Search

found 18 results

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "The Heathcote Valley entrance to the Bridal Track to Lyttelton was closed for a year because of the danger of falling rocks. It opened on the morning of December 23. The earthquake at lunchtime then closed it again when more rocks fell".

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "The Heathcote Valley entrance to the Bridle Track to Lyttelton was closed for a year because of the danger of falling rocks. It opened on the morning of December 23. The earthquake at lunchtime then closed it again when more rocks fell".

Images, UC QuakeStudies

A photograph looking west down Armagh Street towards the intersection with Colombo Street. In the background, a crane is parked on the road next to the Forsyth Barr Building. In the foreground, the pavement has risen near the tram tracks.

Images, UC QuakeStudies

A photograph looking south down New Regent Street from the intersection of Armagh Street. Scaffolding is holding up the facades of buildings on the left hand side, and there has been considerable damage to the paving along the tram tracks.

Images, UC QuakeStudies

Surveyors marking out Kirkwood Village, used as temporary teaching and office space for the University of Canterbury. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3. Surveyors mark out the temporary staff office buildings on the running track".