The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need for reinforcement. The clock has stopped at around 16:35, the time of the earthquake.
The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.
The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.
Cracks in the parapet of a building on Tuam Street. Steel reinforcement can be seen sticking out of the front wall.
The Para Rubber Building on Manchester Street, its demolition nearly complete. A concrete post can be seen in this picture, the steel reinforcement visible out the sides.
Cross cracking on the Manchester Courts Building between the windows. This means that there was no vertical reinforcement in the building and it will have to come down.
Structural damage to St Elmo Courts with diagonal cracks between the windows of the building. These cracks show that there has been rocking of the masonry piers which means there is no vertical reinforcement provided in the walls.