A map showing the actual construction start dates.
A document which summarises each winning Bill Perry Safety Award submission.
A paper written by Paul S Botha and Eric Scheepbouwer for the Transportation Research Record: Journal of the Transportation Research Board, No. 2504, Transportation Research Board, Washington, D.C., 2015, pp. 66-72.
A pdf copy of a presentation delivered at Building a Better New Zealand (BBNZ 2014) Conference. The presentation examines the relationship between innovation and productivity improvement in the construction industry.
A pdf copy of a spreadsheet tool used by designers to undertake a whole of life evaluation of rebuild options.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A pdf copy of a PowerPoint presentation prepared for the Australia New Zealand Geotechnical Engineering Conference.
A paper prepared for the Bulletin of the New Zealand Society for Earthquake Engineering, Vol. 44, no. 4, December 2011.
A diagram which shows outputs from PDAT (with explanations).
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
An abstract which describes the content of Kristen MacAskill's full PhD thesis.
A paper describing the procedure and challenges associated with installing anchors through gabion baskets.
A diagram which shows outputs from PDAT calibration/validation (with explanations).
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A diagram which illustrates the proposed structure of an industry-wide training advisory board.
A diagram which illustrates the numbers of people trained to July 2016.
A paper prepared for the Water New Zealand 2014 conference which considers resilience lessons for reservoirs, pump stations and pipelines.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A plan which outlines how timely and accurate information relating to estimating, actual project costs, future commitments and total forecast cost will be managed and reported for each project phase in the programme. The first version of this plan was produced on 24 June 2011.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A plan which outlines the principles and methodology for the development of projects. The first version of this plan was produced on 20 September 2011.
A plan which identifies items that will define value for the programme of work and explain processes that will measure the achievement of value outcomes. The first version of this plan was produced on 6 September 2011.
An example of a public flyer promoting good driver behaviour, handed out in areas of traffic detours or delays.
A pdf copy of a presentation which describes the stages of construction of the Beachville Road seawall.
A pdf copy of a PowerPoint presentation which illustrates the locations where Duncan Gibb presented his Brunel lecture.
A report reviewing pipe installation specifications and recommending alternatives that could improve standard specifications.
A best practice traffic management guideline, produced in February 2014, which helps traffic management team members manage cyclists through road work sites safely.