An example of a checklist used by SCIRT traffic management teams to perform site checks.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. There is a portacom on the site, and construction material is leaning against the mural.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Construction material has been laid up against the mural.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel have been laid up against the mural.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel and other construction material have been laid up against the mural.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. A skip, several pallets, and other construction material have been placed in front of the mural.