Search

found 33 results

Images, UC QuakeStudies

The stump of an oak tree in the Halswell Primary School grounds. The oak tree had the be cut down after it broke during the earthquake and was hanging at a angle. The person who cut down the tree has carved "1870 - 16:9:2010" into the stump, the year that the tree was planted, and then the day that it broke and fell.

Research papers, Victoria University of Wellington

A natural disaster will inevitably strike New Zealand in the coming years, damaging educational facilities. Delays in building quality replacement facilities will lead to short-term disruption of education, risking long-term inequalities for the affected students. The Christchurch earthquake demonstrated the issues arising from a lack of school planning and support. This research proposes a system that can effectively provide rapid, prefabricated, primary schools in post-disaster environments. The aim is to continue education for children in the short term, while using construction that is suitable until the total replacement of the given school is completed. The expandable prefabricated architecture meets the strength, time, and transport requirements to deliver a robust, rapid relief temporary construction. It is also adaptable to any area within New Zealand. This design solution supports personal well-being and mitigates the risk of educational gaps, PTSD linked with anxiety and depression, and many other mental health disorders that can impact students and teachers after a natural disaster.

Images, UC QuakeStudies

A banner on the fence of Burwood Primary School expressing the student's appreciation for the efforts of the civil defence, fire service, volunteers and council workers with a banner on their school fence. On each heart-shape note is a personal message from the students.