
None
Construction teams are working to fix earthquake damaged stopbanks in the Waimakariri and Kaiapoi rivers near Christchurch.
Cleanup work begins in the Rutherford building.
Cleanup work begins in the Rutherford building.
Cleanup work begins in the Rutherford building.
Cleanup work begins in the Rutherford building.
Photograph captioned by Fairfax, "Ovena Murray (front) and Leonie Dehn, with Roger the dog, inspect work being done on the Charles Street pump house in Kaiapoi. Waimakariri District Council staff are deferring low-priority works to free-up funds for earthquake recovery work".
Did his work in the earthquake aftermath sway the voters?
A worker monitoring work being done in a residential area.
Students return to work in the Engineering and Physical Sciences Library.
Students return to work in the Engineering and Physical Sciences Library.
Students return to work in the Engineering and Physical Sciences Library.
Staff back at work in the Central Library after the earthquake.
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Leading hand, Iain Piper (left) and site manager Mike McKee at work on the upstairs seating area".
Photograph captioned by Fairfax, "Work to restore and earthquake-strengthen the badly damaged historic St Paul's Trinity Pacific Presbyterian Church on Cashel Street has begun after resource consents were granted by the Christchurch City Council, and a preferred contractor was selected recently. Site manager Mike McKee (left) and leading hand, Iain Piper, look over the work to be done in the towers".
Staff at work in temporary office space in the Central Library after the earthquake.
Staff at work in temporary office space in the Central Library after the earthquake.
Staff at work in temporary office space in the Central Library after the earthquake.
Staff at work in temporary office space in the Central Library after the earthquake.
Photograph captioned by Fairfax, "Community work supervisor Steve Waghorn at The Pines Oval".
A staff member at work in temporary office space in the Central Library after the earthquake.
Staff in the Registry Building back at work after cleaning up the mess left by the earthquake.
Photograph captioned by Fairfax, "Major earthquake hits Christchurch. Work being done to stabilize a chimney".
Photograph captioned by Fairfax, "Contractors work on a drainage pipe in Kaiapoi after the earthquake".
Photograph captioned by Fairfax, "Roads at Pines Beach need a lot of work. Day after the earthquake".
Photograph captioned by Fairfax, "Roads at Pines Beach need a lot of work. Day after the earthquake".
Photograph captioned by Fairfax, "Volunteer Ambulance officers Sean Lester and Kerry Mitchell work at the Linwood welfare centre
Photograph captioned by Fairfax, "Volunteer Ambulance officers Sean Lester and Kerry Mitchell work at the Linwood welfare centre