A poster which was prepared to go with the award application for the Canterbury Heritage Awards 2016.
A promotional flyer which describes the experiences of four For Real recruits.
A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
An award application for the Civil Contractors NZ Hirepool Construction Excellence Awards 2015 which details Downer's approach to repairing the Armagh Street bridge.
A diagram created in 2011, showing the communication structure across rebuild agencies.
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
A report created by BRANZ, the University of Auckland and Constructing Excellence New Zealand which was commissioned by the Productivity Partnership. It examines the use of KPIs by a number of rebuild organisations.
An abstract which describes the content of Trent Beckman-Cross's full PhD thesis.
A document describing the early warning system to alert team members of ground and structural movement at the Arch.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A paper published in the Journal of Structural Integrity and Maintenance, 2016, Vol. 1, No. 2, 88-93, which outlines the importance of asset registers and level of service in the wake of a disaster.
A document that outlines how timely and accurate information relating to estimating, actual project costs, future commitments, and total forecast cost, will be managed and reported for each project phase in the programme.
A document which outlines several of Drain Surgeons' safety initiatives; developed when carrying out CCTV operations.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A design guideline which provides guidance to designers on how to carry out a whole of life evaluation of rebuild options.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A presentation created by LINZ, explaining the application and benefits of the National Forward Works Viewer.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A document which describes the purpose of the Bill Perry Safety Awards and outlines each winning submission.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A consent granted by Environment Canterbury, providing consent to discharge water and contaminants to water.
A document which explains the rationale behind and development of City Care's Good to Go safety video.
A document which outlines the processes involved in the Multi Criteria Analysis Asset Prioritisation tool. It also talks about assumptions made and potential gaps.