SCIRT Survey As-Built Guideline
Articles, UC QuakeStudies
A technical guideline which defines SCIRT Delivery Team requirements for as-built field surveying and attribute information.
A technical guideline which defines SCIRT Delivery Team requirements for as-built field surveying and attribute information.
A document which sets out the 12d standards at SCIRT.
A report detailing the Liquefaction Trial, the observations, and discussions of the trial interpretation and findings.
A video filmed during the Liquefaction Trial detonation and immediately following (run time approximately one minute).
A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.