Search

found 20 results

Images, UC QuakeStudies

A photograph of the earthquake damage to the concrete beams in a room in the PricewaterhouseCoopers Building. Sections of the concrete have crumbled to reveal the steel reinforcement underneath. A number of the ceiling panels are missing and another is hanging loose. Some of the bars that hold the ceiling panels are also hanging loose.

Research papers, The University of Auckland Library

The Christchurch region of New Zealand experienced a series of major earthquakes and aftershocks between September 2010 and June 2011 which caused severe damage to the city’s infrastructure. The performance of tilt-up precast concrete buildings was investigated and initial observations are presented here. In general, tilt-up buildings performed well during all three major earthquakes, with mostly only minor, repairable damage occurring. For the in-plane loading direction, both loadbearing and cladding panels behaved exceptionally well, with no significant damage or failure observed in panels and their connections. A limited number of connection failures occurred due to large out-of-plane panel inertia forces. In several buildings, the connections between the panel and the internal structural frame appeared to be the weakest link, lacking in both strength and ductility. This weakness in the out-of-plane load path should be prevented in future designs.

Images, UC QuakeStudies

A photograph of the entrance of the Crowne Plaza Hotel taken from inside the hotel. The front windows have smashed, the glass scattering across the courtyard and foyer. Sections of the ceiling have collapsed, the panels fallen onto the floor in front of the rotating doors.