12d Model SCIRT Standards
Articles, UC QuakeStudies
A document which sets out the 12d standards at SCIRT.
A document which sets out the 12d standards at SCIRT.
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
An example of a SCIRT safety alert. Safety alerts were sent out to Delivery Team Health and Safety representatives after an incident who then sent or delivered them to subcontractors.