Photograph number UC 11-0138-28
Images, UC QuakeStudies
Workers stabilising piles, ready for conrete to be poured in, at the College of Education.
Workers stabilising piles, ready for conrete to be poured in, at the College of Education.
Workers stabilising piles, ready for conrete to be poured in, at the College of Education.
Workers stabilising piles, ready for conrete to be poured in, at the College of Education.
Workers stabilising piles, ready for conrete to be poured in, at the College of Education.
Consumer confidence has stabilised after falling to a two year low in March, following the Christchurch earthquake.
A video about the removal of the dome of the Cathedral of the Blessed Sacrament on Barbadoes Street. The dome is being removed in order to take weight off the building and help stabilise the lower sections.