Avonhead Park Cemetery Interment Site. Central plinth. Inscription reads: "Etched in our City’s memory, never to be forgotten. The City of Christchurch" in Spanish. File reference: CCL-2012-02-27-AvonheadParkCemeteryIntermentSite-February-2012 DSC_026.JPG From the collection of Christchurch City Libraries.
Avonhead Park Cemetery Interment Site. Central plinth. Inscription reads: "Etched in our City’s memory, never to be forgotten. The City of Christchurch". File reference: CCL-2012-02-27-AvonheadParkCemeteryIntermentSite-February-2012 DSC_027.JPG From the collection of Christchurch City Libraries.
Avonhead Park Cemetery Interment Site. Central plinth. Inscription reads: "Etched in our City’s memory, never to be forgotten. The City of Christchurch" in Filipino. File reference: CCL-2012-02-27-AvonheadParkCemeteryIntermentSite-February-2012 DSC_028.JPG From the collection of Christchurch City Libraries.
None
Provides information about the redevelopment of Christchurch central city following February’s earthquake and the draft plan. Includes a virtual tour through the city, pre and post quake.
Bob Parker, Christchurch mayor and Peter Townsend, chief executive of the Canterbury Employers' Chamber of Commerce. The Christchurch City Council has unveiled its $2 billion vision for the rebuild of earthquake-hit central Christchurch.
The building has a green ticket - now just needs a tidy up inside. File Reference: CCL-CE-2010-09-07-DSC01930 From the collection of Christchurch City Libraries
Photograph captioned by BeckerFraserPhotos, "Looking along Gloucester Street from the Oxford Terrace intersection. The central library is to the left".
The ground floor of the Central Library on Gloucester Street. Books have fallen off the shelves and are in piles in the aisles.
None
None
None
None
Site of CCDU, the Government agency responsible for rebuilding Christchurch after the earthquakes and resulting demolition. Includes vision for the city, profile of the director, reasons to invest in Christchurch central, work programme for the unit, and video file.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition06 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition01 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition07 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition09 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition10 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition03 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition04 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition02 From the collection of Christchurch City Libraries.
Photos of the old Canterbury Public Library being demolished. File reference: CCL-2011-09-29-librarydemolition08 From the collection of Christchurch City Libraries.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A PDF copy of pages 274-275 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Central City Plan (Draft Central City Recovery Plan for Ministerial Approval, December 2011)'. Photos with permission: CCC
The Earthquake Recovery Minister Gerry Brownlee is denying accusations he's about to engineer a central government takeover of the rebuild of central city Christchurch.