Small, tight-knit communities, are complex to manage from outside during a disaster. The township of Lyttelton, New Zealand, and the communities of Corsair Bay, Cass Bay, and Rapaki to the east, are especially more so difficult due to the terrain that encloses them, which caused them to be cut-off from Christchurch, the largest city in the South Island, barely 10 km away, after the Mw 7.1 Darfield Earthquake and subsequent Canterbury Earthquake Sequence. Lyttelton has a very strong and deep-rooted community spirit that draws people to want to be a part of Lyttelton life. It is predominantly residential on the slopes, with retail space, service and light industry nestled near the harbour. It has heritage buildings stretching back to the very foundation of Canterbury yet hosts the largest, modern deep-water port for the region. This study contains two surveys: one circulated shortly before the Darfield Earthquake and one circulated in July 2011, after the Christchurch and Sumner Earthquakes. An analytical comparison of the participants’ household preparedness for disaster before the Darfield Earthquake and after the Christchurch and Sumner Earthquakes was performed. A population spatiotemporal distribution map was produced that shows the population in three-hourly increments over a week to inform exposure to vulnerability to natural hazards. The study went on to analyse the responses of the participants in the immediate period following the Chrsitchurch and Sumner Earthquakes, including their homeward and subsequent journeys, and the decision to evacuate or stay in their homes. Possible predictors to a decision to evacuate some or all members of the household were tested. The study also asked participants’ views on the events since September 2010 for analysis.
Reinforced concrete buildings that satisfied modern seismic design criteria generally behaved as expected during the recent Canterbury and Kaikoura earthquakes in New Zealand, forming plastic hinges in intended locations. While this meant that life-safety performance objectives were met, widespread demolition and heavy economic losses took place in the aftermath of the earthquakes.The Christchurch central business district was particularly hard hit, with over 60% of the multistorey reinforced concrete buildings being demolished. A lack of knowledge on the post-earthquake residual capacity of reinforced concrete buildings was a contributing factor to the mass demolition.Many aspects related to the assessment of earthquake-damaged reinforced concrete buildings require further research. This thesis focusses on improving the state of knowledge on the post earthquakeresidual capacity and reparability of moderately damaged plastic hinges, with an emphasis on plastic hinges typical of modern moment frame structures. The repair method focussed on is epoxy injection of cracks and patching of spalled concrete. A targeted test program on seventeen nominally identical large-scale ductile reinforced concrete beams, three of which were repaired by epoxy injection following initial damaging loadings, was conducted to support these objectives. Test variables included the loading protocol, the loading rate, and the level of restraint to axial elongation.The information that can be gleaned from post-earthquake damage surveys is investigated. It is shown that residual crack widths are dependent on residual deformations, and are not necessarily indicative of the maximum rotation demands or the plastic hinge residual capacity. The implications of various other types of damage typical of beam and column plastic hinges are also discussed.Experimental data are used to demonstrate that the strength and deformation capacity of plastic hinges with modern seismic detailing are often unreduced as a result of moderate earthquake induced damage, albeit with certain exceptions. Special attention is given to the effects of prior yielding of the longitudinal reinforcement, accounting for the low-cycle fatigue and strain ageing phenomena. A material-level testing program on the low-cycle fatigue behaviour of grade 300E reinforcing steel was conducted to supplement the data available in the literature.A reduction in stiffness, relative to the initial secant stiffness to yield, occurs due to moderate plastic hinging damage. This reduction in stiffness is shown to be correlated with the ductility demand,and a proposed model gives a conservative lower-bound estimate of the residual stiffness following an arbitrary earthquake-type loading. Repair by epoxy injection is shown to be effective in restoring the majority of stiffness to plastic hinges in beams. Epoxy injection is also shown to have implications for the residual strength and elongation characteristics of repaired plastic hinges.
It is fast becoming common practice for civil engineering infrastructure and building structures to be designed to achieve a set of performance objectives. To do so, consideration is now being given to systems capable of sustaining minimal damage after an earthquake while still being cost competitive. This has led to the development of high performance seismic resisting systems, followed by advances in design methodologies. The paper presents the experimental response of four pre-cast, post-tensioned rocking walls with high-performing dissipating solutions tested on the shake-table at the University of Canterbury. The wall systems were designed as a retrofit solution for an existing frame building however, can also be used for the design of new, high-performance structures. The use of externally mounted dampers allowed numerous dissipation schemes to be explored including mild-steel dampers (hysteretic dampers), viscous dampers, a combination of both or no dampers. The advantages of both velocity and displacement dependant dissipation was investigated for protection against strong ground motions with differing rupture characteristics i.e. far-field and near-field events. The experimental results are used to verify a proposed design procedure for post-tensioned rocking systems with supplementary hysteretic and viscous dissipation. The predicted response compared well with the measured shake-table response.
Post-earthquake cordons have been used after seismic events around the world. However, there is limited understanding of cordons and how contextual information of place such as geography, socio-cultural characteristics, economy, institutional and governance structure etc. affect decisions, operational procedures as well as spatial and temporal attributes of cordon establishment. This research aims to fill that gap through a qualitative comparative case study of two cities: Christchurch, New Zealand (Mw 6.2 earthquake, February 2011) and L’Aquila, Italy (Mw 6.3 earthquake, 2009). Both cities suffered comprehensive damage to its city centre and had cordons established for extended period. Data collection was done through purposive and snowball sampling methods whereby 23 key informants were interviewed in total. The interviewee varied in their roles and responsibilities i.e. council members, emergency managers, politicians, business/insurance representatives etc. We found that cordons were established to ensure safety of people and to maintain security of place in both the sites. In both cities, the extended cordon was met with resistance and protests. The extent and duration of establishment of cordon was affected by recovery approach taken in the two cities i.e. in Christchurch demolition was widely done to support recovery allowing for faster removal of cordons where as in L’Aquila, due to its historical importance, the approach to recovery was based on saving all the buildings which extended the duration of cordon. Thus, cordons are affected by site specific needs. It should be removed as soon as practicable which could be made easier with preplanning of cordons.
Hon PHIL HEATLEY to the Minister of Finance: What reports has he received on the economy – and especially on further signs of economic momentum in the regions and among manufacturers? Dr RUSSEL NORMAN to the Minister of Finance: How much did the Government's share sales in Mighty River Power, Meridian, and Air New Zealand raise, given that the Supplement to the 2010 Investment Statement of the Government of New Zealand projected that those sales would raise $5.18 billion? Hon DAVID PARKER to the Minister for ACC: How much did ACC invest in Pike River Coal Limited and in New Zealand Oil and Gas Limited over the last eight years, and how much has it made or lost in total on its investment in each company, taking into account share purchases, subscriptions and sales, dividends, and current share prices? Rt Hon WINSTON PETERS to the Minister of Māori Affairs: Does he stand by his statement "I know Māori want to talk about the place of the Treaty of Waitangi in our constitution, and how our legal and political systems can reflect tikanga Māori."; if so, why? Hon SHANE JONES to the Associate Minister of Finance: Is he satisfied with his performance in regard to his delegations as Associate Minister of Finance? JONATHAN YOUNG to the Minister for Building and Construction: What reports has he received regarding the state of the building and construction sector? GARETH HUGHES to the Minister for the Environment: Did the Environmental Protection Authority assess the full version of Anadarko's Discharge Management Plan and Emergency Response Plan as part of its evaluation of the company's Environmental Impact Assessment for the Deepwater Taranaki Well; if not, why not? Hon CLAYTON COSGROVE to the Minister of Finance: When, if at all, did Cabinet approve the timing of the Air New Zealand sell-down and what directions did Cabinet give the shareholding Ministers? NICKY WAGNER to the Minister of Housing: What steps is the Government taking to rebuild Christchurch's housing stock damaged or destroyed by the earthquakes? Hon DAMIEN O'CONNOR to the Minister for Primary Industries: Does he stand by his statement "The opportunity, and challenge, for our meat producers now is to add value to different cuts of meat and continue to sell the New Zealand story"; if so, why? IAN McKELVIE to the Minister of Local Government: How is the Government improving councils' financial reporting? DARIEN FENTON to the Minister of Labour: Does he stand by his statement that "I am especially keen to hear what affected parties have to say on the Part 6A proposals in the Bill, and will carefully consider their submissions and the recommendations of the select committee"?
We examined the stratigraphy of alluvial fans formed at the steep range front of the Southern Alps at Te Taho, on the north bank of the Whataroa River in central West Coast, South Island, New Zealand. The range front coincides with the Alpine Fault, an Australian-Pacific plate boundary fault, which produces regular earthquakes. Our study of range front fans revealed aggradation at 100- to 300-year intervals. Radiocarbon ages and soil residence times (SRTs) estimated by a quantitative profile development index allowed us to elucidate the characteristics of four episodes of aggradation since 1000 CE. We postulate a repeating mode of fan behaviour (fan response cycle [FRC]) linked to earthquake cycles via earthquake-triggered landslides. FRCs are characterised by short response time (aggradation followed by incision) and a long phase when channels are entrenched and fan surfaces are stable (persistence time). Currently, the Te Taho and Whataroa River fans are in the latter phase. The four episodes of fan building we determined from an OxCal sequence model correlate to Alpine Fault earthquakes (or other subsidiary events) and support prior landscape evolution studies indicating ≥M7.5 earthquakes as the main driver of episodic sedimentation. Our findings are consistent with other historic non-earthquake events on the West Coast but indicate faster responses than other earthquake sites in New Zealand and elsewhere where rainfall and stream gradients (the basis for stream power) are lower. Judging from the thickness of fan deposits and the short response times, we conclude that pastoral farming (current land-use) on the fans and probably across much of the Whataroa River fan would be impossible for several decades after a major earthquake. The sustainability of regional tourism and agriculture is at risk, more so because of the vulnerability of the single through road in the region (State Highway 6).
Very little research exists on total house seismic performance. This testing programme provides stiffness and response data for five houses of varying ages including contributions of non-structural elements. These light timber framed houses in Christchurch, New Zealand had minor earthquake damage from the 2011 earthquakes and were lateral load tested on site to determine their strength and stiffness, and preliminary damage thresholds. Dynamic characteristics were also investigated. Various loading schemes were utilised including quasi-static loading above the foundation, unidirectional loading through the floor diaphragm, cyclic quasi-static loading and snapback tests. Dynamic analysis on two houses provided the seismic safety levels of post-quake houses with respect to local hazard levels. Compared with New Zealand Building Standards all the tested houses had an excess of strength, damage is a significant consideration in earthquake resilience and was observed in all of the houses. A full size house laboratory test is proposed.
Two people crawl across a desert littered with animal bones and skulls towards the words 'Land reports' in the distance. The woman says 'Don't get your hopes up! It's probably a mirage!' Context - On Thursday 23 June Prime Minister John Key, Canterbury Earthquake Recovery Minister Gerry Brownlee and representatives from engineering consultants Tonkin & Taylor announced the first part of the Government's long-awaited land report that revealed the fate of up to 5000 quake-damaged homes. Quantity: 1 digital cartoon(s).
Two skeletal people sit in armchairs waist-deep in silt. The man is reading the newspaper and says 'The wait's over! The Land Report's due out dear!... DEAR?' He realises that his wife, whose bony hand clutches 'EQC update No. 37', is dead. Context - On Thursday 23 June Prime Minister John Key, Canterbury Earthquake Recovery Minister Gerry Brownlee and representatives from engineering consultants Tonkin & Taylor announced the first part of the Government's long-awaited land report that revealed the fate of up to 5000 quake-damaged homes. Quantity: 1 digital cartoon(s).
Museums around the world are often affected by major catastrophes, and yet planning for these disasters is an often neglected aspect of museum practice. New Zealand is not immune from these events, as can be seen in the recent series of serious earthquakes in Christchurch in 2010 and 2011. This dissertation considers how prepared the New Zealand museum sector is to handle unexpected events that negatively affect its buildings, staff, operations and treasured collections. The central research question was: What is the overall state of emergency planning in the New Zealand museum sector? There was a significant gap in the literature, especially in the local context, as there has been only one other comparable study conducted in Britain, and nothing locally. This dissertation makes a valuable contribution to the field of museum studies by drawing on theory from relevant areas such as crises management literature and by conducting original empirical research on a topic which has received little attention hitherto. The research employed a number of methods, including a review of background secondary sources, a survey and interviews. After contextualising the study with a number of local examples, Ian online survey was then developed an which enabled precise understanding of the nature of current museum practices and policies around emergency planning. Following this I conducted several interviews with museum professionals from a variety of institutional backgrounds which explored their thoughts and feelings behind the existing practices within the industry. The findings of the research were significant and somewhat alarming: almost 40% of the museum and galleries in New Zealand do not have any emergency plan at all, and only 11% have what they considered ‘complete’ plans. The research revealed a clear picture of the current width and depth of planning, as well as practices around updating the plans and training related to them. Within the industry there is awareness that planning for emergencies is important, but museum staff typically lack the knowledge and guidance needed to conduct effective emergency planning. As a result of the analysis, several practical suggestions are presented aimed at improving emergency planning practices in New Zealand museums. However this study has implications for museum studies and for current museum practice everywhere, as many of the recommendations for resolving the current obstacles and problems are applicable anywhere in the world, suggesting that New Zealand museums could become leaders in this important area.
The cartoon depicts a little plant with two tiny leaves; text reads 'THE GARDEN CITY'. A second version includes the words 'Begins to grow again'. Context - The earliest stages of the rebuilding of Christchurch after the earthquakes of 4 September 2010 and 22 February 2011. Quantity: 2 digital cartoon(s).
The cartoon shows stenciled text in black and white that reads 'GRIEF THE PRICE WE PAY FOR LOVE'. Context - The earliest stages of the rebuilding of Christchurch after the earthquakes of 4 September 2010 and 22 February 2011. Quantity: 1 digital cartoon(s).
4th September 2010 a 7.1 magnitude earthquake strikes near Christchurch, New Zealand’s second largest city of approximately 370,000 people. This is followed by a 6.3 magnitude quake on 22nd February 2011 and a 6.4 on 13th June. In February 181 people died and a state of national emergency was declared from 23 February to 30th April. Urban Search and Rescue teams with 150 personnel from New Zealand and 429 from overseas worked tirelessly in addition to Army, Police and Fire services. Within the central business district 1,000 buildings (of 4,000) are expected to be demolished. An estimated 10,000 houses require demolition and over 100,000 were damaged. Meanwhile the over 7,000 aftershocks have become part of the “new normal” for us all. During this time how have libraries supported their staff? What changes have been made to services? What are the resourcing opportunities? This presentation will provide a personal view from Lincoln University, Te Whare Wanaka o Aoraki, Library Teaching and Learning. Lincoln is New Zealand's third oldest university having been founded in 1878. Publicly owned and operated it is New Zealand's specialist land-based university. Lincoln is based on the Canterbury Plains, 22 kilometres south of Christchurch. On campus there was mostly minor damage to buildings while in the Library 200,000 volumes were thrown from the shelves. I will focus on the experiences of the Disaster Team and on our experiences with hosting temporarily displaced staff and students from the Christchurch Polytechnic Institute of Technology, Library, Learning & Information Services. Experiences from two other institutions will be highlighted: Christchurch City Libraries, Ngā Kete Wānanga-o-Ōtautahi. Focusing on the Māori Services Team and the Ngā Pounamu Māori and Ngāi Tahu collections. The Central library located within the red zone cordon has been closed since February, the Central library held the Ngā Pounamu Māori and Ngai Tahu collections, the largest Māori collections in the Christchurch public library network. The lack of access to these collections changed the way the Māori Services Team, part of the larger Programmes, Events and Learning Team at Christchurch City Libraries were able to provide services to their community resulting in new innovative outreach programmes and a focus on promotion of online resources. On 19th December the “temporary” new and smaller Central library Peterborough opened. The retrieved Ngā Pounamu Māori and Ngai Tahu collections "Ngā rakau teitei e iwa”, have since been re-housed and are once again available for use by the public. Te Rūnanga o Ngāi Tahu. This organisation, established by the Te Rūnanga o Ngāi Tahu Act 1996, services the statutory rights for the people of Ngāi Tahu descent and ensures that the benefits of their Treaty Claim Settlement are enjoyed by Ngāi Tahu now and in the future. Ngāi Tahu are the indigenous Māori people of the southern islands of New Zealand - Te Waipounamu. The iwi (people) hold the rangatiratanga or tribal authority to over 80 per cent of the South Island. With their headquarters based in the central business they have also had to be relocated to temporary facilities. This included their library/archive collection of print resources, art works and taonga (cultural treasures).
An often overlooked aspect of urban housing development is the composition of the space between buildings; the streetscape. The pressures of suppressing suburban sprawl have seen housing developments respond by increasing residential density within more centralised city sites. Medium-density housing typologies are often used as urban infill in response to the challenge of accommodating an increasing population. A by-product of these renewed areas is the creation of new open space which serves as the fundamental public space for sociability to develop in communities. Street space should emphasise this public expression by encouraging social exchange and interaction. As a result, a neighbourhood owes its liveliness (or lack thereof) to its streets. The issue of density when applied to the urban housing landscape encompasses two major components: the occupancy of both the private realms, constituting the residential built form, and the public spaces that adjoins them, the streets. STREETSCAPE: dialogues of street + house. Continual transition between the realms of public and private (building and street space) enact active edges, giving way to public stimulation; the opportunity for experiencing other people. The advent of seeing and hearing other people in connection with daily comings and goings encourages social events to evolve, enhancing the notion of neighbourly conduct. Within New Zealand, and specifically in Christchurch as considered here, the compositions of current streetscapes lack the demeanor to really encourage and facilitate the idea of neighbourly interaction and public expression. Here lies the potential for new street design to significantly heighten the interplay of human activity. In response, this research project operates under the notion that the street spaces of urban residential areas are largely underutilised. This lack is particularly evident in the street. Street design should strive to produce spaces which stimulate the public life of residents. There exists a need to reassert eminence of the street as a space for vibrant neighbourhood life. This thesis employs design as a tool for researching and will involve using numerous concept generators to trigger the production of multiple scenarios. These scenarios are to explore the ways in which the streetscapes within medium-density urban communities could respond in the event of (re) development.
The 22nd February 2011, Mw 6.3 Christchurch earthquake in New Zealand caused major damage to critical infrastructure, including the healthcare system. The Natural Hazard Platform of NZ funded a short-term project called “Hospital Functions and Services” to support the Canterbury District Health Board’s (CDHB) efforts in capturing standardized data that describe the effects of the earthquake on the Canterbury region’s main hospital system. The project utilised a survey tool originally developed by researchers at Johns Hopkins University (JHU) to assess the loss of function of hospitals in the Maule and Bío-Bío regions following the 27th February 2010, Mw 8.8 Maule earthquake in Chile. This paper describes the application of the JHU tool for surveying the impact of Christchurch earthquake on the CDHB Hospital System, including the system’s residual capacity to deliver emergency response and health care. A short summary of the impact of the Christchurch earthquake on other CDHB public and private hospitals is also provided. This study demonstrates that, as was observed in other earthquakes around the world, the effects of damage to non-structural building components, equipment, utility lifelines, and transportation were far more disruptive than the minor structural damage observed in buildings (FEMA 2007). Earthquake related complications with re-supply and other organizational aspects also impacted the emergency response and the healthcare facilities’ residual capacity to deliver services in the short and long terms.
Text above reads 'Central Christchurch business owners protest' and the words 'Cordon Blur' (wordplay on famous cookery schools 'Cordon Bleu' and 'blur' as in 'unclear'). The cartoon shows a striped barrier bearing the words 'KEEP OUT' that is being torn to pieces. A second version continues the text to read 'Central Christchurch business owners protest as future directions unclear'. Context - Protests from angry Christchurch business owners locked out of the damaged CBD have intensified today, with police physically intervening when several protesters went inside the cordon. They are worried about the state of their businesses inside the red zone, and say they have not been allowed in to collect critical records and basic tools so they can carry on working outside the cordon. (NZ Herald 21 March 2011) Quantity: 2 digital cartoon(s).
The cartoon shows a digger dredging through the rubble and digging up a red heart representing 'hope' (Tom Scott doesn't do colour so this is significant). A rescuer nearby yells 'Careful! It's still beating'. Context - on 22 February 2011 a 6.3 magnitude earthquake struck in Christchurch which has probably killed more than 200 people (at this point the number is still not known) and caused much more severe damage. There were many people trapped in collapsed buildings and it was apparent in only two or three days that in most cases they could not have survived but of course people still held out impossible hope. Quantity: 1 digital cartoon(s).
Cartoon shows a game of hopscotch that illustrates the changing face of the entity with responsibility for the Christchurch rebuild after the earthquakes. Three versions of this cartoon are available Quantity: 3 digital cartoon(s).
RON MARK to the Prime Minister: Does he stand by all his statements; if so, how? ANDREW LITTLE to the Prime Minister: Does he stand by his statement that “if you see house prices rising, you might say the Government needs to do more” and “we take responsibility, we need to do a better job of it”? SARAH DOWIE to the Minister of Finance: What international reports has he received showing New Zealand’s economic growth remains robust? Hon ANNETTE KING to the Minister of Health: On what date was the Ministry of Health first made aware of data manipulation of the six-hour Emergency Department target by district health boards? CHRIS BISHOP to the Minister for Economic Development: What recent announcements has the Government made regarding support for earthquake-affected businesses? METIRIA TUREI to the Minister for Building and Housing: Ka tū a ia i runga i te mana o tana kōrero, “The proportion of New Zealanders living in rental homes is not changing dramatically and owner-occupiers will remain the dominant living arrangement for most Kiwi families into the future” i te mea, ā, e ai ki ngā tatauranga hou, nō mai anō i te tau Kotahi mano, iwa rau, rima tekau mā tahi, i taka ai te hunga whiwhi i tōna ake whare, ki raro rā nō? Translation: Does he stand by his statement that “The proportion of New Zealanders living in rental homes is not changing dramatically and owner-occupiers will remain the dominant living arrangement for most Kiwi families into the future” given that home ownership is at its lowest level since 1951, according to the latest census? STUART SMITH to the Minister for Primary Industries: What recent announcements has he made regarding support for earthquake-affected primary sectors? GRANT ROBERTSON to the Minister of Finance: Does he agree with the Prime Minister’s statement that Treasury forecasts are “a load of nonsense, because they can’t get predications in 44 days right, let alone 44 years”? ALFRED NGARO to the Minister for Building and Housing: What additional Auckland housing projects did he announce during last week’s recess, and what are the latest reports on the growth in construction across Auckland showing? Dr MEGAN WOODS to the Minister responsible for the Earthquake Commission: Is he confident EQC will be employing the necessary resource to process and settle claims, from both the Canterbury earthquake sequence and the earthquake sequence of a fortnight ago, after 16 December; if so, why? DAVID SEYMOUR to the Minister of Police: What reassurance can she give to Epsom residents concerned that their Community Policing Centre will cease to operate after 24 years? IAN McKELVIE to the Minister of Commerce and Consumer Affairs: What announcements has he made recently that support the continued growth of the New Zealand wine export market?
METIRIA TUREI to the Minister for the Environment: Ki Te Minita mō Te Taiao: Ka tukua e ngā paerewa e whakaarohia akehia nei mō te pai ake o te wai i roto i te pūhera Wai Mā, te kaha kē atu, te iti kē iho rānei o te uru atu o te tūkinotanga ki roto i ō tātou awa wai, e ngā mea whakakapi? Translation: Do the proposed standards for water quality in the Clean Water package allow more pollution or less to enter our waterways than the ones they will replace? BRETT HUDSON to the Minister of Finance: How much is the Government committing to spend on infrastructure over the next 4 years? ANDREW LITTLE to the Prime Minister: Given his predecessor told the Pike River families, “I’m here to give you absolute reassurance we’re committed to getting the boys out, and nothing’s going to change that”, when, if ever, will he be announcing the re-entry of the drift? STUART SMITH to the Minister of Transport: What announcements has he made recently regarding the Government’s commitment to reinstate key transport links following the Kaikōura earthquake? JACINDA ARDERN to the Minister for Children: When was she first notified that the Ministry for Vulnerable Children Oranga Tamariki, or its predecessor CYF, were placing children and younger persons in a hotel or motel for short-term care without a supervisor, and what was her first action, if any? MELISSA LEE to the Minister of Health: Can he confirm that 55,000 care and support workers will share in the $2 billion pay equity settlement announced on 18 April 2017? GRANT ROBERTSON to the Minister of Finance: Does he agree with the Dominion Post editorial that his Government has “singularly failed to answer the pressures of Auckland”; if not, why does he think they would write this? ANDREW BAYLY to the Minister for Building and Construction: How do the latest reports on the level of building activity in Auckland and nationwide for the month, quarter, and year compare with 2016? Rt Hon WINSTON PETERS to the Prime Minister: Does he stand by all his statements; if so, how? PHIL TWYFORD to the Minister of Transport: Why has the completion of the $2.4 billion Western Ring Route been delayed, and when can Aucklanders expect the new motorway to be open? EUGENIE SAGE to the Minister of Conservation: Is it Government policy to increase the logging of native forests on West Coast conservation land? Dr MEGAN WOODS to the Minister supporting Greater Christchurch Regeneration: Does she agree that the first homes in the East Frame will be completed 5 months ahead of schedule? Questions to Members CLARE CURRAN to the Chairperson of the Commerce Committee: Does she intend to call for further submissions on the petition of Dame Fiona Kidman before it is reported back to the House, in light of the recently released footage shot inside the drift of the Pike River mine?
A crowd of Christchurch rugby fans wearing the red and black colours, gather to wish the Crusaders well as they leave for Australia. Someone shouts 'Red and black... It's one zone we ALL belong in!' Context - The Reds (Queensland) and Crusaders (Christchurch) played on the 11th July in the Final of the Investec Super Rugby competition at Suncorp Stadium, Brisbane. The Crusaders were narrowly beaten 18-13. The comment referring to 'one zone' relates to the dividing Christchurch, after the earthquakes, into zones labelled with different colours that indicates whether buildings have to be removed, or can be repaired or whether a decision has yet to be made or they are ok. Quantity: 1 digital cartoon(s).
This report provides an initial overview and gap analysis of the multi-hazards interactions that might affect fluvial and pluvial flooding (FPF) hazard in the Ōpāwaho Heathcote catchment. As per the terms of reference, this report focuses on a one-way analysis of the potential effects of multi-hazards on FPF hazard, as opposed to a more complex multi-way analysis of interactions between all hazards. We examined the relationship between FPF hazard and hazards associated with the phenomena of tsunamis; coastal erosion; coastal inundation; groundwater; earthquakes; and mass movements. Tsunamis: Modelling research indicates the worst-case tsunami scenarios potentially affecting the Ōpāwaho Heathcote catchment are far field. Under low probability, high impact tsunami scenarios waves could travel into Pegasus Bay and the Avon-Heathcote Estuary Ihutai, reaching the mouth and lower reaches of the Heathcote catchment and river, potentially inundating and eroding shorelines in sub-catchments 1 to 5, and temporarily blocking fluvial drainage more extensively. Any flooding infrastructure or management actions implemented in the area of tsunami inundation would ideally be resilient to tsunami-induced inundation and erosion. Model results currently available are a first estimate of potential tsunami inundation under contemporary sea and land level conditions. In terms of future large tsunami events, these models likely underestimate effects in riverside sub-catchments, as well as effects under future sea level, shoreline and other conditions. Also of significance when considering different FPF management structures, it is important to be mindful that certain types of flood structures can ‘trap’ inundating water coming from ocean directions, leading to longer flood durations and salinization issues. Coastal erosion: Model predictions indicate that sub-catchments 1 to 3 could potentially be affected by coastal erosion by the timescale of 2065, with sub-catchments 1-6 predicted to be potentially affected by coastal erosion by the time scale of 2115. In addition, the predicted open coast effects of this hazard should not be ignored since any significant changes in the New Brighton Spit open coast would affect erosion rates and exposure of the landward estuary margins, including the shorelines of the Ōpāwaho Heathcote catchment. Any FPF flooding infrastructure or management activities planned for the potentially affected sub-catchments needs to recognise the possibility of coastal erosion, and to have a planned response to the predicted potential shoreline translation. Coastal inundation: Model predictions indicate coastal inundation hazards could potentially affect sub-catchments 1 to 8 by 2065, with a greater area and depth of inundation possible for these same sub-catchments by 2115. Low-lying areas of the Ōpāwaho Heathcote catchment and river channel that discharge into the estuary are highly vulnerable to coastal inundation since elevated ocean and estuary water levels can block the drainage of inland systems, compounding FPF hazards. Coastal inundation can overwhelm stormwater and other drainage network components, and render river dredging options ineffective at best, flood enhancing at worst. A distinction can be made between coastal inundation and coastal erosion in terms of the potential impacts on affected land and assets, including flood infrastructure, and the implications for acceptance, adaptation, mitigation, and/or modification options. That is, responding to inundation could include structural and/or building elevation solutions, since unlike erosion, inundation does not necessarily mean the loss of land. Groundwater: Groundwater levels are of significant but variable concern when examining flooding hazards and management options in the Ōpāwaho Heathcote catchment due to variability in soils, topographies, elevations and proximities to riverine and estuarine surface waterbodies. Much of the Canterbury Plains part of the Ōpāwaho Heathcote catchment has a water table that is at a median depth of <1m from the surface (with actual depth below surface varying seasonally, inter-annually and during extreme meteorological events), though the water table depth rapidly shifts to >6m below the surface in the upper Plains part of the catchment (sub-catchments 13 to 15). Parts of Waltham/Linwood (sub-catchments 5 & 6) and Spreydon (sub-catchment 10) have extensive areas with a particularly high water table, as do sub-catchments 18, 19 and 20 south of the river. In all of the sub-catchments where groundwater depth below surface is shallow, it is necessary to be mindful of cascading effects on liquefaction hazard during earthquake events, including earthquake-induced drainage network and stormwater infrastructure damage. In turn, subsidence induced by liquefaction and other earthquake processes during the CES directly affected groundwater depth below surface across large parts of the central Ōpāwaho Heathcote catchment. The estuary margin of the catchment also faces increasing future challenges with sea level rise, which has the potential to elevate groundwater levels in these areas, compounding existing liquefaction and other earthquake associated multi-hazards. Any increases in subsurface runoff due to drainage system, development or climate changes are also of concern for the loess covered hill slopes due to the potential to enhance mass movement hazards. Earthquakes: Earthquake associated vertical ground displacement and liquefaction have historically affected, or are in future predicted to affect, all Ōpāwaho Heathcote sub-catchments. During the CES, these phenomena induced a significant cascades of changes in the city’s drainage systems, including: extensive vertical displacement and liquefaction induced damage to stormwater ‘greyware’, reducing functionality of the stormwater system; damage to the wastewater system which temporarily lowered groundwater levels and increased stormwater drainage via the wastewater network on the one hand, creating a pollution multi-hazard for FPF on the other hand; liquefaction and vertical displacement induced river channel changes affected drainage capacities; subsidence induced losses in soakage and infiltration capacities; changes occurred in topographic drainage conductivity; estuary subsidence (mainly around the Ōtākaro Avon rivermouth) increased both FPF and coastal inundation hazards; estuary bed uplift (severe around the Ōpāwaho Heathcote margins), reduced tidal prisms and increased bed friction, producing an overall reduction the waterbody’s capacity to efficiently flush catchment floodwaters to sea; and changes in estuarine and riverine ecosystems. All such possible effects need to be considered when evaluating present and future capacities of the Ōpāwaho Heathcote catchment FPF management systems. These phenomena are particularly of concern in the Ōpāwaho Heathcote catchment since stormwater networks must deal with constraints imposed by stream and river channels (past and present), estuarine shorelines and complex hill topography. Mass movements: Mass movements are primarily a risk in the Port Hills areas of the Ōpāwaho Heathcote catchment (sub-catchments 1, 2, 7, 9, 11, 16, 21), though there are one or two small but susceptible areas on the banks of the Ōpāwaho Heathcote River. Mass movements in the form of rockfalls and debris flows occurred on the Port Hills during the CES, resulting in building damage, fatalities and evacuations. Evidence has also been found of earthquake-triggered tunnel gully collapsesin all Port Hill Valleys. Follow-on effects of these mass movements are likely to occur in major future FPF and other hazard events. Of note, elevated groundwater levels, coastal inundation, earthquakes (including liquefaction and other effects), and mass movement exhibit the most extensive levels of multi-hazard interaction with FPF hazard. Further, all of the analysed multi-hazard interactions except earthquakes were found to consistently produce increases in the FPF hazard. The implications of these analyses are that multihazard interactions generally enhance the FPF hazard in the Ōpāwaho Heathcote catchment. Hence, management plans which exclude adjustments for multi-hazard interactions are likely to underestimate the FPF hazard in numerous different ways. In conclusion, although only a one-way analysis of the potential effects of selected multi-hazards on FPF hazard, this review highlights that the Ōpāwaho Heathcote catchment is an inherently multi- hazard prone environment. The implications of the interactions and process linkages revealed in this report are that several significant multi-hazard influences and process interactions must be taken into account in order to design a resilient FPF hazard management strategy.
In the top two frames a man discovers a pile of stinking bones and scratches his head in puzzlement; he is pleased when a second man rushes towards him with another bone which, in the lower frame, he proceeds to try to fit together with a bone from the original stack. The second man then realizes that the dinosaur from which he took the bone is starting to shudder and quake. Context - This is a metaphor about the rebuilding the city of Christchurch after the earthquake of 22 February 2011. Debates are beginning about the preserving or knocking down of historic buildings as well as the rebuilding or repairing of houses. Colour and black and white versions available Quantity: 2 digital cartoon(s).
The city of Christchurch, New Zealand, was until very recently a “Junior England”—a small city that still bore the strong imprint of nineteenth-century British colonization, alongside a growing interest in the underlying biophysical setting and the indigenous pre-European landscape. All of this has changed as the city has been subjected to a devastating series of earthquakes, beginning in September 2010, and still continuing, with over 12,000 aftershocks recorded. One of these aftershocks, on February 22, 2011, was very close to the city center and very shallow with disastrous consequences, including a death toll of 185. Many buildings collapsed, and many more need to be demolished for safety purposes, meaning that over 80 percent of the central city will have gone. Tied up with this is the city’s precious heritage—its buildings and parks, rivers, and trees. The threats to heritage throw debates over economics and emotion into sharp relief. A number of nostalgic positions emerge from the dust and rubble, and in one form is a reverse-amnesia—an insistence of the past in the present. Individuals can respond to nostalgia in very different ways, at one extreme become mired in it and unable to move on, and at the other, dismissive of nostalgia as a luxury in the face of more pressing crises. The range of positions on nostalgia represent the complexity of heritage debates, attachment, and identity—and the ways in which disasters amplify the ongoing discourse on approaches to conservation and the value of historic landscapes.
Text at top left reads 'Christchurch display portaloos' Four different styles of portaloo are shown; the "Merivale", the 'Sumner", the "Heritage" and the "Eastsider"; someone inside the 'Eastsider says 'At least I'm open plan AND mobile!' Context - After the tow Christchurch earthquakes and hundreds of aftershocks that have hit Christchurch one of the problems is lack of toilets because of damage to buildings and also damage to sewage systems so many portaloos and chemical toilets have been sent to Christchurch. However many people have resorted to the good old kiwi way and dug long-drops in the backyard. A website 'showusyourlongdrop.co.nz' has been developed by Christchurch man Jason Moore, who was inspired by photographs of Christchurch dunnies uploaded to Facebook. There has been a competition. Quantity: 1 digital cartoon(s).
Under the caption 'Best value for money?' is a football stadium displaying a red cross. From within a voice proclaims the advantages of having a combined covered stadium, hospital and blood bank. Under CERA, the Christchurch Central Development Unit had planned for a covered sports stadium, with attached facilities and shops as one of the key sites in the Christchurch rebuild after the 2010 and 2011 earthquakes. The 'blood bin' refers to the recent practice in rugby of sending off players with flesh wounds. There were also plans for a new hospital. Quantity: 1 digital cartoon(s).
Land cover change information in urban areas supports decision makers in dealing with public policy planning and resource management. Remote sensing has been demonstrated as an efficient and accurate way to monitor land cover change over large extents. The Canterbury Earthquake Sequence (CES) caused massive damage in Christchurch, New Zealand and resulted in significant land cover change over a short time period. This study combined two types of remote sensing data, aerial imagery (RGB) and LiDAR, as the basis for quantifying land cover change in Christchurch between 2011 – 2015, a period corresponding to the five years immediately following the 22 February 2011 earthquake, which was part of the CES. An object based image analysis (OBIA) approach was adopted to classify the aerial imagery and LiDAR data into seven land cover types (bare land, building, grass, shadow, tree and water). The OBIA approach consisted of two steps, image segmentation and object classification. For the first step, this study used multi-level segmentation to better segment objects. For the second step, the random forest (RF) classifier was used to assign a land cover type to each object defined by the segmentation. Overall classification accuracies for 2011 and 2015 were 94.0% and 94.32%, respectively. Based on the classification result, land cover changes between 2011 and 2015 were then analysed. Significant increases were found in road and tree cover, while the land cover types that decreased were bare land, grass, roof, water. To better understand the reasons for those changes, land cover transitions were calculated. Canopy growth, seasonal differences and forest plantation establishment were the main reasons for tree cover increase. Redevelopment after the earthquake was the main reason for road area growth. By comparing the spatial distribution of these transitions, this study also identified Halswell and Wigram as the fastest developing suburbs in Christchurch. These results provided quantitative information for the effects of CES, with respect to land cover change. They allow for a better understanding for the current land cover status of Christchurch. Among those land cover changes, the significant increase in tree cover aroused particularly interest as urban forests benefit citizens via ecosystem services, including health, social, economic, and environmental benefits. Therefore, this study firstly calculated the percentages of tree cover in Christchurch’s fifteen wards in order to provide a general idea of tree cover change in the city extent. Following this, an automatic individual tree detection and crown delineation (ITCD) was undertaken to determine the feasibility of automated tree counting. The accuracies of the proposed approach ranged between 56.47% and 92.11% in thirty different sample plots, with an overall accuracy of 75.60%. Such varied accuracies were later found to be caused by the fixed tree detection window size and misclassifications from the land cover classification that affected the boundary of the CHM. Due to the large variability in accuracy, tree counting was not undertaken city-wide for both time periods. However, directions for further study for ITCD in Christchurch could be exploring ITCD approaches with variable window size or optimizing the classification approach to focus more on producing highly accurate CHMs.
Questions to Ministers 1. Hon RODNEY HIDE to the Acting Minister of Energy and Resources: Does she accept her Ministry's advice that the value of New Zealand's onshore minerals excluding hydrocarbons is $194 billion overall with $80 billion estimated in Schedule 4 land; if so, what plans does the Government have to allow their development? 2. Hon PHIL GOFF to the Minister for the Rugby World Cup: What advice has the Prime Minister, the Government or Rugby New Zealand 2011 been given on Christchurch's ability to host Rugby World Cup matches later this year? 3. CHESTER BORROWS to the Minister of Finance: What reports has he received on the economy's prospects after New Zealand meets the immediate challenges of the Christchurch earthquake? 4. Hon DAVID CUNLIFFE to the Minister for Communications and Information Technology: Would he indicate his agreement to a further extension, if it were required, to the report back date for the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill? 5. TE URUROA FLAVELL to the Minister of Agriculture: Is he concerned to learn that New Zealand's first majority Māori-owned dairy company, Miraka, has reportedly stated that there is a serious risk that Fonterra's proposed Trading Among Farmers exchange will be illiquid, volatile and unstable; if so, what assurances can he give Miraka and other dairy processors and industry groups, that anti-competitive behaviour will not be tolerated? 6. Hon DAVID PARKER to the Acting Minister for Economic Development: Has he been advised by the Prime Minister whether his appointment as Acting Minister for Economic Development is temporary or expected to carry on to the election? 7. JO GOODHEW to the Minister of Education: What progress has been made on re-opening Christchurch schools and early childhood education centres since the 22 February earthquake? 8. GRANT ROBERTSON to the Minister of Health: Does he favour the sale of any public hospitals in New Zealand; if so, which one or ones? 9. SIMON BRIDGES to the Minister for Building and Construction: What advice has he received from the Department of Building and Housing regarding last month's Christchurch earthquake? 10. DARIEN FENTON to the Minister of Labour: What factors did she consider in deciding to increase the minimum wage by 25 cents from 1 April in her latest review? 11. CHRIS TREMAIN to the Minister of Transport: What progress has been made on roading projects in the Hawke's Bay region? 12. GARETH HUGHES to the Minister of Finance: What steps, if any, is he taking to reduce New Zealand's economic vulnerability that stems from dependence on oil? Questions to Members 1. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submissions have been received so far on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill? 2. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: How many submitters on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill have requested an oral hearing? 3. Hon DAVID CUNLIFFE to the Chairperson of the Finance and Expenditure Committee: Is he aware of any complaints about times allocated to submitters on the Telecommunications (TSO, Broadband and Other Matters) Amendment Bill?
Two men chat over the fence about the state of their houses after the 4th September earthquake in Christchurch. One of them is complaining about the slow pace of reconstruction of houses after the magnitude 7.1 earthquake on 4 September 2010; the second man thinks they are doing their best. Context - Frustration over the slow rate of processing insurance applications and building inspections after the magnitude 7.1 earthquake on 4 September 2010 which although it resulted in a lot of damage, no-one died. In the cartoon the man's red sticker (meaning the house is uninhabitable) has faded to green after being put on the house after the September earthquake. Three days after this cartoon was published the much more disastrous earthquake of the 22nd February struck and many people died. Quantity: 1 digital cartoon(s).
Floor systems with precast concrete hollow-core units have been largely used in concrete buildings built in New Zealand during the 1980’s. Recent earthquakes, such as the Canterbury sequence in 2010-2011 and the Kaikoura earthquake in 2016, highlighted that this floor system can be highly vulnerable and potentially lead to the floor collapse. A series of research activities are in progress to better understand the seismic performance of floor diaphragms, and this research focuses on examining the performance of hollow core units running parallel to the walls of wall-resisting concrete structures. This study first focused on the development of fragility functions, which can be quickly used to assess likelihood of the hollow-core being able to survive given the buildings design drift, and secondly to determine the expected performance of hollow-core units that run parallel to walls, focusing on the alpha unit running by the wall. Fragility functions are created for a range of different parameters for both vertical dislocation and crack width that can be used as the basis of a quick analysis or loss estimation for the likely impact of hollow-core floors on building vulnerability and risk. This was done using past experimental tests, and the recorded damage. Using these results and the method developed by Baker fragility curves were able to be created for varying crack widths and vertical dislocations. Current guidelines for analysis of hollow-core unit incompatible displacements are based on experimental vertical displacement results from concrete moment resisting frame systems to determine the capacity of hollow-core elements. To investigate the demands on hollow-core units in a wall-based structure, a fibre-element model in the software Seismostruct is created and subject to quasi-static cyclic loading, using elements which are verified from previous experimental tests. It is shown that for hollow-core units running by walls that the 10 mm displacement capacity used for hollow-core units running by a beam is insufficient for members running by walls and that shear analysis should be used. The fibre-element model is used to simulate the seismic demand induced on the floor system and has shown that the shear demand is a function of drift, wall length, hollow-core span, linking slab length and, to a minor extent, wall elongation.