Search

found 295 results

Research papers, University of Canterbury Library

This paper outlines the deconstruction, redesign and reconstruction of a 2 storey timber building at the University of Canterbury, in Christchurch, New Zealand. The building consists of post tensioned timber frames and walls for lateral and gravity resistance, and timber concrete composite flooring. Originally a test specimen, the structure was subjected to extreme lateral displacements in the University structural testing laboratory. This large scale test of the structural form showed that post tensioned timber can withstand high levels of drift with little to no structural damage in addition to displaying full recentering characteristics with no residual displacements, a significant contributor to post earthquake cost. The building subsequently has been dismantled and reconstructed as offices for the Structural Timber Innovation Company (STIC). In doing this over 90% of the materials have been recycled which further enhances the sustainability of this construction system. The paper outlines the necessary steps to convert the structure from a test specimen into a functioning office building with minimal wastage and sufficient seismic resistance. The feasibility of recycling the structural system is examined using the key indicators of cost and time.

Research papers, University of Canterbury Library

On 22 February 2011, Canterbury and its largest city Christchurch experienced its second major earthquake within six months. The region is facing major economic and organisational challenges in the aftermath of these events. Approximately 25% of all buildings in the Christchurch CBD have been “red tagged” or deemed unsafe to enter. The New Zealand Treasury estimates that the combined cost of the February earthquake and the September earthquake is approximately NZ$15 billion[2]. This paper examines the national and regional economic climate prior to the event, discusses the immediate economic implications of this event, and the challenges and opportunities faced by organisations affected by this event. In order to facilitate recovery of the Christchurch area, organisations must adjust to a new norm; finding ways not only to continue functioning, but to grow in the months and years following these earthquakes. Some organisations relocated within days to areas that have been less affected by the earthquakes. Others are taking advantage of government subsidised aid packages to help retain their employees until they can make long-term decisions about the future of their organisation. This paper is framed as a “report from the field” in order to provide insight into the early recovery scenario as it applies to organisations affected by the February 2011 earthquake. It is intended both to inform and facilitate discussion about how organisations can and should pursue recovery in Canterbury, and how organisations can become more resilient in the face of the next crisis.

Research papers, University of Canterbury Library

The timeliness and quality of recovery activities are impacted by the organisation and human resourcing of the physical works. This research addresses the suitability of different resourcing strategies on post-disaster demolition and debris management programmes. This qualitative analysis primarily draws on five international case studies including 2010 Canterbury earthquake, 2009 L’Aquila earthquake, 2009 Samoan Tsunami, 2009 Victorian Bushfires and 2005 Hurricane Katrina. The implementation strategies are divided into two categories: collectively and individually facilitated works. The impacts of the implementation strategies chosen are assessed for all disaster waste management activities including demolition, waste collection, transportation, treatment and waste disposal. The impacts assessed include: timeliness, completeness of projects; and environmental, economic and social impacts. Generally, the case studies demonstrate that detritus waste removal and debris from major repair work is managed at an individual property level. Debris collection, demolition and disposal are generally and most effectively carried out as a collective activity. However, implementation strategies are affected by contextual factors (such as funding and legal constraints) and the nature of the disaster waste (degree of hazardous waste, geographical spread of waste etc.) and need to be designed accordingly. Community involvement in recovery activities such as demolition and debris removal is shown to contribute positively to psychosocial recovery.

Research papers, University of Canterbury Library

The NMIT Arts & Media Building is the first in a new generation of multistorey timber structures. It employs an advanced damage avoidance earthquake design that is a world first for a timber building. Aurecon structural engineers are the first to use this revolutionary Pres-Lam technology developed at the University of Canterbury. This technology marks a fundamental change in design philosophy. Conventional seismic design of multi-storey structures typically depends on member ductility and the acceptance of a certain amount of damage to beams, columns and walls. The NMIT seismic system relies on pairs of coupled LVL shear walls that incorporate high strength steel tendons post-tensioned through a central duct. The walls are centrally fixed allowing them to rock during a seismic event. A series of U-shaped steel plates placed between the walls form a coupling mechanism, and act as dissipators to absorb seismic energy. The design allows the primary structure to remain essentially undamaged while readily replaceable connections act as plastic fuses. In this era where sustainability is becoming a key focus, the extensive use of timber and engineered-wood products such as LVL make use of a natural resource all grown and manufactured within a 100km radius of Nelson. This project demonstrates that there are now cost effective, sustainable and innovative solutions for multi-story timber buildings with potential applications for building owners in seismic areas around the world.

Images, UC QuakeStudies

A photograph of Celia Wade-Brown, Mayor of Wellington, speaking at a graduation ceremony for more than 40 new civil defence volunteers in the Wellington Town Hall. Members of the Wellington Emergency Management Office team were presented certificates of appreciation during this event. The certificates were presented to the members to honour their involvement in the emergency response to the 22 February 2011 earthquakes in Christchurch.

Images, UC QuakeStudies

A photograph of Fred Mecoy, the Wellington City Council's Emergency Preparedness Manager, speaking at a graduation ceremony for more than 40 new civil defence volunteers in the Wellington Town Hall. Members of the Wellington Emergency Management Office team were presented certificates of appreciation during this event. The certificates were presented to the members to honour their involvement in the emergency response to the 22 February 2011 earthquakes in Christchurch.

Research papers, University of Canterbury Library

Timber has experienced renewed interests as a sustainable building material in recent times. Although traditionally it has been the prime choice for residential construction in New Zealand and some other parts of the world, its use can be increased significantly in the future through a wider range of applications, particularly when adopting engineered wood material, Research has been started on the development of innovative solutions for multi-storey non-residential timber buildings in recent years and this study is part of that initiative. Application of timber in commercial and office spaces posed some challenges with requirements of large column-free spaces. The current construction practice with timber is not properly suited for structures with the aforementioned required characteristics and new type of structures has to be developed for this type of applications. Any new structural system has to have adequate capacity for carry the gravity and lateral loads due to occupancy and the environmental effects. Along with wind loading, one of the major sources of lateral loads is earthquakes. New Zealand, being located in a seismically active region, has significant risk of earthquake hazard specially in the central region of the country and any structure has be designed for the seismic loading appropriate for the locality. There have been some significant developments in precast concrete in terms of solutions for earthquake resistant structures in the last decade. The “Hybrid” concept combining post-tensioning and energy dissipating elements with structural members has been introduced in the late 1990s by the precast concrete industry to achieve moment-resistant connections based on dry jointed ductile connections. Recent research at the University of Canterbury has shown that the concept can be adopted for timber for similar applications. Hybrid timber frames using post-tensioned beams and dissipaters have the potential to allow longer spans and smaller cross sections than other forms of solid timber frames. Buildings with post-tensioned frames and walls can have larger column-free spaces which is a particular advantage for non-residential applications. While other researchers are focusing on whole structural systems, this research concentrated on the analysis and design of individual members and connections between members or between member and foundation. This thesis extends existing knowledge on the seismic behaviour and response of post-tensioned single walls, columns under uni-direction loads and small scale beam-column joint connections into the response and design of post-tensioned coupled walls, columns under bi-directional loading and full-scale beam-column joints, as well as to generate further insight into practical applications of the design concept for subassemblies. Extensive experimental investigation of walls, column and beam-column joints provided valuable confirmation of the satisfactory performance of these systems. In general, they all exhibited almost complete re-centering capacity and significant energy dissipation, without resulting into structural damage. The different configurations tested also demonstrated the flexibility in design and possibilities for applications in practical structures. Based on the experimental results, numerical models were developed and refined from previous literature in precast concrete jointed ductile connections to predict the behaviour of post-tensioned timber subassemblies. The calibrated models also suggest the values of relevant parameters for applications in further analysis and design. Section analyses involving those parameters are performed to develop procedures to calculate moment capacities of the subassemblies. The typical features and geometric configurations the different types of subassemblies are similar with the only major difference in the connection interfaces. With adoption of appropriate values representing the corresponding connection interface and incorporation of the details of geometry and configurations, moment capacities of all the subassemblies can be calculated with the same scheme. That is found to be true for both post-tensioned-only and hybrid specimens and also applied for both uni-directional and bi-directional loading. The common section analysis and moment capacity calculation procedure is applied in the general design approach for subassemblies.

Research papers, University of Canterbury Library

An extensive research program is on-going at the University of Canterbury, New Zealand to develop new technologies to permit the construction of multi-storey timber buildings in earthquake prone areas. The system combines engineered timber beams, columns and walls with ductile moment resisting connections using post-tensioned tendons and eventually energy dissipaters. The extensive experimental testing on post-tensioned timber building systems has proved a remarkable lateral response of the proposed solutions. A wide number of post-tensioned timber subassemblies, including beam-column connections, single or coupled walls and column-foundation connections, have been analysed in static or quasi-static tests. This contribution presents the results of the first dynamic tests carried out with a shake-table. Model frame buildings (3-storey and 5-storey) on one-quarter scale were tested on the shake-table to quantify the response of post-tensioned timber frames during real-time earthquake loading. Equivalent viscous damping values were computed for post-tensioned timber frames in order to properly predict their response using numerical models. The dynamic tests were then complemented with quasi-static push and pull tests performed to a 3-storey post-tensioned timber frame. Numerical models were included to compare empirical estimations versus dynamic and quasi-static experimental results. Different techniques to model the dynamic behaviour of post-tensioned timber frames were explored. A sensitivity analysis of alternative damping models and an examination of the influence of designer choices for the post-tensioning force and utilization of column armouring were made. The design procedure for post-tensioned timber frames was summarized and it was applied to two examples. Inter-storey drift, base shear and overturning moments were compared between numerical modelling and predicted/targeted design values.

Research papers, University of Canterbury Library

This manuscript provides a critical examination of the ground motions recorded in the near-source region resulting from the 22 February 2011 Christchurch earthquake. Particular attention is given to reconciling the observed spatial distribution of ground motions in terms of physical phenomena related to source, path and site effects. The large number of near-source observed strong ground motions show clear evidence of: forward-directivity, basin generated surface waves, liquefaction and other significant nonlinear site response. The pseudo-acceleration response spectra (SA) amplitudes and significant duration of strong motions agree well with empirical prediction models, except at long vibration periods where the influence of basin-generated surface waves and nonlinear site response are significant and not adequately accounted for in empirical SA models. Pseudo-acceleration response spectra are also compared with those observed in the 4 September 2010 Darfield earthquake and routine design response spectra used in order to emphasise the amplitude of ground shaking and elucidate the importance of local geotechnical characteristics on surface ground motions. The characteristics of the observed vertical component accelerations are shown to be strongly dependent on source-to-site distance and are comparable with those from the 4 September 2010 Darfield earthquake, implying the large amplitudes observed are simply a result of many observations at close distances rather than a peculiar source effect.

Research papers, University of Canterbury Library

Extended Direct Analysis (EDA), developed at the University of Canterbury, is an advance on the AISC Direct Analysis method for the analysis of frames subjected to static forces. EDA provides a faster, simple and more rational way to properly consider the second-order effects, initial residual stresses (IRS) and the initial imperfections or steel structures under one directional loading than conventional analysis methods. This research applied the EDA method to quantify the effect of member overstrength on frame behaviour for a single storey frame. Also, the effects of IRS, which were included in the EDA static analysis, but which are not considered explicitly in non-linear seismic analysis, were evaluated in two ways. Firstly, they were considered for simple structures subject to increasing cyclic displacement in different directions. Secondly, incremental dynamic analysis with realistic ground motion was used to quantify the likely effect of IRS in earthquakes. It was found that, contrary to traditional wisdom and practice, greater member strengths can result in lower frame strengths for frames under monotonic lateral loading. The structural lateral capacity of the overstrength case was reduced by 6% compared to the case using the dependable member strengths. Also, it resulted significantly different in member demands. Therefore, it is recommended that when either plastic analysis or EDA is used, that both upper and lower bounds on the likely member strength should be considered to determine the total frame strength and the member demands. Results of push-pull analysis under displacement control showed that for IRS ratio, gamma < 0.5 and axial compressive force ratio, N*/Ns, up to 0.5, IRS did affect the structural behaviour in the first half cycle. However, the behavior in the later cycles was not significantly affected. It also showed that the effect of initial residual stresses in the frame was less significant than for the column alone when the column was subjected to similar axial compressive force. The incremental dynamic analysis results from both cantilever column and the three-storey steel frame showed that by increasing gamma = 0 to 0.5, the effect of IRS on seismic responses, based on the 50% confidence level, was less than 3% for N*/Ns, up to 0.5.

Research papers, University of Canterbury Library

A magnitude 6.3 earthquake struck the city of Christchurch at 12:51pm on Tuesday 22 February 2011. The earthquake caused 182 fatalities, a large number of injuries, and resulted in widespread damage to the built environment, including significant disruption to the lifelines. The event created the largest lifeline disruption in a New Zealand city in 80 years, with much of the damage resulting from extensive and severe liquefaction in the Christchurch urban area. The Christchurch earthquake occurred when the Canterbury region and its lifelines systems were at the early stage of recovering from the 4 September 2010 Darfield (Canterbury) magnitude 7.1 earthquake. This paper describes the impact of the Christchurch earthquake on lifelines by briefly summarising the physical damage to the networks, the system performance and the operational response during the emergency management and the recovery phase. Special focus is given to the performance and management of the gas, electric and road networks and to the liquefaction ejecta clean-up operations that contributed to the rapid reinstatement of the functionality of many of the lifelines. The water and wastewater system performances are also summarized. Elements of resilience that contributed to good network performance or to efficient emergency and recovery management are highlighted in the paper.

Audio, Radio New Zealand

Our programme this morning is completely devoted to the aftermath of yesterday's Christchurch earthquake. Civil Defence says rescue teams in Christchurch are still recovering people alive who have been trapped in buildings in the city overnight. The emergency department at Christchurch Hospital is extremely busy with many seriously injured people. After an emergency cabinet meeting yesterday, the Prime Minister flew to Christchurch to view the aftermath of the quake first hand. Numerous stories, some of survival, others more tragic are emerging in the aftermath of the quake.

Research papers, University of Canterbury Library

Currently there is a worldwide renaissance in timber building design. At the University of Canterbury, new structural systems for commercial multistorey timber buildings have been under development since 2005. These systems incorporate large timber sections connected by high strength post-tensioning tendons, and timber-concrete composite floor systems, and aim to compete with existing structural systems in terms of cost, constructability, operational and seismic performance. The development of post-tensioned timber systems has created a need for improved lateral force design approaches for timber buildings. Current code provisions for seismic design are based on the strength of the structure, and do not adequately account for its deformation. Because timber buildings are often governed by deflection, rather than strength, this can lead to the exceedence of design displacement limitations imposed by New Zealand codes. Therefore, accurate modeling approaches which define both the strength and deformation of post-tensioned timber buildings are required. Furthermore, experimental testing is required to verify the accuracy of these models. This thesis focuses on the development and experimental verification of modeling approaches for the lateral force design of post-tensioned timber frame and wall buildings. The experimentation consisted of uni-direcitonal and bi-directional quasi-static earthquake simulation on a two-thirds scale, two-storey post-tensioned timber frame and wall building with timber-concrete composite floors. The building was subjected to lateral drifts of up to 3% and demonstrated excellent seismic performance, exhibiting little damage. The building was instrumented and analyzed, providing data for the calibration of analytical and numerical models. Analytical and numerical models were developed for frame, wall and floor systems that account for significant deformation components. The models predicted the strength of the structural systems for a given design performance level. The static responses predicted by the models were compared with both experimental data and finite element models to evaluate their accuracy. The frame, wall and floor models were then incorporated into an existing lateral force design procedure known as displacement-based design and used to design several frame and wall structural systems. Predictions of key engineering demand parameters, such as displacement, drift, interstorey shear, interstorey moment and floor accelerations, were compared with the results of dynamic time-history analysis. It was concluded that the numerical and analytical models, presented in this thesis, are a sound basis for determining the lateral response of post-tensioned timber buildings. However, future research is required to further verify and improve these prediction models.

Research papers, University of Canterbury Library

Blended learning plays an important role in many tertiary institutions but little has been written about the implementation of blended learning in times of adversity, natural disaster or crisis. This paper describes how, in the wake of the 22 February Canterbury earthquake, five teacher educators responded to crisis-driven changing demands and changing directions. Our narratives describe how blended learning provided students in initial teacher education programmes with some certainty and continuity during a time of civil emergency. The professional learning generated from our experiences provides valuable insights for designing and preparing for blended learning in times of crisis, as well as developing resilient blended learning programmes for the future.

Images, Alexander Turnbull Library

Text above reads 'Prince William comes to Christchurch...' A special royal portaloo has been arranged for the visit of Prince William to Christchurch; it is built to resemble a castle and has gold door fittings. On either side of the portaloo stands a sentry guard. The prince who is inside whispers 'I can't find the royal flush button' (wordplay on 'royal flush' and the 'flush' of a toilet) Context - Prince William visited the Civil Defence headquarters in Christchurch with Earthquake Recovery Minister Gerry Brownlee and Christchurch Mayor Bob Parker on the 17th March to see the damage caused by the earthquakes of the 4th September 2010 and the 22 February 2011. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

Surface rupture of the previously unrecognised Greendale Fault extended west-east for ~30 km across alluvial plains west of Christchurch, New Zealand, during the Mw 7.1 Darfield (Canterbury) earthquake of September 2010. Surface rupture displacement was predominantly dextral strike-slip, averaging ~2.5 m, with maxima of ~5 m. Vertical displacement was generally less than 0.75 m. The surface rupture deformation zone ranged in width from ~30 to 300 m, and comprised discrete shears, localised bulges and, primarily, horizontal dextral flexure. About a dozen buildings, mainly single-storey houses and farm sheds, were affected by surface rupture, but none collapsed, largely because most of the buildings were relatively flexible and resilient timber-framed structures and also because deformation was distributed over a relatively wide zone. There were, however, notable differences in the respective performances of the buildings. Houses with only lightly-reinforced concrete slab foundations suffered moderate to severe structural and non-structural damage. Three other buildings performed more favourably: one had a robust concrete slab foundation, another had a shallow-seated pile foundation that isolated ground deformation from the superstructure, and the third had a structural system that enabled the house to tilt and rotate as a rigid body. Roads, power lines, underground pipes, and fences were also deformed by surface fault rupture and suffered damage commensurate with the type of feature, its orientation to the fault, and the amount, sense and width of surface rupture deformation.

Images, Alexander Turnbull Library

In the foreground PM John Key drives a bulldozer over Christchurch; in the background two engineers read a newspaper report that says 'P.M. gives false demolition number, PM gives false World Cup hope' and one of them says 'Now I know why those things are called BULLdozers..' Context - Prime Minister John Key is sticking to a government estimate that 10,000 Christchurch homes will need to be razed despite criticism that he should wait for official figures; he also stated that 100,000 homes may need repairs, despite Civil Defence saying it has only checked 70,000 homes so far. John Key was also insisting that there was a chance of keeping World Cup rugby games in Christchurch but an official announcement on 16 March dashed those hopes. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

Questions to Ministers 1. JACQUI DEAN to the Minister of Finance: What reports has he received on the economy? 2. Hon PHIL GOFF to the Prime Minister: Will he rule out making cuts to Working for Families payments this year; if not, why not? 3. TIM MACINDOE to the Minister for Social Development and Employment: What changes is the Government making to Family Start to ensure a greater focus on protecting children from abuse and neglect? 4. Hon ANNETTE KING to the Minister for Social Development and Employment: Does she agree with the Prime Minister that "anyone on a benefit actually has a lifestyle choice…some make poor choices, and they do not have money left"? 5. KANWALJIT SINGH BAKSHI to the Minister of Civil Defence: Did he meet with business leaders in Christchurch yesterday to discuss the Civil Defence state of national emergency operations; if so, what was the outcome of that meeting? 6. Hon DAVID CUNLIFFE to the Minister of Finance: Who was right, the Prime Minster who predicted that the New Zealand economy would grow "reasonably aggressively" in 2010-11, or the last four quarterly NZIER consensus forecast updates for GDP, which have progressively declined from 3.2 percent to just 0.8 percent for the year to March 2011? 7. Dr RUSSEL NORMAN to the Minister of Finance: Which response to the Christchurch earthquake carries a greater risk of a credit downgrade: increased government borrowing or a temporary earthquake levy? 8. PHIL TWYFORD to the Minister of Local Government: When he said "Auckland's fragmented governance has meant a lack [of] leadership and vision, but soon its leaders will be able to think regionally, plan strategically and act decisively", did he mean only if they agree with the Government's plan for Auckland? 9. JO GOODHEW to the Minister of Education: What were the results of the Accelerating Learning in Mathematics Pilot Study? 10. Hon DAMIEN O'CONNOR to the Minister for Biosecurity: Does he agree with the statements made by John Lancashire and Stew Wadey, President of Waikato Federated Farmers, in the Dominion Post yesterday that New Zealand is exposed to greater risk of incursions or exotic pests at our borders as a result of the "fast-tracking of tourists", the "attempts to abolish import restrictions", and his axing of 60 frontline border staff? 11. MICHAEL WOODHOUSE to the Acting Minister of Energy and Resources: What reports has she received on levels of renewable electricity generation? 12. CHRIS HIPKINS to the Minister for ACC: Does he stand by his answer to question 4 on Thursday last week "that funding will be taken from either the earners account or the work account" and "that a higher proportion of claims than the overall average for ACC are actually in the work account"; if not, why not?

Research Papers, Lincoln University

On September the 4th 2010 and February 22nd 2011 the Canterbury region of New Zealand was shaken by two massive earthquakes. This paper is set broadly within the civil defence and emergency management literature and informed by recent work on community participation and social capital in the building of resilient cities. Work in this area indicates a need to recognise both the formal institutional response to the earthquakes as well as the substantive role communities play in their own recovery. The range of factors that facilitate or hinder community involvement also needs to be better understood. This paper interrogates the assumption that recovery agencies and officials are both willing and able to engage communities who are themselves willing and able to be engaged in accordance with recovery best practice. Case studies of three community groups – CanCERN, Greening the Rubble and Gap Filler – illustrate some of the difficulties associated with becoming a community during the disaster recovery phase. Based on my own observations and experiences, combined with data from approximately 50 in-depth interviews with Christchurch residents and representatives from community groups, the Christchurch City Council, the Earthquake Commission and so on, this paper outlines some practical strategies emerging communities may use in the early disaster recovery phase that then strengthens their ability to ‘participate’ in the recovery process.

Images, Alexander Turnbull Library

Cartoons about political and social issues in New Zealand and overseas. The cartoon has the words 'Tsunami Warning cancelled' in the centre. Above are the words 'The end is nigh... insurance running out! No more cover!' Below the word 'cancelled' are the words 'We have reinsurance!' Context - Civil Defence has cancelled a tsunami warning after a 7.8 magnitude earthquake struck off the Kermadec Islands this morning (7 July 2011) The tsunami image is used to illustrate the problems that could arise from lack of insurance in Christchurch. When their policies run out on 30 June Earthquake-hit Christchurch and Waimakariri councils are in danger of having no property insurance because as the CEO of Civic Assurance, which insures most councils, says, 'the company cannot buy reinsurance'. There was also a potential problem for home-owners when AMI Insurance, the largest insurer of homes in Christchurch, was threatening insolvency. However, AMI has announced that it has re-insurance cover for earthquakes and other natural disasters from tomorrow (1 July 2011) for the next year. The Government feared AMI Insurance's directors would wind up the company affecting a huge section of New Zealand's insurance market and derail the reconstruction of Christchurch, official documents confirm. AMI said it had doubled its cover for the year to June 2012 after three large quakes in the year to June 2011. (Stuff 30 June 2011) Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

Questions to Ministers 1. Hon ANNETTE KING to the Minister of Finance: When he said recently "where the Government does have some influence, we are working hard to keep prices low", which prices was he referring to? 2. DAVID BENNETT to the Minister of Finance: What are some of the likely impacts on the Government's finances of the Christchurch earthquake? 3. Hon DAVID PARKER to the Acting Minister for Economic Development: Does he stand by all his statements on economic development? 4. Dr JACKIE BLUE to the Minister for ACC: How many claims has ACC received since the tragic earthquake on 22 February and what steps has the Government taken to facilitate prompt compensation for those seriously injured? 5. Hon MARYAN STREET to the Minister of Civil Defence: What is the basis for according priority to entry of the red zone in the Christchurch central business district? 6. NIKKI KAYE to the Minister for Social Development and Employment: What support is the Government giving to non-government organisations in Christchurch affected by the earthquake? 7. Hon TREVOR MALLARD to the Prime Minister: What role did he or his department play in the decision to shift the Rugby World Cup quarter finals, from AMI Stadium to Eden Park? 8. JACQUI DEAN to the Minister of Corrections: What progress has been made toward the Government's commitment to encourage private sector investment in the New Zealand corrections system? 9. Hon DARREN HUGHES to the Minister for Tertiary Education: What specific policy changes has the Government made to increase the number of apprenticeships and other building-skills training programmes since the September Canterbury earthquake? 10. SUE KEDGLEY to the Minister of Commerce: Will he use his powers under Part 4 of the Commerce Act 1986 to call for an investigation into the dairy wholesale and retail milk market, following the release of the Ministry of Agriculture and Forestry's review of the domestic milk market in New Zealand; if not, why not? 11. CAROL BEAUMONT to the Minister of Women's Affairs: Does she support the retention of the stand-alone and independent Ministry of Women's Affairs? 12. JOHN HAYES to the Minister of Agriculture: What steps has the Government recently made to progress agricultural greenhouse gas research?

Audio, Radio New Zealand

1. Hon PHIL GOFF to the Prime Minister: Has the tax switch which he promised would leave no-one worse off fully compensated all New Zealanders for the rise in the cost of living over the last year; if not, which groups are worse off? 2. Dr RUSSEL NORMAN to the Minister of Finance: Does he agree that due to inflation, no new spending in the upcoming Budget is the equivalent of a cut in real terms? 3. DAVID BENNETT to the Minister of Finance: What tax changes take effect on or around 1 April? 4. Hon DAVID CUNLIFFE to the Minister of Finance: Why did he announce on 17 March 2011 that the Government would carry all the costs of earthquake reconstruction on its balance sheet with no reduction in operating spending, when the Prime Minister said just three days later that new operating spending would be reduced to zero? 5. AARON GILMORE to the Minister of Education: What progress has been made re-opening schools and early childhood education centres in Christchurch following the 22 February earthquake? 6. CHARLES CHAUVEL to the Minister of Civil Defence: To date, how many buildings have been demolished in Canterbury without notifications to the building or business owners? 7. HONE HARAWIRA to the Attorney-General: Is he satisfied that he has the support required for the Marine and Coastal Area (Takutai Moana) Bill to pass into law? 8. DARIEN FENTON to the Minister of Labour: What impact, if any, will the Christchurch earthquake have on the Government's employment law changes due to be implemented on 1 April? 9. JONATHAN YOUNG to the Minister of Corrections: What progress has been made toward the implementation of the smoking ban in New Zealand prisons? 10. CLARE CURRAN to the Minister for Communications and Information Technology: By what date will the 75 percent of urban New Zealanders receive ultra-fast broadband under his current proposal? 11. METIRIA TUREI to the Prime Minister: Does he stand by his statement that the "Government will build the effectiveness of New Zealand's public transport networks" and "will be working closely with the Auckland Council as they develop their strategic vision for the City through the Auckland Spatial Plan"? 12. TODD McCLAY to the Minister for Social Development and Employment: What counselling support is available for Cantabrians impacted by the earthquake?

Audio, Radio New Zealand

Questions to Ministers 1. Hon PHIL GOFF to the Prime Minister: Is he satisfied that actions to address the Christchurch earthquake are an adequate response; if not, what are his areas of concern? 2. AMY ADAMS to the Minister of Finance: What reports has he received on the economic impact of the earthquake in Christchurch on 22 February 2011? 3. Hon CLAYTON COSGROVE to the Minister for Canterbury Earthquake Recovery: Is he satisfied with the level of support being offered to the people of Christchurch in the wake of the earthquake on 22 February 2011? 4. NICKY WAGNER to the Minister for Social Development and Employment: What is the Government doing to support Canterbury businesses and employees through the earthquake recovery? 5. Hon ANNETTE KING to the Minister for Social Development and Employment: Is she confident that the Ministry of Social Development has responded adequately to the Christchurch earthquake? 6. METIRIA TUREI to the Minister of Finance: Has he considered raising a temporary levy on income to help fund the rebuilding of Christchurch; if so, how much could it raise? 7. AARON GILMORE to the Minister for Tertiary Education: What work has been done to help the families of tertiary students and tertiary institutions affected by the 22 February 2011 earthquake in Christchurch? 8. Hon JIM ANDERTON to the Minister for Canterbury Earthquake Recovery: Will he ensure that Christchurch homeowners and businesses are able to access insurance cover from existing policies or new cover they require since the 22 February 2011 earthquake? 9. Hon JOHN BOSCAWEN to the Attorney-General: Has he asked the Māori Party to agree to amendments to the Marine and Coastal Area (Takutai Moana) Bill that would make it explicitly clear that customary title holders would not be able to charge individuals for accessing a beach, and require any negotiated settlements to be referred back to Parliament for validation; if so, what response did he receive? 10. Hon DAVID PARKER to the Attorney-General: Does the Government intend to proceed this week with its legislation to replace the existing Foreshore and Seabed Act 2004? 11. RAHUI KATENE to the Minister for Canterbury Earthquake Recovery: Did he agree with his spokesman's response to the situation for residents in Christchurch East following the earthquake of 22 February 2011, that, "It is apparent, given the scale out there, that there just wasn't sufficient hardware out there, loos and the like", and what urgent actions have been taken to give priority to communities in the eastern suburbs? 12. COLIN KING to the Minister of Civil Defence: Why was a state of national emergency declared on 23 February 2011?

Audio, Radio New Zealand

Questions to Ministers and lt;br / and gt; and lt;br / and gt; 1. Hon ANNETTE KING to the Prime Minister: Is he satisfied that all systems set up pursuant to commitments he has given to assist residents following the Christchurch earthquake are appropriate and working? and lt;br / and gt; and lt;br / and gt; 2. DAVID BENNETT to the Minister of Finance: What do this morning's Reserve Bank economic forecasts show? and lt;br / and gt; and lt;br / and gt; 3. Hon DAVID CUNLIFFE to the Minister of Finance: By what amount has the Reserve Bank lowered the official cash rate today, and what reason has the Bank given for this action? and lt;br / and gt; and lt;br / and gt; 4. GARETH HUGHES to the Minister of Finance: What will be the impact of the recent fuel price rise on the New Zealand economy, including impacts on GDP, consumer spending and the current account? and lt;br / and gt; and lt;br / and gt; 5. Hon DAVID PARKER to the Acting Minister for Economic Development: Has he been advised by the Prime Minister whether his appointment as Acting Minister for Economic Development is temporary or expected to carry on to the election? and lt;br / and gt; and lt;br / and gt; 6. KATRINA SHANKS to the Minister of Transport: What action is the Government taking to improve Wellington's train network? and lt;br / and gt; and lt;br / and gt; 7. Hon DAMIEN O'CONNOR to the Prime Minister: Can he assure the families of those killed in the Pike River Mine disaster that Government funding will be available for the recovery of bodies, given the mine is now in receiver's hands. and lt;br / and gt; and lt;br / and gt; 8. COLIN KING to the Minister of Civil Defence: Is the Government satisfied with the provision of replacement toilets for earthquake-affected Christchurch residents? and lt;br / and gt; and lt;br / and gt; 9. CAROL BEAUMONT to the Minister of Women's Affairs: Can she outline a significant improvement for women initiated by the current Government? and lt;br / and gt; and lt;br / and gt; 10. ALLAN PEACHEY to the Minister of Education: What provisions have been made to ensure continuity of early childhood education and schooling in the Christchurch region since the 22 February earthquake? and lt;br / and gt; and lt;br / and gt; 11. Hon TREVOR MALLARD to the Minister for Communications and Information Technology: What advice did he receive on any perceived conflict of interest before he took part in the Cabinet decision that led to the deferral of the requirement for MediaWorks to pay its frequency licence to the Crown? and lt;br / and gt; and lt;br / and gt; 12. KANWALJIT SINGH BAKSHI to the Minister of Internal Affairs: What reports has he received on the progress of urban search and rescue and firefighter teams working in Christchurch following the 22 February earthquake?