Search

found 9 results

Images, UC QuakeStudies

A photograph of the entrance to the Crowne Plaza Hotel. The window to the left has been boarded up with plywood, and tape has been placed in front to keep the area clear. A green sticker can be seen in the window to the right, indicating that the hotel is safe to enter.

Images, UC QuakeStudies

A photograph of an earthquake-damaged building on the corner of Tuam and Colombo Streets. The brick wall on the top storey of the building has crumbled onto the footpath below and the windows on the bottom storey have been boarded up with plywood. Workers in a cherry picker and a crane-raised platform are working on the second storey. Wire fencing surrounds the building.

Images, UC QuakeStudies

A photograph of an earthquake-damaged building on the corner of Tuam and Colombo Streets. The brick wall on the top storey of the building has crumbled onto the footpath below and the windows on the bottom storey have been boarded up with plywood. Workers in a cherry picker and a crane-raised platform are working on the second storey. Wire fencing surrounds the building.

Images, UC QuakeStudies

A photograph of the earthquake damage to R&R Sport on the corner of Colombo and Tuam Streets. Most of the side wall has crumbled, the bricks spilling onto the footpath below. Plywood and plastic sheeting has been used to weather proof the building. Wire fencing and road cones have been placed around the building as a cordon. A cherry picker is parked on the footpath in between the building and the fence.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need for reinforcement. The clock has stopped at around 16:35, the time of the earthquake.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.