Search

found 43 results

Images, eqnz.chch.2010

20130125_1749_1D3-400 Road Closed 1 The Lyttelton side of Evans Pass is closed (since the earthquake 23 months ago - 22/02/11). Prior to the road tunnel (through the Port Hills) opening in the early 1960s this was the main access road to the port of Lyttelton. #3072

Images, eqnz.chch.2010

This is the Summit Road below Mt Cavendish and shows a few remaining high buildings in the central city beyond (in setting sun). Just above centre is the doomed AMI Stadium (1) aka Lancaster Park, home to Canterbury cricket and rugby till the erathquakes.

Images, UC QuakeStudies

On the one year anniversary of the February 22nd, flowers were placed in road cones across Christchurch to remember the earthquake victims. These two cone are next to a road sign that says 'Footpath closed. Please use other site'.

Images, UC QuakeStudies

On the one year anniversary of the February 22nd, flowers were placed in road cones across Christchurch to remember the earthquake victims. This cone is next to a road sign that says 'Footpath closed. Please use other site'.

Audio, Radio New Zealand

The only Christchurch street still closed following the 2011 earthquake will reopen later in 2018 only to close again in 2019 so the council can extend the route for the tram. The proposal has raised the ire of fledgling businesses along High st worried about the disruption the road works will cause them and wanting the work done now, before they open their doors to the public.

Images, UC QuakeStudies

View down Papanui Road. Some road works ahead with a sign that says 'Extreme Care Cyclist Merging' and 'Footpath closed please use other side'. On the left is a shop operating out of a shipping container in a site where a building has been demolished.

Images, eqnz.chch.2010

20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...

Images, UC QuakeStudies

The road cordon on Hereford Street just outside the T & G Building (formerly known as Kenton Chambers). On the fence is a banner that reads 'Hope' and behind it is a street sign that reads 'Road closed'. A digger and building rubble can be seen in the background.

Images, UC QuakeStudies

The road cordon on Hereford Street just outside the T & G Building (formerly known as Kenton Chambers). On the fence is a banner that reads 'Hope' and behind it is a street sign that reads 'Road closed'. A digger and building rubble can be seen in the background.

Audio, Radio New Zealand

Many areas of Christchurch are underwater, dealing with what's been described as the worst flooding since the earthquakes. The high tide has just passed, with the rivers already running across roads and flooding into some homes. Schools have been closed, businesses inundated and dozens of roads around the city, closed. Already more than 70mm of rain has fallen in the past 24 hours, making it the city's wettest July on record. Now as the bad weather moves south the army has been put on standby in Dunedin for the expected deluge there. RNZ reporters Niva Chittock, Adam Burns and cameraman Nathan McKinnon are in Christchurch with the details.