Search

found 5 results

Images, UC QuakeStudies

Volunteers photographed with one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. In the background, Gap Filler's Pallet Pavilion can be seen. The back of the piano has been covered by plastic sheeting with a picture of a dog. A wooden structure has also been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.

Images, UC QuakeStudies

Volunteers photographed around one of Gap Filler's painted pianos. The piano has been set up at the demolished site of the Crowne Plaza Hotel. A wooden structure has been built around the piano with Perspex and corrugated iron on top and plastic sheeting to the left and right. This is to protect the piano and pianist from wind and rain.