Broken windows on the old Public Trust Office building on Oxford Terrace have been covered with plastic sheeting.
The dome of the Isaac Theatre Royal, covered in plastic sheeting and suspended in its stage area, awaits restoration.
Shands Emporium standing alone on Hereford Street, the buildings on either side of it demolished. The exposed west side is protected by plastic sheeting.
Volunteers photographed with one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. In the background, Gap Filler's Pallet Pavilion can be seen. The back of the piano has been covered by plastic sheeting with a picture of a dog. A wooden structure has also been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.
Volunteers photographed around one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. A wooden structure has been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.