Search

found 2254 results

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Getting sorted. Most gear in place, still making adjustments".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Room 709 sofas".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Our office, Room 709".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Jess's desk. Viewed from my side of the couch".

Images, UC QuakeStudies

A photograph of an information sheet used by the Civil Defence during the Christchurch Earthquake Response. The information sheet consists of a map of the original cordon set up in central Christchurch after the 22 February 2011 earthquake and a map of the cordon on Sunday 27 March 2011.

Images, UC QuakeStudies

A photograph of the earthquake damage to a block of buildings in central Christchurch. The basement of the buildings have collapsed and the concrete blocks have spilled into the car park. Large cracks have also formed in between the blocks in the walls of the building to the left.

Research Papers, Lincoln University

The increase in urban population has required cities to rethink their strategies for minimising greenhouse gas impacts and adapting to climate change. While urban design and planning policy have been guided by principles such as walkability (to reduce the dependence on cars) and green infrastructure (to enhance the quality of open spaces to support conservation and human values), there have been conflicting views on what spatial strategies will best prepare cities for a challenging future. Researchers supporting compact cities based upon public Transit Oriented Development have claimed that walkability, higher density and mixed-uses make cities more sustainable (Owen, 2009) and that, while green spaces in cities are necessary, they are dull in comparison with shopfronts and street vendors (Speck, 2012, p 250). Other researchers claim that green infrastructure is fundamental to improving urban sustainability and attracting public space users with improved urban comfort, consequently encouraging walkability (Pitman and Ely, 2013). Landscape architects tend to assume that ‘the greener the better’; however, the efficiency of urban greenery in relation to urban comfort and urbanity depends on its density, distribution and the services provided. Green infrastructure can take many forms (from urban forests to street trees) and provide varied services (amended microclimate, aesthetics, ecology and so forth). In this paper, we evaluate the relevance of current policy in Christchurch regarding both best practice in green infrastructure and urban comfort (Tavares, 2015). We focus on the Christchurch Blueprint for rebuilding the central city, and critically examine the post-earthquake paths the city is following regarding its green and grey infrastructures and the resulting urban environment. We discuss the performance and appropriateness of the current Blueprint in post-earthquake Christchurch, particularly as it relates to the challenges that climate change is creating for cities worldwide.

Images, UC QuakeStudies

A photograph taken from the top of the BNZ building. The photograph is captioned by BeckerFraserPhotos, "Finally, the mess outside Coffee Culture on High Street has been cleared and demolition work will complete what the earthquake began. The red containers in the background are Fletchers containers, servicing the Hotel Grand Chancellor deconstruction".

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "A view from Cambridge Terrace towards Cathedral Square. The partially deconstructed Hotel Grand Chancellor no longer dominates the sky line. Here it appears between the PricewaterhouseCoopers building on the left and the Novotel Hotel on the right".

Images, UC QuakeStudies

A photograph taken from the top of the BNZ building. The photograph is captioned by BeckerFraserPhotos, "There are workers suspended from a cage about a third of the way up the Pacific Tower as well as a couple of workers on the top penthouse floor. It's hard to see where they are suspended from".

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "An old advertisments which was revealed on a building on Lichfield Street when its neighbour was demolished. The advertisement reads 'New Zealand Candle Co Ltd.' and then adds 'Five Medal, British Sperm', which are brands of candle".

Images, UC QuakeStudies

A photograph of the earthquake damage to a building in central Christchurch. Broken glass and other rubble litters the courtyard in front of the building. There is a large crack in the brick wall to the right. A red sticker on the glass door indicates that the building is unsafe to enter.

Images, UC QuakeStudies

A photograph of workers preparing breakfast for the emergency management personnel in Latimer Square. The workers are wearing high-visibility vests and hair nets. A sign on one of the tent poles reads, "Please wash hand before approaching the food tables, thank you".

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "The Christchurch Central Police Station. It has recently been announced that the Police will vacate this building, as it is not considered safe enough for Police headquarters. It is not clear what will happen to the building which may be strong enough for a less critical operation".

Images, UC QuakeStudies

The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. Reception. This is where students used to come to enquire about support services".

Images, UC QuakeStudies

A view of the UBS building at the University of Canterbury, seen from level 7 of the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. The University Book Shop building".

Images, UC QuakeStudies

A member of the University of Canterbury's E-Learning team in their temporary office in the James Hight building. The photographer comments, "First looks at our new temporary (maybe) office space. Our group will stay here until April or May 2011, then will move to another floor in the Central Library. South view over trees to the hills".