Gloucester Street bridge - video
Videos, UC QuakeStudies
A video which describes the history of the bridge and SCIRT's repair methodology.
A video which describes the history of the bridge and SCIRT's repair methodology.
More than 300 people turned out to a meeting in Christchurch last night to hear about botched Earthquake Commission repairs.
A public relations flyer which outlines the repairs undertaken on the Gloucester Street bridge.
As a result of the Canterbury earthquakes, over 60% of the concrete buildings in the Christchurch Central Business District have been demolished. This experience has highlighted the need to provide guidance on the residual capacity and repairability of earthquake-damaged concrete buildings. Experience from 2010 Chile indicates that it is possible to repair severely damaged concrete elements (see photo at right), although limited testing has been performed on such repaired components. The first phase of this project is focused on the performance of two lightly-reinforced concrete walls that are being repaired and re-tested after damage sustained during previous testing.
Frustrated Christchurch home-owners have delivered a 3000 strong petition to the government, calling for a Royal Commission of Inquiry into shoddy earthquake repairs.
Christchurch homeowners speak to Checkpoint about their battles with EQC, to have their homes repaired to "as new" standard, not "pre earthquake".
Those repairing an earthquake damaged cliff in Christchurch have had to wrangle with home owners who don't want to sell, and relocating a rare flightless moth. Rachel Graham reports.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A run sheet which details who will do what at the opening of the Gloucester Street bridge.
After calls for an inquiry into Christchurch home repairs, Canterbury Earthquake Recovery Minister Gerry Brownlee joins Checkpoint.
The Earthquake Commission could have a big job on its hands fixing quake damaged Christchurch homes for a second time.
Repair work on Christchurch's iconic Town Hall, badly damaged in the earthquakes, has nearly hit the halfway mark.
People can walk over Christchurch's Bridge of Remembrance once again, after nearly seven million dollars in earthquake repairs.
Many Christchurch residents have used shipping containers and other temporary structures to store belongings in while repairs were carried out after the earthquakes. But the Christchurch City Council says it's had an increase in complaints from residents about containers and other temporary structures obscuring neighbours' views or obstructing council berms. Chairman of the council's regulation and consents committee David East says if earthquake repairs are completed, the container may have to go.
Christchurch businesses are calling on the council to keep the New Brighton pier open while earthquake repairs are completed.
Christchurch businesses are calling on the council to keep the New Brighton pier open while earthquake repairs are completed.
A section of retaining wall that tilted in the Christchurch 2011 earthquake. At the Edmunds Band Rotunda sight. Still not repaired,
A document which specifies the technical requirements for the rehabilitation and repair of pipes using lining methodologies during the SCIRT programme of work.
Christchurch council has asked its residents to tell it if earthquake repairs haven't been done so it can accurately assess their property's value.
A world class centre for music and the arts has opened in Christchurch, after The Music Centre of Christchurch was damaged beyond repair in the 2011 earthquakes.
Christchurch City Council abandons plan to sell its City Care maintenance bid as part of its plan to raise $600 million to repair infrastructure damaged by earthquakes.
This poster presents preliminary results of ongoing experimental campaigns at the Universities of Auckland and Canterbury, aiming at investigating the seismic residual capacity of damaged reinforced concrete plastic hinges, as well as the effectiveness of epoxy injection techniques for restoring their stiffness, energy dissipation, and deformation capacity characteristics. This work is part of wider research project which started in 2012 at the University of Canterbury entitled “Residual Capacity and Repairing Options for Reinforced Concrete Buildings”, funded by the Natural Hazards Research Platform (NHRP). This research project aims at gaining a better understanding and providing the main end-users and stakeholders (practitioner engineers, owners, local and government authorities, insurers, and regulatory agencies) with comprehensive evidence-based information and practical guidelines to assess the residual capacity of damaged reinforced concrete buildings, as well as to evaluate the feasibility of repairing and thus support their delicate decision-making process of repair vs. demolition or replacement.
A report which details the archaeological investigations carried out during the course of SCIRT projects 11115 and 11159, wastewater renewal work and storm water repair work on Ferry Road.
Kaikoura and Wellington businesses operating adjacent to quake damaged buildings may face disruption for years to come as owners drag their feet on repair or demolition work. A Christchurch property owner has been unable to completely re-open for business since the February 2011 earthquake.
A legal settlement between the Earthquake Commission and a group of Canterbury homeowners over the standard of quake repairs, is being described as a milestone for house owners throughout the country. The Reserve Bank has left the cost of borrowing unchanged at a record low 2-point-25 percent, athough it is signalling further cuts remain on the cards.
A document which explains the pre-approval process for specialist lining contractors working on the SCIRT horizontal repair programme.This document has had sections removed and redacted to protect contractors' commercial interests.For a current list of approved contractors authorised to carry out lining works on Christchurch City Council assets, contact the Council.
The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.
AMI Stadium (Lancaster Park), not used since the February 2011 earthquake. It was used predominantly for rugby and cricket. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired. The concrete pad lower left is ...
Resilience and community spirit have shone through in North Canterbury in the aftermath of the earthquake. With no active civil defence post in operation in Cheviot in the days after the 7.8 quake, a group of locals mobilised a task force to support those in need. Further north at Mendip Hills Station farm manager Simon Lee has been repairing broken water pipes and clearing slips in time for weaning, while on Ben Lissington's dairy farm near Waiau, milk tankers are having to go off the beaten track to get to the rotary shed after a six metre section of the road was destroyed.
20160703_144759_GT-S7275T-04 New sea wall at Redcliffs (185/366) I went for a drive in my second car mainly to charge the battery up and forgot to take my camera gear so only had my phone. This is the new rock wall to replace the severely damaged previous one (in the February 2011 earthquake). Work is still underway on the car parking and p...