Search

found 10 results

Images, Canterbury Museum

One twisted steel re-enforcing rod with parallel spine-like lines running the length of the rod; striations run in a circular pattern between these lines. The object was recovered from the shear wall in the Hotel Grand Chancellor, which was demolished following the 22 February earthquake. This steel reinforcing rod was removed from the Hotel Gr...

Images, Canterbury Museum

One twisted steel re-enforcing rod with parallel spine-like lines running the length of the rod; striations run in a circular pattern between these lines. The object was recovered from the shear wall in the Hotel Grand Chancellor, which was demolished following the 22 February earthquake. This steel reinforcing rod was removed from the Hotel Gr...

Images, Canterbury Museum

One twisted steel re-enforcing rod with parallel spine-like lines running the length of the rod; striations run in a circular pattern between these lines. The object was recovered from the shear wall in the Hotel Grand Chancellor, which was demolished following the 22 February earthquake. This steel reinforcing rod was removed from the Hotel Gr...

Images, Canterbury Museum

One twisted steel re-enforcing rod with parallel spine-like lines running the length of the rod; striations run in a circular pattern between these lines. The object was recovered from the shear wall in the Hotel Grand Chancellor, which was demolished following the 22 February earthquake. This steel reinforcing rod was removed from the Hotel Gr...

Images, UC QuakeStudies

A photograph of a pile of twisted steel reinforcement and other rubble at the entrance to the Smiths City car park on Dundas Street. In the background a section of the collapsed car park has not been demolished yet. Many cars are still parked on the top floor.

Images, UC QuakeStudies

A photograph looking east down Dundas Street. Piles of twisted steel reinforcement have been placed on both sides of the street. Several earthquake-damaged cars, recovered from the Smiths City car park, have been stacked on the left. On the other side of the street is an excavator grapple and bucket. In the distance two excavators are sorting through the rubble.

Images, UC QuakeStudies

A digitally manipulated photograph of twisted reinforcing rods amongst the rubble from the demolition of QEII. The photographer comments, "These rarely seen worms live in the pressurised earth under the foundations of buildings. They need a damp soil and be under at least 100 pounds of pressure per square inch. After the destructive force of an earthquake they swiftly rise to the surface through gaps in the rubble. Unfortunately they quickly die and then crystallise as hard as iron in the dry low pressure air".

Images, UC QuakeStudies

A poem written on Gap Filler and Poetica's "Instant Poetry" wall on Colombo Street. The poem reads, "Amidst the shards of glass and twisted steel, beside the fallen brick and scattered concrete, we began to understand that there is beauty in the broken. Strangers do not live here anymore". This poem was picked by the public as the favourite poem written on the wall. It was then painted permanently onto the mural.

Research papers, University of Canterbury Library

Several concrete cladding panels were damaged during the 2011 Christchurch Earthquakes in New Zealand. Damage included partial collapse of panels, rupture of joint sealants, cracking and corner crushing. Installation errors, faulty connections and inadequate detailing were also contributing factors to the damage. In New Zealand, two main issues are considered in order to accommodate story drifts in the design of precast cladding panels: 1) drift compatibility of tieback or push-pull connections and 2) drift compatibility of corner joints. Tieback connections restrain the panels in the out-of-plane direction while allowing in-plane translation with respect to the building frame. Tieback connections are either in the form of slots or oversized holes or ductile rods usually located at the top of the panels. Bearing connections are also provided at the bottom of panels to transfer gravity loads. At the corners of a building, a vertical joint gap, usually filled with sealants, is provided between the two panels on the two orthogonal sides to accommodate the relative movement. In cases where the joint gap is not sufficient to accommodate the relative movements, panels can collide, generating large forces and the likely failure of the connections. On the other hand, large gaps are aesthetically unpleasing. The current design standards appear to recognize these issues but then leave most of the design and detailing to the discretion of the designers. In the installation phase, the alignment of panels is one of the main challenges faced by installers (and/or contractors). Many prefer temporary props to guide, adjust and hold the panels in place whilst the bearing connections are welded. Moreover, heat generated from extensive welding can twist the steel components inducing undesirable local stresses in the panels. Therefore, the installation phase itself is time-consuming, costly and prone to errors. This paper investigates the performance of a novel panel system that is designed to accommodate lateral inter-story drift through a ‘rocking’ motion. In order to gauge the feasibility of the system, six 2m high precast concrete panels within a single-story steel frame structure have been tested under increasing levels of lateral cyclic drift at the University of Canterbury, New Zealand. Three different panel configurations are tested: 1) a panel with return cover and a flat panel at a corner under unidirectional loading, 2) Two adjacent flat panels under unidirectional loading, and 3) Two flat panels at another oblique corner under bidirectional loading. A vertical seismic joint of 25 mm, filled with one-stage joint sealant, is provided between two of the panels. The test results show the ability of the panels with ‘rocking’ connection details to accommodate larger lateral drifts whilst allowing for smaller vertical joints between panels at corners, quick alignment and easy placement of panels without involving extensive welding on site.