁶ m³. A radiocarbon date from a piece of mānuka found within the LCRA2 deposit provided an age of 668 ± 36 years B.P., and this is thought to reliably date the event. The LCRA2 event also dammed the Ryton River, and the preservation of dam-break outwash terraces downstream from the deposit provides clear evidence of rapid dam erosion and flooding after overtopping, and breaching by the Ryton River. Based on the mean annual flow of the Ryton River, the LCRA2 lake would have taken approximately two weeks to fill assuming that there were no preferred breach paths and the material was relatively impermeable. The LCRA2 event is thought to have been coseismic with a fault rupture along the western segment of the PPAFZ, which has been dated at 600 ± 100 years B.P. by SMITH (2003). The small LCRA3 event was not able to be dated, but it is believed to have failed shortly after the LCRA2 event and it may in fact be a lag deposit of the second rock avalanche event possibly triggered by an aftershock. The deposit is only visible at one locality within the cliffs that line the Ryton River, and its lack of geomorphic expression is attributed to it occurring closely after the LCRA2 event, while the Ryton River was still dammed from the second rock avalanche event. A wedge-block of some 35,000 m³ of source material for a future rock avalanche was identified at the summit of Carriage Drive. The dilation of the rock mass, combined with unfavourably oriented sub-vertical bedding in the Torlesse Supergroup bedrock, has allowed toppling-style failure on both of the main ridge lines around the source area for the LCRADs. In the event of a future rock avalanche occurring within the Ryton riverbed an emergency response plan has been developed to provide a staged response, especially in relation to the camping ground located at the mouth of the Ryton River. A long-term management plan has also been developed for mitigation measures for the Ryton riverbed and adjacent floodplain areas downstream of a future rock avalanche at the LCRAD site.

Research papers, University of Canterbury Library

It is not a matter of if a major earthquake will happen in New Zealand, it is when. Earthquakes wreak havoc, cut off power and water supply, lines of communication, sewer, supply chains, and transport infrastructure. People get injured and whole communities can get cut off the rest of the country for extended periods of time. Countries taking measures to increase the population's preparedness tend to suffer less severe consequences than those that do not. Disaster management authorities deliver comprehensive instructions and preparation guidance, yet communities remain grossly underprepared. There are multiple factors that influence motivation for preparedness. Personal experience is one of the most significant factors that influence preparedness motivation. Not many people will experience a severe and damaging earthquake in their lifetime. A serious game (SG) that is a computer simulation of an earthquake is a tool that can let participants experience the earthquake and its aftermath from the safety of their computer. The main result of this research is a positive answer to the question: Can a serious game motivate people to prepare for earthquakes at least just as good as a personal experience of at least a moderate earthquake? There are different levels of immersion this serious game can be implemented at. In this thesis the same earthquake experience scenario – SG “ShakeUp” is implemented as a desktop application and a virtual reality (VR) application. A user study is conducted with the aim of comparing the motivation level achieved by the two versions of the SG “ShakeUp”. In this study no benefits of using VR over traditional desktop application were found: participants trying both versions of the SG “ShakeUp” reported similar levels of motivation to prepare for earthquakes immediately after the experiment. This means that both versions of the experience were equally effective in motivating participants to prepare for earthquakes. An additional benefit of this result is that the cheaper and easier to deliver desktop version can be widely used in various education campaigns. Participants reported being more motivated to prepare for earthquakes by either version of the SG “ShakeUp” than by any other contributing factor, including their previous earthquake experience or participation in a public education campaign. Both versions of the SG “ShakeUp” can successfully overcome personal bias, unrealistic optimism, pessimism, lack of perceived control over one’s earthquake preparation actions, fatalism, and sense of helplessness in the face of the earthquakes and motivate the individual to prepare for earthquakes. Participants without the prior earthquake experience benefit most from the SG “ShakeUp” regardless of the version tried, compared to the participants who had experienced an earthquake: significantly more of them will reconsider their current level of earthquake preparedness; about 24% more of them attribute their increased level of motivation to prepare for earthquakes to the SG “ShakeUp”. For every earthquake preparation action there is about 25% more people who felt motivated to do it after trying the SG “ShakeUp” than those who have done this preparation action before the experiment. After trying either version of the SG “ShakeUp”, people who live in a free standing house and those who live in a rental property reported highest levels of intent to carry on with the preparation actions. The proposed application prototype has been discussed with the University of Canterbury Earthquake Centre and received very positive feedback as having potential for practical use by various disaster management authorities and training institutions. The research shows that the SG “ShakeUp” motivates people to prepare for earthquakes as good as a personal earthquake experience and can be successfully used in various education campaigns.

Research papers, University of Canterbury Library

Abstract The original intention for the Partnership Community Worker (PCW) project in 2006 was for it to be an extension of the Pegasus Health General Practice and furthermore to be a bridge between the community and primary healthcare. It was believed that a close working relationship between the Practice Nurse and the PCW would help the target population of Māori, Pacifica and low income people to address and overcome their perceived barriers to healthcare which included: finance, transport, anxiety, cultural issues, communication, or lack of knowledge. Seven years later although the PCW project has been deemed a success in the Canterbury District Health Board annual reports (2013-14) and community and government agencies, including the Christchurch Resettlement Service (2012), many of the Pegasus Health General Practices have not utilised the project to its full extent, hence the need for this research. I was interested in finding out in the first instance if the model had changed and, if so why, and in the second instance if the promotional material currently distributed by Pegasus Health Primary Health Organisation reflected the daily practice of the PCW. A combination of methods were used including: surveys to the Pegasus Health General Practices, interviews with PCWs, interviews with managers of both the PCW host organisations and referring agencies to the PCW project. All the questions asked of all the participants in this research were focussed on their own perception of the role of the PCW. Results showed that the model has changed and although the publications were not reflecting the original intention of the project they did reflect the daily practice of the PCWs who are now struggling to meet much wider community expectations and needs. Key Results: Partnership Community Worker (PCW) interviews: Seventeen PCWs of the 19 employed were interviewed face to face. A number expressed interest in more culturally specific training and some are pursuing qualifications in social work; for many pay parity is an issue. In addition, many felt overwhelmed by the expectations around clients with mental health issues and housing issues now, post-earthquakes. Medical Practice surveys: Surveys were sent to eighty-two Pegasus Health medical practices and of these twenty five were completed. Results showed the full capacity of the PCW role was not clearly understood by all with many believing it was mostly a transport service. Those who did understand the full complexity of the role were very satisfied with the outcomes. PCW Host Community Manager Interviews: Of the ten out of twelve managers interviewed, some wished for more communication with Pegasus Health management because they felt aspects of both the PCW role and their own role as managers had become blurred over time. Referring organisations: Fifteen of the fifty referring community or government organisations participated. The overall satisfaction of the service was high and some acknowledged the continuing need for PCWs to be placed in communities where they were well known and trusted. Moreover results also showed that both the Canterbury earthquakes 2010-2011 and the amalgamation of Partnership Health PHO and Pegasus Health Charitable Limited in 2013 have contributed to the change of the model. Further future research may also be needed to examine the long term effects on the people of Canterbury involved in community work during the 2011-2014 years.  

Audio, Radio New Zealand

1. AMY ADAMS to the Minister of Finance: What progress has the Government made this year in laying the foundations for a more ambitious and faster growing economy? 2. Hon PHIL GOFF to the Prime Minister: Does he stand by his statement that by early 2010 New Zealand will be coming out of the recession "reasonably aggressively"? 3. ALLAN PEACHEY to the Minister of Education: What feedback has she received about the quality of school reports to parents this year? 4. Hon CLAYTON COSGROVE to the Minister for Canterbury Earthquake Recovery: Is he satisfied that the Canterbury earthquake business support measures undertaken by the Government have worked as intended? 5. Dr KENNEDY GRAHAM to the Minister for Climate Change Issues (International Negotiations): Will the Cancun Agreements achieve the agreed goal of confining global warming to 2 degrees Celsius by 2020; if so, how? 6. Dr PAUL HUTCHISON to the Minister of Health: What reports has he received on improved access to medicines? 7. Hon DAMIEN O'CONNOR to the Prime Minister: Does he stand by his statement that "It's clearly been a large sum of money. But at the end of the day I gave a commitment to the families at Pike River I'd do everything I could to get their men out, I stand by that. I think the Government has done everything it can do so far"? 8. Dr CAM CALDER to the Minister of Corrections: Has she received any progress reports on the Government's Prisoner Skills and Employment Strategy? 9. Hon DAVID PARKER to the Minister for Economic Development: How many additional Cabinet papers has he submitted to Cabinet since he told the House in July "In my capacity as Minster for Economic Development I have submitted 14 papers to Cabinet in the last 6 months"? 10. HONE HARAWIRA to the Minister of Foreign Affairs: What steps has the New Zealand Government taken to denounce the shooting by Chilean forces of indigenous Rapa Nui, during an operation to evict them from stolen ancestral lands that they were seeking to reclaim? 11. Hon JIM ANDERTON to the Minister for ACC: Does he have any concerns about the way ACC in general and claims general manager Denise Cosgrove in particular, is interpreting ACC legislation regarding personal injury claims which are being declined on the basis of degeneration or pre-existing conditions? 12. COLIN KING to the Minister of Fisheries: How will fisheries officers be helping to better protect New Zealand's fisheries this summer?

Audio, Radio New Zealand

DAVID SHEARER to the Prime Minister: Does he stand by his statement “My expectations are that this will be a busy, hard three years’ work and we will need to deliver results for New Zealanders”? Dr RUSSEL NORMAN to the Prime Minister: Does he stand by his statement that “we don’t favour one group over another”? PAUL GOLDSMITH to the Minister of Finance: What reports has he received on housing affordability? GRANT ROBERTSON to the Prime Minister: When his office had a “quick look at the matters involved” with regard to the funding of the Mackenzie Sustainable Futures Trust, whom did they speak to and what documents did they look at to arrive at their conclusion that “we did not find anything that raised concerns to us”? MELISSA LEE to the Minister for Social Development: What initiatives has the Government put in place to better protect children? ANDREW WILLIAMS to the Minister of Finance: Does the Government still intend to achieve a budget surplus by 2014/15; if so, how? GARETH HUGHES to the Minister of Energy and Resources: Does he stand by his statement on the Campbell Live 9 February programme on fracking that, “In Taranaki, it’s actually been done very, very well. There’s been no effect on the environment whatsoever”? Dr JIAN YANG to the Minister of Health: What progress has been made in providing improved child health services? Hon DAVID PARKER to the Minister of Finance: Does he stand by his statement regarding migration to Australia “What’s the point of standing in the airport crying about it?”; if so, how many of the 158,167 people that have migrated to Australia since November 2008, as reported by Statistics NZ, are from 18 to 30 years of age in number and percentage terms? COLIN KING to the Minister of Science and Innovation: How will the Advanced Technology Institute boost business-led research and development? Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Why did he use section 27 of the Canterbury Earthquake Recovery Act 2011 to amend the Canterbury Regional Policy Statement instead of using the Order in Council provisions of the Act or developing the recovery strategy or a recovery plan? SHANE ARDERN to the Minister for Primary Industries: What recent announcements has he made to further improve New Zealand’s biosecurity system?

Audio, Radio New Zealand

DAVID SHEARER to the Prime Minister: Is it still a fundamental purpose of his Government to narrow the wage gap between New Zealand and Australia, and to grow local wages in New Zealand? TODD McCLAY to the Minister of Finance: What recent reports has he received on the economy? Hon DAVID PARKER to the Minister of Finance: In dollar terms, what is the shortfall in the tax-take for the nine months to March revealed in yesterday’s Financial Statements compared to October’s pre-election update? Dr RUSSEL NORMAN to the Minister of Finance: How much has been raised to date by the Earthquake Kiwi Bonds and, at this rate, how many years will it take to cover the Government’s estimated $5.5 billion liability resulting from the Canterbury earthquakes? Hon TAU HENARE to the Minister for Social Development: How will Budget 2012 provide greater support for young people most at risk of long-term welfare dependency? Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: Does he stand by the Prime Minister’s statement regarding asset sales that “We are not going to do anything tricky there”? Dr JIAN YANG to the Associate Minister of Health: How is the Government expanding its programme to reduce rheumatic fever in vulnerable communities? Hon ANNETTE KING to the Minister of Housing: Does he stand by all his comments regarding housing? JULIE ANNE GENTER to the Minister of Transport: What is the plan to pay for the Government’s transport expenditure given that the Ministry of Transport’s Briefing to the Incoming Minister warns of a funding shortfall of $4.9 billion if high oil prices and low GDP growth continue? MARK MITCHELL to the Minister for Economic Development: How is the Government improving value for money in its procurement of services for the public sector? DARIEN FENTON to the Minister of Labour: Does she stand by her statement that “I do not want to see unnecessary change for change’s sake. Rather I am looking to put in place pragmatic solutions as we implement our manifesto commitments and let employers, employees and business focus on what they do best.”? Rt Hon WINSTON PETERS to the Prime Minister: Does he still have confidence in the Minister for Social Development and the Associate Ministers for Social Development; if so, why?