Search

found 50 results

Images, UC QuakeStudies

A photograph of the crowd at the launch of the Green Room on Colombo Street.Crack'd for Christchurch comments, "Before the speeches. The Green Room is on Colombo Street in the centre of the rebuild, with vacant lots surrounding it. We wanted it to be an oasis of calm and hope for Christchurch people. It is only a temporary site."

Images, UC QuakeStudies

A photograph of the crowd at the launch of the Green Room on Colombo Street.Crack'd for Christchurch comments, "Before the speeches. The Green Room is on Colombo Street in the centre of the rebuild, with vacant lots surrounding it. We wanted it to be an oasis of calm and hope for Christchurch people. It is only a temporary site."

Articles, UC QuakeStudies

A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.