A graphic showing the design of a proposed swimming pool for New Brighton.
A page banner promoting an article titled, "Pool plan: new crowd puller for New Brighton".
An entry from Ruth Gardner's Blog for 23 June 2014 entitled, "Parting with the Pool".
A digitally manipulated image of the high diving boards at QEII swimming pool. Rubble has fallen on the boards during the demolition of the complex. The photographer comments, "The diving board at the QEII stadium swimming pool during its demolition after being damaged in the Christchurch earthquake in February 2011".
The top of the water slides in the QEII swimming pool, exposed by its demolition. The slides themselves have been broken off, leaving only the entry points. The photographer comments, "After assessment of the damage caused by the numerous earthquakes in Christchurch, New Zealand they decided to demolish the QEII stadium and it's swimming pool".
A digitally manipulated image of the high diving boards at QEII swimming pool. Rubble has fallen on the boards during the demolition of the complex. A sign reads "Poseidon Extreme". The photographer comments, "I do not know what Poseidon Extreme at this swimming pool looked like before the earthquake damaged it, but it looks really radical now during it's demolition. A strange coincidence is that Poseidon is referred to as 'Earth-Shaker' due to his role in causing earthquakes. So the demolition of this pool due to the series of quakes in Christchurch all seems to be foretold by the gods and that sign".
Corrogated roofing from the demolition of the QEII complex. The photographer comments, "This collection of galvanised roofing looks so photogenic as I walked around the partly demolished Queen Elizabeth stadium and swimming pool".
The original Commonwealth Games venue was destroyed in the earthquake.
A video of an interview with Alison Locke about the Elsie Locke Park in Christchurch which was created to honour her mother. Locke talks about finding out that the park will be replaced, her fears that other heritage sites in Christchurch will be lost, and her belief that her mother would have wanted the Centennial Swimming Pool to be saved. The park will be replaced with The Margaret Mahy Family Playground, which will include a mix of uniquely-designed playground equipment, recreational spaces, community gardens, art pieces, and water features.
A video of the Christchurch central city covered in snow. The video includes footage of the ChristChurch Cathedral, Gloucester Street, New Regent Street, Manchester Street, Latimer Square, Centennial Pool, Armagh Street, McLeans Mansion, Hagley Park, Rolleston Avenue, Worcester Street, the Peacock Fountain in the Botanic Gardens, and Dyers Pass Road.
The repair of Christchurch's earthquake damaged arts centre has revealed details hidden from view for forty years including a badminton court and the site of an old swimming pool.
Photograph captioned by Fairfax, "Billy McIndoe walks past his boss's swiming pool which had been lifted out of the ground in Grey Crescent, Kaiapoi".
Photograph captioned by Fairfax, "Billy McIndoe walks past his boss's swiming pool which had been lifted out of the ground in Grey Crescent, Kaiapoi".
Photograph captioned by Fairfax, "Billy McIndoe walks past his boss's swiming pool which had been lifted out of the ground in Grey Crescent, Kaiapoi".
An infographic showing estimated repair costs for major Christchurch City Council facilities.
A map showing the location of properties being purchased by the Crown for the frame and bus interchange.
Photograph captioned by Fairfax, "As a gesture of goodwill following the earthquake the Christchurch City Council's Recreation and Sport Centres are offering free admission to the pools this weekend. Jamie Curd (9) swimming for free at the Centennial Pool".
Photograph captioned by Fairfax, "Christchurch Earthquake. Maria Romero gave birth to Lola Mae during the September 4 2010 earthquake. Romero was in a birthing pool in Christchurch Women's Hospital on the 5th floor when the earthquake struck. Maria Romero (mother) and Lola Mae Romero".
A video of an interview with Arts Centre CEO Andre Lovatt about the restoration of the Arts Centre after the 22 February 2011 earthquake. The video also includes a tour of the Arts Centre, including the Boys' High School swimming pool and gymnasium which was exposed after another building was demolished.
Photograph captioned by Fairfax, "Christchurch Earthquake. Maria Romero gave birth to Lola Mae during the September 4 2010 earthquake. Romero was in a birthing pool in Christchurch Women's Hospital on the 5th floor when the earthquake struck. (L-R) Maria Romero (mother), Lola Mae Romero, Lucas Romero 2 years old and Nick Blackburn (father)".
Photograph captioned by Fairfax, "Christchurch Earthquake. Maria Romero gave birth to Lola Mae during the September 4 2010 earthquake. Romero was in a birthing pool in Christchurch Women's Hospital on the 5th floor when the earthquake struck. (L-R) Maria Romero (mother), Lola Mae Romero, Lucas Romero 2 years old and Nick Blackburn (father)".
A school pool, a BMX bike club and a music school are among twenty organisations in Christchurch that have benefitted from the final grants from an international appeal for re-building the quake-damaged city. The Christchurch Earthquake Appeal has so far raised almost 100 million dollars, and as our reporter Teresa Cowie discovered, the latest 8 million dollars that's been released from the fund is giving a welcome boost to residents.
One of many disabled carparks outside what used to be one of the great sporting complexes in New Zealand. The Queen Elizabeth II Park complex in north-east Christchurch was built initially for the 1974 Commonwealth Games and was used for track and field and the adjoining pool complex had swimming and diving. It was built on an area that was used...
The cartoon shows Gerry Brownlee, the Minister for Earthquake Recovery, walking towards a spa wearing swimming togs and with a blow-up toy around his waist. Context: The cartoon illustrated an article entitled 'Sutton candid about struggles'. Cera boss Roger Sutton received politicians in the empty Centennial Park spa pool after the February earthquake when he was still head of lines company Orion. Quantity: 1 digital cartoon(s).
The title reads 'Future Christchurch CBD?...' Two people stare at numerous large featureless blocks across the Avon River. One says 'Those buildings look pretty ugly' and the other points out that they are 'just the piles'. Context: The Christchurch City Council is moving to impose urban-design etiquette and avert architectural mistakes such as clashing with the neighbours, glaring corporate colours and the long, blank walls common to most suburban shopping malls. The proposed rules will be overseen by an urban-design panel of four experts drawn from a pool of 12 architects, designers, planners and valuers. Quantity: 1 digital cartoon(s).
This thesis documents the development and demonstration of an assessment method for analysing earthquake-related damage to concrete waste water gravity pipes in Christchurch, New Zealand, following the 2010-2011 Canterbury Earthquake Sequence (CES). The method is intended to be internationally adaptable to assist territorial local authorities with improving lifelines infrastructure disaster impact assessment and improvements in resilience. This is achieved through the provision of high-resolution, localised damage data, which demonstrate earthquake impacts along the pipe length. The insights gained will assist decision making and the prioritisation of resources following earthquake events to quickly and efficiently restore network function and reduce community impacts. The method involved obtaining a selection of 55 reinforced concrete gravity waste water pipes with available Closed-Circuit Television (CCTV) inspection footage filmed before and after the CES. The pipes were assessed by reviewing the recordings, and damage was mapped to the nearest metre along the pipe length using Geographic Information Systems. An established, systematic coding process was used for reporting the nature and severity of the observed damage, and to differentiate between pre-existing and new damage resulting from the CES. The damage items were overlaid with geospatial data such as Light Detection and Ranging (LiDAR)-derived ground deformation data, Liquefaction Resistance Index data and seismic ground motion data (Peak Ground acceleration and Peak Ground Velocity) to identify potential relationships between these parameters and pipe performance. Initial assessment outcomes for the pipe selection revealed that main pipe joints and lateral connections were more vulnerable than the pipe body during a seismic event. Smaller diameter pipes may also be more vulnerable than larger pipes during a seismic event. Obvious differential ground movement resulted in increased local damage observations in many cases, however this was not obvious for all pipes. Pipes with older installation ages exhibited more overall damage prior to a seismic event, which is likely attributable to increased chemical and biological deterioration. However, no evidence was found relating pipe age to performance during a seismic event. No evidence was found linking levels of pre-CES damage in a pipe with subsequent seismic performance, and seismic performance with liquefaction resistance or magnitude of seismic ground motion. The results reported are of limited application due to the small demonstration sample size, but reveal the additional level of detail and insight possible using the method presented in this thesis over existing assessment methods, especially in relation to high resolution variations along the length of the pipe such as localised ground deformations evidenced by LiDAR. The results may be improved by studying a larger and more diverse sample pool, automating data collection and input processes in order to improve efficiency and consider additional input such as pipe dip and cumulative damage over a large distance. The method is dependent on comprehensive and accurate pre-event CCTV assessments and LIDAR data so that post-event data could be compared. It is proposed that local territorial authorities should prioritise acquiring this information as a first important step towards improving the seismic resilience of a gravity waste water pipe network.
This thesis documents the development and demonstration of an assessment method for analysing earthquake-related damage to concrete waste water gravity pipes in Christchurch, New Zealand, following the 2010-2011 Canterbury Earthquake Sequence (CES). The method is intended to be internationally adaptable to assist territorial local authorities with improving lifelines infrastructure disaster impact assessment and improvements in resilience. This is achieved through the provision of high-resolution, localised damage data, which demonstrate earthquake impacts along the pipe length. The insights gained will assist decision making and the prioritisation of resources following earthquake events to quickly and efficiently restore network function and reduce community impacts. The method involved obtaining a selection of 55 reinforced concrete gravity waste water pipes with available Closed-Circuit Television (CCTV) inspection footage filmed before and after the CES. The pipes were assessed by reviewing the recordings, and damage was mapped to the nearest metre along the pipe length using Geographic Information Systems. An established, systematic coding process was used for reporting the nature and severity of the observed damage, and to differentiate between pre-existing and new damage resulting from the CES. The damage items were overlaid with geospatial data such as Light Detection and Ranging (LiDAR)-derived ground deformation data, Liquefaction Resistance Index data and seismic ground motion data (Peak Ground acceleration and Peak Ground Velocity) to identify potential relationships between these parameters and pipe performance. Initial assessment outcomes for the pipe selection revealed that main pipe joints and lateral connections were more vulnerable than the pipe body during a seismic event. Smaller diameter pipes may also be more vulnerable than larger pipes during a seismic event. Obvious differential ground movement resulted in increased local damage observations in many cases, however this was not obvious for all pipes. Pipes with older installation ages exhibited more overall damage prior to a seismic event, which is likely attributable to increased chemical and biological deterioration. However, no evidence was found relating pipe age to performance during a seismic event. No evidence was found linking levels of pre-CES damage in a pipe with subsequent seismic performance, and seismic performance with liquefaction resistance or magnitude of seismic ground motion. The results reported are of limited application due to the small demonstration sample size, but reveal the additional level of detail and insight possible using the method presented in this thesis over existing assessment methods, especially in relation to high resolution variations along the length of the pipe such as localised ground deformations evidenced by LiDAR. The results may be improved by studying a larger and more diverse sample pool, automating data collection and input processes in order to improve efficiency and consider additional input such as pipe dip and cumulative damage over a large distance. The method is dependent on comprehensive and accurate pre-event CCTV assessments and LIDAR data so that post-event data could be compared. It is proposed that local territorial authorities should prioritise acquiring this information as a first important step towards improving the seismic resilience of a gravity waste water pipe network.