
This is how the building looked when it was built - fine indeed! democam.iopen.co.nz/ An engineer who owns a similar building in Dunedin, and is willing to put money into this building's restoration, is sure it could be stabilised, just like the Railway Clock Tower. And the t...
A press release from the United States Embassy New Zealand about the US-NZ Partnership Forum which was interrupted by the 22 February 2011 earthquake in Christchurch. Two months later, delegates from both New Zealand and the United States met in a video conference session designed to conclude the forum.
A digital copy of a pen and ink and watercolour painting by Raymond Morris, titled, 'NZ Express Co. building'.
A submission produced by the consultancies for the ACENZ Innovate NZ Awards of Excellence 2016, providing details about how the design team supporting SCIRT was formed, and how successful design delivery was achieved.
Photograph captioned by BeckerFraserPhotos, "Radio NZ, Durham Street".
Photograph captioned by BeckerFraserPhotos, "A confusing plethora of signs".
An entry from Sue Davidson's blog for 4 February 2014 entitled, "NZ Sandcastle Competition".
A video about the New Zealand Army's delivery of chemical toilets to Christchurch residents without plumbing.
A photograph showing painted out sign with the words "N.Z. NATIONAL".
Aftermath of September 4th Earthquake in Christchurch, NZ. Footbridge over Avon river
Members of the NZ Army and Police at the Operation Earthquake Task Force Headquarters.
NZ Army personnel managing traffic on Moorhouse Avenue after the 22 February 2011 earthquake.
Aftermath of September 4th Earthquake in Canterbury NZ. Bridge Street, South Brighton, Christchurch.
Aftermath of September 4th Earthquake in Canterbury, NZ. Footbridge over Avon river, Christchurch
Aftermath of September 4th Earthquake in Canterbury NZ. Bridge Street, South Brighton, Christchurch.
A post on the NZ Raw blog written by Mark Lincoln on 4 March 2011.
A post on the NZ Raw blog written by Mark Lincoln on 4 September 2010. Mark says, "This is the first [blog post] I wrote on 4th Sept. I always remember an announcer on the radio having the first on-air interview with Geonet/EQC (obviously only 1 or 2 staff members at that stage!). The announcer asked if the aftershocks would carry on for much longer and the Geonet guy said they could carry on for a few weeks. Radio announcer seemed shocked".
A post on the NZ Raw blog written by Mark Lincoln on 3 March 2011. Mark says, "Sydenham Church - this is the one that was demolished and then suddenly everyone started asking why it was demolished - somewhere along the line there was a communication error and a demolition company knocked down the church without speaking to the Heritage Trust".
The level of destruction from the 2011 Christchurch earthquakes led to changes in the New Zealand seismic building code. The destruction showed that the NZ building codes did not fully performed to expectation and needed Improvement to ensure that impact of future earthquakes would be minimised. The building codes have been amended to improve buildings resilience to earthquake and other related extreme loading conditions. Rebuilding Christchurch with the new modifications in the seismic building code comes with its own unique challenges to the entire system. This project investigates the impact of rebuilding Christchurch with the new seismic Building codes in terms of how the new changes affected the building industry and the management of construction.
A post on the NZ Raw blog written by Mark Lincoln on 23 July 2011.
A post on the NZ Raw blog written by Mark Lincoln on 6 November 2011.
Aftermath of September 4th Earthquake in Canterbury NZ. Storm drains - Lower Styx Road, Brooklands.
A photograph of a detail of a military armoured vehicle parked on the site of a demolished building.
A photograph of a detail of a military armoured vehicle parked on the site of a demolished building.
A photograph of a detail of a military armoured vehicle parked on the site of a demolished building.
A photograph of a detail of a military armoured vehicle parked on the site of a demolished building.
A photograph of a detail of a military armoured vehicle parked on the site of a demolished building.
NZ Army medics arriving outside the PGC Building in Christchurch after the 22 February 2011 earthquake.
Aftermath of September 4th Earthquake in Canterbury, NZ. Damage to road alongside Avon River, Christchurch.
Aftermath of September 4th Earthquake in Canterbury, NZ. Damage to roads alongside Avon river, Christchurch.