Ruth Gardner's Blog 09/01/2014: Wastewater Work
Articles, UC QuakeStudies
An entry from Ruth Gardner's Blog for 09 January 2014 entitled, "Wastewater Work".
An entry from Ruth Gardner's Blog for 09 January 2014 entitled, "Wastewater Work".
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A report covering the effects of wastewater overflows upon oxygen and ammonia in the Avon and Heathcote Rivers.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A technical paper prepared for the Water NZ conference and expo 2012, which details how GIS and InfoNet were used to complement SCIRT's asset assessment process.
A document which outlines SCIRT's post-earthquake asset assessment process.
A diagram which illustrates SCIRT's asset assessment request process.
A report reviewing pipe installation specifications and recommending alternatives that could improve standard specifications.
A pdf copy of a PowerPoint presentation prepared for the Christchurch City Council and CPG New Zealand, providing an overview of the investigation work completed.
A design guideline which provides information about how to use the SCIRT Asset Assessment Spreadsheet.
A paper published in the Journal of Structural Integrity and Maintenance, 2016, Vol. 1, No. 2, 88-93, which outlines the importance of asset registers and level of service in the wake of a disaster.
A report which details the archaeological investigations carried out during the course of SCIRT project 11232, wastewater renewal work in Sorensens Place.
A report which details the archaeological investigations carried out during the course of SCIRT project 10952, wastewater renewal work on Tuam Street.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
This week on the blog we take you on a journey down the South Belt sewer, one of Christchurch’s many 19th century wastewater sewers. Located deep below the east-bound lane of Moorhouse Avenue and more than a kilometre in length, … Continue reading →
A guideline to inform designers on the design of an Automated Flushing Siphon System as a means to reduce the frequency of blockages on the wastewater network caused by pipe dips and flat grades.