Roading contractors are already repairing many Christchurch streets damaged by last week's earthquake.
An entry from Ruth Gardner's blog for 19 May 2012 entitled, "Road Repairs".
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
Roading machinery parked on the side of River Road. The road is under repair, but has not yet been resealed. The photographer comments, "Looking east to Banks Ave-Dallington Tce. River Rd nearly ready for re-sealing. Over the next year, the road subsided and was repaired 3 or 4 times".
Road cones line a hole in Gayhurst Road, dug for pipe repairs.
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
Workers undertake repairs to the Avondale Road bridge.
A digger scraping damaged tarseal from River Road in Richmond. The photographer comments, "Road repairs".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph captioned by Paul Corliss, "Port Hills Road factories, post drill and glue of cracks".
A photograph of repaired cracks on Governors Bay Road.
A photograph of repaired cracks on Governors Bay Road.
A photograph of repaired cracks on Governors Bay Road.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
Some Christchurch homeowners fear they're being rail roaded into using the Earthquake Commission's preferred builders when it comes to earthquake repairs.
Road cones along the side of Halswell Road where the road has been repaired and sealed after slumping. There are still cracks in the footpath and curb.
A road worker standing next to a 'Road closed' sign on Antigua Street. In the distance, dust is rising from road repairs. To the right, a brick fence has collapsed.
Repairs are being carried out on the Avondale Road bridge.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.
Cracks partially repaired on Woodham Road in Avonside, with road cones warning cars of rubble, after the September 4th earthquake.
Photograph captioned by BeckerFraserPhotos, "The almost-repaired west end of Woodham Road where the ground rose about 40 cm".
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...
A digger scraping damaged tarseal from River Road in Richmond. A portaloo sits on the side of the road. The photographer comments, "Road repairs. River Rd, Richmond, looking west".
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.