Search

found 28 results

Images, UC QuakeStudies

Workers eat lunch at an outdoor table next to the Gap Filler Community Chess Set on Colombo Street. The Chess Set was a collaboration between Gap Filler and students at the University of Canterbury. The project aimed to restore the iconic Christchurch Chess Set that used to be played in Cathedral Square.

Images, UC QuakeStudies

A photograph of footage of Cathedral Square playing on a number of computer monitors as part of Gap Filler's ninth project, Thinking Outside the Square. The footage was sourced from the Christchurch community and cut into an hour-long video spanning 100 years.

Images, UC QuakeStudies

A photograph of footage of Cathedral Square playing on a number of computer monitors as part of Gap Filler's ninth project, Thinking Outside the Square. The footage was sourced from the Christchurch community and cut into an hour-long video spanning 100 years.

Images, UC QuakeStudies

A photograph of footage of Cathedral Square playing on a number of computer monitors as part of Gap Filler's ninth project, Thinking Outside the Square. The footage was sourced from the Christchurch community and cut into an hour-long video spanning 100 years.

Images, UC QuakeStudies

A photograph of footage of Cathedral Square playing on a number of computer monitors as part of Gap Filler's ninth project, Thinking Outside the Square. The footage was sourced from the Christchurch community and cut into an hour-long video spanning 100 years.

Images, UC QuakeStudies

A photograph of footage of Cathedral Square playing on a number of computer monitors as part of Gap Filler's ninth project, Thinking Outside the Square. The footage was sourced from the Christchurch community and cut into an hour-long video spanning 100 years.

Images, UC QuakeStudies

A photograph of footage of Cathedral Square playing on a number of computer monitors as part of Gap Filler's ninth project, Thinking Outside the Square. The footage was sourced from the Christchurch community and cut into an hour-long video spanning 100 years. The monitors are placed amongst wooden pallets, an excavator, and other building material.

Research Papers, Lincoln University

Disasters are a critical topic for practitioners of landscape architecture. A fundamental role of the profession is disaster prevention or mitigation through practitioners having a thorough understanding of known threats. Once we reach the ‘other side’ of a disaster – the aftermath – landscape architecture plays a central response in dealing with its consequences, rebuilding of settlements and infrastructure and gaining an enhanced understanding of the causes of any failures. Landscape architecture must respond not only to the physical dimensions of disaster landscapes but also to the social, psychological and spiritual aspects. Landscape’s experiential potency is heightened in disasters in ways that may challenge and extend the spectrum of emotions. Identity is rooted in landscape, and massive transformation through the impact of a disaster can lead to ongoing psychological devastation. Memory and landscape are tightly intertwined as part of individual and collective identities, as connections to place and time. The ruptures caused by disasters present a challenge to remembering the lives lost and the prior condition of the landscape, the intimate attachments to places now gone and even the event itself.

Research papers, The University of Auckland Library

This paper shows an understanding of the availability of resources in post-disaster reconstruction and recovery in Christchurch, New Zealand following its September 4, 2010 and February 22, 2011 earthquakes. Overseas experience in recovery demonstrates how delays and additional costs may incur if the availability of resources is not aligned with the reconstruction needs. In the case of reconstruction following Christchurch earthquakes, access to normal resource levels will be insufficient. An on-line questionnaire survey, combined with in-depth interviews was used to collect data from the construction professionals that had been participated in the post-earthquake reconstruction. The study identified the resources that are subject to short supply and resourcing challenges that are currently faced by the construction industry. There was a varied degree of impacts felt by the surveyed organisations from resource shortages. Resource pressures were primarily concentrated on human resources associated with structural, architectural and land issues. The challenges that may continue playing out in the longer-term reconstruction of Christchurch include limited capacity of the construction industry, competition for skills among residential, infrastructure and commercial sectors, and uncertainties with respect to decision making. Findings provide implications informing the ongoing recovery and rebuild in New Zealand. http://www.iiirr.ucalgary.ca/Conference-2012