An entry from Ruth Gardner's blog for 19 May 2012 entitled, "Road Repairs".
Temporary repairs to the damaged gable ends of a brick building.
The Medway Street footbridge in Richmond has warped beyond repair in the February 2011 earthquake.
The Medway Street footbridge in Richmond has warped beyond repair in the February 2011 earthquake.
Various rebuilding and repairing activities on Gloucester Street, with road signs and cranes in the background.
A structural engineer has denied he rushed the inspection of earthquake repairs to a Christchurch bar so it could re-open in time for New Years Eve.
Ongoing repair and deconstruction work on Victoria Street. A demolition site has been turned to a carpark.
Ongoing repair and deconstruction work on Victoria Street. The car park to the left of the image was left after the demolition of a building.
A photograph captioned, "After the September earthquake, it was more a simple case of something gets broken and it gets repaired. Then came February, and June as well, and suddenly it's just not so straightforward anymore".
A digitally manipulated image of liquefaction around a house in Avondale. The photographer comments, "The bottom of the gates were swallowed up by liquefaction, but the house still looked in good condition, which was confirmed by builders just going in to work on the property. It is in the Christchurch red zone, which after testing has been deemed unsuitable for houses to be built on. All the land will be bought by the Government and they would also buy any properties that could be repaired. The remaining insured property owners will get a payment from the insurance company. All the buildings are condemned to be knocked down".
A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.
A video about the discovery of a historic tramline on North Avon Road. The video includes an interview with Brent Leersynder, a site engineer for SCIRT, and Steve Timpson, site foreman for SCIRT. The SCIRT team found the tramline while repairing the damaged wastewater system under North Avon Road in May.
Glass panels with brass surrounds, stacked inside a building. The photographer comments, "These were brass dividers that were brought inside the building two years ago after the Christchurch earthquake. They have been sitting there abandoned in a restaurant that will be either repaired and reopened at a later date or demolished like the many others of its kind".
A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".
A digitally manipulated image of furniture and machinery. The photographer comments, "This furniture restoration company got caught in the middle of the Christchurch earthquake and lost a whole wall. After constant exposure to the elements everything now needs a bit of restoration. They are now working in a different part of Christchurch, but their past can still be seen".
A digitally manipulated image of two chairs sitting among rubble. The photographer comments, "There is a strip of land that has been declared as the red zone. This means that the houses facing towards the tidal estuary must be abandoned as they are on land that has been declared uneconomic to repair after the Christchurch earthquakes. These chairs are at the front of one of these properties that will be bulldozed. These seem to be saying come hell or high water we will not be moved".
Liquefaction in a residential property in North New Brighton. The fence has subsided into the silt, and a temporary water line runs along the street in front. The photographer comments, "Because this is in the Christchurch red zone the people living here, if they have lost one of the normal essentials such as sewage they will not get it repaired. It is get out or live in third world conditions. The blue line is the temporary water pipe, which will be removed when the area is depopulated".
A small wooden cross is inserted between stones laid out in the shape of a large cross. The photographer comments, "This is an Earthquake Memorial on Manchester Street, Christchurch, New Zealand. This message is on the tree next to the memorial: 'Earthquake Memorial. 185 people died as a result of the 22 February 2011 earthquake. 185 precious lives are remembered here, with 185 pieces of Halswell stone recovered from St Luke's Church, damaged beyond repair on that day. May they rest in peace. St Luke's in the City'".
A view down Beresford Street in New Brighton, looking west towards the city at sunset. The photographer comments, "On the other side of the Avon river from New Brighton is the Bexley red zone. Here numerous earthquake damaged streets of houses will be flattened due to it being to uneconomical in the current climate to repair the land to be suitable for housing. There is a campaign at the moment to try and convert all this red zone land, which is mainly adjacent to the Avon river to a giant park".
Shows a helicopter spray painting Christchurch with the Canterbury colours of black and red. Someone in the helicopter yells that 'it's gotta be better than tint of TC3'. Context: Probably refers to the apology by Earthquake Recovery Minister Gerry Brownlee for offending Christchurch's TC3 residents after saying he was 'sick and tired' of their moaning. TC3 means 'technical category 3'. Land classified TC3 is the mostly badly quake-damaged considered economically repairable. Quantity: 1 digital cartoon(s).
Refers to the controversy over the decision to demolish the Christchurch Cathedral which was severely damaged in the earthquakes of 2010 and 2011. The Anglican Bishop of Christchurch Victoria Mathews says the decision to demolish the cathedral was reached through prayer, great deliberation and with the utmost concern for safety. The Bishop says a number of options were considered before deciding to bring the walls down but the turning point was 23 December 2011, when a series of strong quakes rocked the city. At that stage the Canterbury Earthquake Authority approached the church. "CERA told us that our plans for making safe and retrieving, and then stepping back and making further decisions were no longer adequate." Christchurch City council announced their support on Twitter this afternoon (17 May 2012) - tweeting an endorsement to an immediate pause on demolition of the Cathedral to enable deeper and more open consideration of options. Quantity: 1 digital cartoon(s).