Central City Delivery Plan Presentation - Short Version
Articles, UC QuakeStudies
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A document which describes the purpose of the Bill Perry Safety Awards and outlines each winning submission.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A consent granted by Environment Canterbury, providing consent to discharge water and contaminants to water.
A document which explains the rationale behind and development of City Care's Good to Go safety video.
A document which outlines the processes involved in the Multi Criteria Analysis Asset Prioritisation tool. It also talks about assumptions made and potential gaps.
A map showing the actual construction start dates.
A document which summarises each winning Bill Perry Safety Award submission.
A pdf copy of a presentation delivered at Building a Better New Zealand (BBNZ 2014) Conference. The presentation examines the relationship between innovation and productivity improvement in the construction industry.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A pdf copy of a PowerPoint presentation prepared for the Australia New Zealand Geotechnical Engineering Conference.
A paper prepared for the Bulletin of the New Zealand Society for Earthquake Engineering, Vol. 44, no. 4, December 2011.
A diagram which shows outputs from PDAT (with explanations).
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A paper describing the procedure and challenges associated with installing anchors through gabion baskets.
A diagram which shows outputs from PDAT calibration/validation (with explanations).
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A diagram which illustrates the proposed structure of an industry-wide training advisory board.
A diagram which illustrates the numbers of people trained to July 2016.
A paper prepared for the Water New Zealand 2014 conference which considers resilience lessons for reservoirs, pump stations and pipelines.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.