
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Column reinforcement exposed under spalled concrete after the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need for reinforcement. The clock has stopped at around 16:35, the time of the earthquake.
The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.
The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.
Cracks in the parapet of a building on Tuam Street. Steel reinforcement can be seen sticking out of the front wall.
The Para Rubber Building on Manchester Street, its demolition nearly complete. A concrete post can be seen in this picture, the steel reinforcement visible out the sides.
Cross cracking on the Manchester Courts Building between the windows. This means that there was no vertical reinforcement in the building and it will have to come down.
The Westpac building suffered damage at its beam / column joints during the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This shop on Riccarton Road was badly damaged in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010, and had to be demolished.
Structural damage to St Elmo Courts with diagonal cracks between the windows of the building. These cracks show that there has been rocking of the masonry piers which means there is no vertical reinforcement provided in the walls.
This shop caught fire when power restored caused sparks that ignited leaking gas, in the aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Repairs being carried out on this restaurant (converted from a church) at the Hereford Street / Manchester Street intersection;aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.