An example of a paper which explains the role of an Asset Owner's Representative - Transport Structures at SCIRT.
This research provides an investigation into the impact on the North Island freight infrastructure, in the event of a disruption of the Ports of Auckland (POAL). This research is important to New Zealand, especially having experienced the Canterbury earthquake disaster in 2010/2011 and the current 2012 industrial action plaguing the POAL. New Zealand is a net exporter of a combination of manufactured high value goods, commodity products and raw materials. New Zealand’s main challenge lies in the fact of its geographical distances to major markets. Currently New Zealand handles approximately 2 million containers per annum, with a minimum of ~40% of those containers being shipped through POAL. It needs to be highlighted that POAL is classified as an import port in comparison to Port of Tauranga (POT) that has traditionally had an export focus. This last fact is of great importance, as in a case of a disruption of the POAL, any import consigned to the Auckland and northern region will need to be redirected through POT in a quick and efficient way to reach Auckland and the northern regions. This may mean a major impact on existing infrastructure and supply chain systems that are currently in place. This study is critical as an element of risk management, looking at how to mitigate the risk to the greater Auckland region. With the new Super City taking hold, the POAL is a fundamental link in the supply chain to the largest metropolitan area within New Zealand.
Since September 2010 Christchurch, New Zealand, has experienced a number of significant earthquakes. In addition to loss of life, this has resulted in significant destruction to infrastructure, including road corridors; and buildings, especially in the central city, where it has been estimated that 60% of buildings will need to be rebuilt. The rebuild and renewal of Christchurch has initially focused on the central city under the direction of the Christchurch City Council. This has seen the development of a draft Central City Plan that includes a number of initiatives that should encourage the use of the bicycle as a mode of transport. The rebuild and renewal of the remainder of the city is under the jurisdiction of a specially set up authority, the Christchurch Earthquake Recovery Authority (CERA). CERA reports to an appointed Minister for Canterbury Earthquake Recovery, who is responsible for coordinating the planning, spending, and actual rebuilding work needed for the recovery. Their plans for the renewal and rebuild of the remainder of the city are not yet known. This presentation will examine the potential role of the bicycle as a mode of transport in a rebuilt Christchurch. The presentation will start by describing the nature of damage to Christchurch as a result of the 2010 and 2011 earthquakes. It will then review the Central City Plan (the plan for the rebuild and renewal for central Christchurch) focusing particularly on those aspects that affect the role of the bicycle. The potential for the success of this plan will be assessed. It will specifically reflect on this in light of some recent research in Christchurch that examined the importance of getting infrastructure right if an aim of transport planning is to attract new people to cycle for utilitarian reasons.
The context of this study is the increasing need for public transport as issues over high private vehicle usage are becoming increasingly obvious. Public transport services need to compete with private transport to improve patronage, and issues with reliability need to be addressed. Bus bunching affects reliability through disruptions to the scheduled headways. The purpose of this study was to collect and analyse data to compare how travel time and dwell time vary, to explore the variation of key variables, and to better understand the sources of these variations. The Orbiter bus service in Christchurch was used as a case study, as it is particularly vulnerable to bus bunching. The dwell time was found to be more variable than travel time. It appeared the Canterbury earthquake had significantly reduced the average speeds for the Orbiter service. In 1964, Newell and Potts described a basic bus bunching theory, which was used as the basis for an Excel bus bunching model. This model allows input variables to vary stochastically. Random values were generated from four specified distributions derived from manually collected data, allowing variance across all bus platforms and buses. However the complexity resulted in stability and difficulty in achieving convergence, so the model was run in single Monte Carlo simulations. The outputs were realistic and showed a higher degree of bunching behaviour than previous models. The model demonstrated bunching phenomena that had not been observed in previous models, including spontaneously un-pairing, overtaking of buses delayed at platforms, and odd-numbered bunches of three buses. Furthermore, the study identified areas of further research for data collection and model development.
Volunteers preparing trees to be transported to the site of the Pallet Pavilion.
Volunteers preparing trees to be transported to the site of the Pallet Pavilion.
Volunteers preparing trees to be transported to the site of the Pallet Pavilion.
A photograph of people transporting materials and props for the 'Sound Cone' project, which is part of LUXCITY.
A story submitted by Adele Geradts to the QuakeStories website.
Transcript of Jocelyn Morresey's earthquake story, captured by the UC QuakeBox project.
Summary of oral history interview with Leanne Everingham about her experiences of the Canterbury earthquakes.
The "Lyttelton Review" newsletter for 28 May 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 5 November 2012, produced by the Lyttelton Harbour Information Centre.
Shows rain falling over two gondolas of people floating past flooded Christchurch damaged houses. One person points to people in balaclavas climbing over the houses and calls out 'And look...the wildlife's returning!'. Context: Heavy rain and flooding hit Christchurch suburbs, including earthquake damaged homes (Newstalk website 14 August 2012). At the same time, wildlife (possums and rare birds) are moving into abandoned suburbs (Stuff 13 August 2012) Quantity: 1 digital cartoon(s).
The "Lyttelton Review" newsletter for 30 July 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 6 August 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 9 July 2012, produced by the Lyttelton Harbour Information Centre.
The "Lyttelton Review" newsletter for 26 November 2012, produced by the Lyttelton Harbour Information Centre.
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that to".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. First few modules in place".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Modules ready to be pinned together".
DAVID SHEARER to the Prime Minister: Is it still a fundamental purpose of his Government to narrow the wage gap between New Zealand and Australia, and to grow local wages in New Zealand? TODD McCLAY to the Minister of Finance: What recent reports has he received on the economy? Hon DAVID PARKER to the Minister of Finance: In dollar terms, what is the shortfall in the tax-take for the nine months to March revealed in yesterday’s Financial Statements compared to October’s pre-election update? Dr RUSSEL NORMAN to the Minister of Finance: How much has been raised to date by the Earthquake Kiwi Bonds and, at this rate, how many years will it take to cover the Government’s estimated $5.5 billion liability resulting from the Canterbury earthquakes? Hon TAU HENARE to the Minister for Social Development: How will Budget 2012 provide greater support for young people most at risk of long-term welfare dependency? Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: Does he stand by the Prime Minister’s statement regarding asset sales that “We are not going to do anything tricky there”? Dr JIAN YANG to the Associate Minister of Health: How is the Government expanding its programme to reduce rheumatic fever in vulnerable communities? Hon ANNETTE KING to the Minister of Housing: Does he stand by all his comments regarding housing? JULIE ANNE GENTER to the Minister of Transport: What is the plan to pay for the Government’s transport expenditure given that the Ministry of Transport’s Briefing to the Incoming Minister warns of a funding shortfall of $4.9 billion if high oil prices and low GDP growth continue? MARK MITCHELL to the Minister for Economic Development: How is the Government improving value for money in its procurement of services for the public sector? DARIEN FENTON to the Minister of Labour: Does she stand by her statement that “I do not want to see unnecessary change for change’s sake. Rather I am looking to put in place pragmatic solutions as we implement our manifesto commitments and let employers, employees and business focus on what they do best.”? Rt Hon WINSTON PETERS to the Prime Minister: Does he still have confidence in the Minister for Social Development and the Associate Ministers for Social Development; if so, why?
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Back on the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Front on the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Side of the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. The new base, which breaks into two sections each 48x70 studs".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. The new base, which breaks into two sections each 48x70 studs".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Here you can see a couple of aspects of how the model is put together. The technique used proved - from what I tried - to be the best and strongest way to do it".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Here you can see a couple of aspects of how the model is put together. The technique used proved - from what I tried - to be the best and strongest way to do it".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Here you can see a couple of aspects of how the model is put together. The technique used proved - from what I tried - to be the best and strongest way to do it".