Stakeholder Management Plan
Articles, UC QuakeStudies
A plan which outlines the scope, approach and key deliverables for communications and stakeholder engagement for SCIRT. The first version of this plan was produced on 7 January 2013.
A plan which outlines the scope, approach and key deliverables for communications and stakeholder engagement for SCIRT. The first version of this plan was produced on 7 January 2013.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A plan which sets out how SCIRT will carry out internal communication over the life of its programme of work. The first version of this plan was produced on 24 January 2011.
A plan which defines the framework for performance measurement to align SCIRT with the objectives from the Alliance Agreement objectives. The first version of this plan was produced on 20 August 2011.
A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
A plan which documents the process SCIRT will follow to identify and pass on learnings from its programme of work. The first version of this plan was produced on 21 June 2016.
A submission produced by the consultancies for the ACENZ Innovate NZ Awards of Excellence 2016, providing details about how the design team supporting SCIRT was formed, and how successful design delivery was achieved.
A plan which proactively addresses the risk of fraud and lays out the actions that SCIRT will take when any suspected fraud is reported or discovered. The first version of this plan was produced on 12 February 2014.
A document containing examples of newsletters printed and distributed to the inner city businesses and residents, to prepare them for the upcoming SCIRT rebuild work and update them on the positive progress being made.
A document containing examples of items provided in a folder for businesses. These are taken to the initial face-to-face meeting with business owners to discuss the impact and disruption of upcoming SCIRT rebuild works.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.
A document which outlines how to work safely around underground services, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to work safely in confined spaces, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to work safely in trenches and excavations, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to safely carry out lifting operations, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to work safely at height and depth, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to keep site staff and public safe around mobile plant, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to keep site staff and public safe around traffic, created to discuss with site staff at on-site "toolbox talks".
A tool, in the form of an A5 card, given to workshop and toolbox participants, outlining five easy steps to minimise the impact of roadworks on businesses.
A web story about the return of the stone lions to the Memorial Arch.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A web story about a site visit to the Bridge and Arch by local school pupils.
A web story about the model design work by Christ's College pupils.
Posters which describe the earthquake damage, planned restoration methods and historic information about the Bridge of Remembrance and Memorial Arch. These posters were hung on the fencing around the Bridge and Arch to inform the public about the work taking place.
A copy of the award application for the Canterbury Heritage Awards 2016.
A document which provides simple, easy to understand environmental advice and guidance for civil construction contractors.