A photograph of plastic sheeting draped over one of the side walls of Café Valentinos on Colombo Street.
A photograph of Speedy Signs and Peaches and Cream on Tuam Street, cordoned off with plastic fencing and police tape.
A photograph of the back of two earthquake-damaged houses on Gloucester Street. The side wall of the house to the right has partially collapsed and the bricks have spilled onto the property to the left. Plastic sheeting has been placed over the roof and the top of the wall to protect against the weather.
A photograph of plastic bags around a chimney of a house in Christchurch. The top of the chimney has broken during the earthquake and made a hole in the roof.
Reinforced concrete buildings that satisfied modern seismic design criteria generally behaved as expected during the recent Canterbury and Kaikoura earthquakes in New Zealand, forming plastic hinges in intended locations. While this meant that life-safety performance objectives were met, widespread demolition and heavy economic losses took place in the aftermath of the earthquakes.The Christchurch central business district was particularly hard hit, with over 60% of the multistorey reinforced concrete buildings being demolished. A lack of knowledge on the post-earthquake residual capacity of reinforced concrete buildings was a contributing factor to the mass demolition.Many aspects related to the assessment of earthquake-damaged reinforced concrete buildings require further research. This thesis focusses on improving the state of knowledge on the post earthquakeresidual capacity and reparability of moderately damaged plastic hinges, with an emphasis on plastic hinges typical of modern moment frame structures. The repair method focussed on is epoxy injection of cracks and patching of spalled concrete. A targeted test program on seventeen nominally identical large-scale ductile reinforced concrete beams, three of which were repaired by epoxy injection following initial damaging loadings, was conducted to support these objectives. Test variables included the loading protocol, the loading rate, and the level of restraint to axial elongation.The information that can be gleaned from post-earthquake damage surveys is investigated. It is shown that residual crack widths are dependent on residual deformations, and are not necessarily indicative of the maximum rotation demands or the plastic hinge residual capacity. The implications of various other types of damage typical of beam and column plastic hinges are also discussed.Experimental data are used to demonstrate that the strength and deformation capacity of plastic hinges with modern seismic detailing are often unreduced as a result of moderate earthquake induced damage, albeit with certain exceptions. Special attention is given to the effects of prior yielding of the longitudinal reinforcement, accounting for the low-cycle fatigue and strain ageing phenomena. A material-level testing program on the low-cycle fatigue behaviour of grade 300E reinforcing steel was conducted to supplement the data available in the literature.A reduction in stiffness, relative to the initial secant stiffness to yield, occurs due to moderate plastic hinging damage. This reduction in stiffness is shown to be correlated with the ductility demand,and a proposed model gives a conservative lower-bound estimate of the residual stiffness following an arbitrary earthquake-type loading. Repair by epoxy injection is shown to be effective in restoring the majority of stiffness to plastic hinges in beams. Epoxy injection is also shown to have implications for the residual strength and elongation characteristics of repaired plastic hinges.
A non-destructive hardness testing method has been developed to investigate the amount of plastic strain demand in steel elements subjected to cyclic loading. The focus of this research is on application to the active links of eccentrically braced frames (EBFs), which are a commonly used seismic-resisting system in modern steel framed buildings. The 2010/2011 Christchurch earthquake series, especially the very intense February 22 shaking, which was the first earthquake worldwide to push complete EBF systems fully into their inelastic state, generating a moderate to high level of plastic strain in EBF active links, for a range of buildings from 3 to 23 storeys in height. This raised two important questions: 1) what was the extent of plastic deformation in active links; and 2) what effect does that have to post-earthquake steel properties? This project comprised determining a robust relationship between hardness and plastic strain in order to be able to answer the first question and provide the necessary input into answering the second question. A non-destructive Leeb (portable) hardness tester (model TH170) has been used to measure the hardness, in order to determine the plastic strain, in hot rolled steel universal sections and steel plates. A bench top Rockwell B was used to compare and validated the hardness measured by the portable hardness tester. Hardness was measured from monotonically strained tensile test specimens to identify the relationship between hardness and plastic strain demand. Test results confirmed a good relationship between hardness and the amount of monotonically induced plastic strain. Surface roughness was identified as an important parameter in obtaining reliable hardness readings from a portable hardness reader. A proper surface preparation method was established by using three different cleaning methods, finished with hand sanding to achieve surface roughness coefficients sufficiently low not to distort the results. This work showed that a test surface roughness (Ra) is not more than 1.6 micron meter (μm) is required for accurate readings from the TH170 tester. A case study on an earthquake affected building was carried out to identify the relationship between hardness and amount of plastic strain demand in cyclically deformed active links. Hardness was carried out from active links shown visually to have been the most affected during one of the major earthquake events. Onsite hardness test results were then compared with laboratory hardness test results. A good relationship between hardness from onsite and laboratory was observed between the test methods; Rockwell B bench top and portable Leeb tester TH170. Manufacturing induced plastic strain in the top and bottom of the webs of hot rolled sections were discovered from this research, an important result which explains why visual effects of earthquake induced active link yielding (eg cracked or flaking paint) was typically more prevalent over the middle half depth of the active link. The extent of this was quantified. It was also evident that the hardness readings from the portable hardness tester are influenced by geometry, mass effects and rigidity of the links. The final experimental stage was application of the method to full scale cyclic inelastic tested nominally identical active links subjected to loading regimes comprising constant and variable plastic strain demands. The links were cyclically loaded to achieve different plastic strain level. A novel Digital Image Correlation (DIC) technique was incorporated during the tests of this scale, to confirm the level of plastic strain achieved. Tensile test specimens were water jet cut from cyclically deformed webs to analyse the level of plastic strain. Test results show clear evidence that cyclically deformed structural steel elements show good correlation between hardness and the amount of plastic strain demand. DIC method was found to be reliable and accurate to check the level of plastic strain within cyclically deformed structural steel elements.
A photograph of large cracks in a footpath near the Kaiapoi River.
A thumbnail photograph of Whole House Reuse item 244, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of Whole House Reuse item 244. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A photograph of a block of earthquake damaged shops on Manchester Street. The front brick wall of the closest shop has crumbled and the bricks have fallen onto the pavement below, taking the awning with them. Plastic fencing has been placed along the street as a cordon.
A photograph of plastic bags and woven twig chains attached to fencing in Victoria Square.
The entrance to Sol Square on Colombo Street, barred off with wire fencing and plastic walls.
A plastic bin of wiring and electrical parts sits on a concrete block in Cashel Mall.
A photograph of the Edmonds Clock on Oxford Terrace, protected with plastic wrapping and steel braces.
A photograph of the Edmonds Clock on Oxford Terrace, protected with plastic wrapping and steel braces.
A photograph of the Edmonds Clock on Oxford Terrace, protected with plastic wrapping and steel braces.
A photograph of the Edmonds Clock on Oxford Terrace, protected with plastic wrapping and steel braces.
A photograph of the Edmonds Clock on Oxford Terrace, protected with plastic wrapping and steel braces.
A photograph of Whole House Reuse item 360. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A thumbnail photograph of Whole House Reuse item 360, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
Members of the Navy loading crates of bread and plastic cups onto a truck in Lyttelton Harbour.
A plastic crate that will be used to hold plants, or as seating at the Pallet Pavilion.
A plastic crate that will be used to hold plants, or as seating at the Pallet Pavilion.
Broken windows on the old Public Trust Office building on Oxford Terrace have been covered with plastic sheeting.
A photograph of plastic bags, woven twig chains and other knick-knacks attached to fencing in Victoria Square.
Residents filling plastic containers with water as many people have been left without water since the February earthquake.
Residents filling plastic containers with water as many people have been left without water since the February earthquake.
Emergency personnel using a sheet of corrugated plastic to slide pieces of rubble of the collapsed Canterbury Television Building.
A braced chimney on a house in Cashmere which has also been waterproofed with tarpaulins, plastic sheeting and blankets.
A photograph of a manikin wearing a Southern Demolition hard hat and holding a knife and a plastic container.