Search

found 7 results

Images, UC QuakeStudies

A large crack in the concrete floor slab of a building in Barbadoes Street. The photographer comments, "This is a picture of the cracked concrete floor in a shop in the Christchurch CBD. I have a similar crack in my home, but I have not lifted the carpet to look".

Audio, Radio New Zealand

Nat's been working on Earthquake relief in Christchurch with the development of the Christchurch Recovery Map and when not doing that, he's been looking at the iPad II, 3D Printers for schools, anti-lasers and other cutting edge tech.

Audio, Radio New Zealand

A review of the week's news including: Labour struggling to put a dent in the National Party's lead in the polls, questions over Israelis caught up in the Christchurch earthquake, the latest from the Pike River Mine inquiry, electricity price rises fuelling inflation, an Auckland school wanting all students to take an iPad to class and Steve Williams dropped as Tiger Wood's caddy.

Images, eqnz.chch.2010

AMI Stadium (Lancaster Park), not used since the February 2011 earthquake. It was used predominantly for rugby and cricket. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired. The concrete pad lower left is ...

Audio, Radio New Zealand

A review of the week's news including... a two billion dollar pay equity settlement, the Government announces changes it says are aimed at improving the quality of immigrants and controlling the quantity, irresponsible, unsafe, and unethical -- that's how a new Netflix series aimed at teenagers is being described, the top family court judge fires back at criticisms levelled at the court system by a new women's advocacy group, the Prime Minister who oversaw the dramatic undermining of unions now says unions have probably become too small, a review of Mental Health Services finds they are under pressure, under resourced and not widely understood, the Air Force's NH90 helicopters have been all but grounded, an eight-year-old girl is pulled alive from Manukau Harbour after treading water for more than two hours, the conversion of thousands of hectares of the Mackenzie Basin to dairy farms has been halted, tampons and sanitary pads will not be subsidised for all women by Pharmac, the government department set up to make the economy bigger isn't sure it can reach the goals it set for itself, Central Christchurch residents say they're under siege from sex workers and are threatening legal action, the massive Kaikoura earthquake may have saved the town from having to spend millions of dollars and the largest multi-sport event in the world has arrived in Auckland.

Research papers, University of Canterbury Library

This thesis presents the findings from an experimental programme to determine the performance and behaviour of an integrated building incorporating low damage structural and non-structural systems. The systems investigated included post-tensioned rocking concrete frames, articulated floor solutions, low damage claddings and low damage partition systems. As part of a more general aim to increase the resilience of society against earthquake hazards, more emphasis has been given to damage-control design approaches in research. Multiple low-damage earthquake resistant structural and non-structural systems have emerged that are able to withstand high levels of drift or deflections will little or negligible residual. Dry jointed connections, articulated floor solutions, low damage cladding systems and low damage drywall partitions have all been developed separately and successfully tested. In spite of the extensive research effort and the adoption in practice of the low damage systems, work was required to integrate the systems within one building and verify the constructibility, behaviour and performance of the integrated systems. The objectives of this research were to perform dynamic experimental testing of a building which incorporated the low damage systems and acquire data which could be used to dynamically validate numerical models for each of the systems. A three phase experimental programme was devised and performed to dynamically test a half-scale two storey reinforced concrete building on the University of Canterbury shaking table. The three phases of the programme investigated: The structural system only. The rocking connections were tested as Post-Tensioned only connections and Hybrid connections (including dissipators). Two different articulated floor connections were also investigated. Non-structural systems. The Hybrid building was tested with each non-structural system separately; including low damage claddings, low damage partitions and traditional partitions. The Complete building was tested with Hybrid connections, low damage claddings and low damage partitions all integrated within the test specimen. The building was designed based on a full scale prototype building following the direct displacement based design to reach a peak inter-storey drift of 1.6% in a 1/500 year ground motion for a Wellington site. For each test set up, the test specimen was subjected to a ground motion sequence of 39 single direction ground motions. Through the sequence, both the local and global behaviours of the building and integrated systems were recorded in real time. The test specimen was subjected to over 400 ground motions throughout the testing programme. It sustained no significant damage that required reparations other than crumbling of the grout pads. The average peak inter-storey drifts of the buildings were lower than the design value of 1.6%. The low damage non-structural elements were undamaged in the ground motion sequence. The data acquired from each of the phases was used to successfully validate numerical models for each of the low damage systems included in the research.