Friday 22 February 2013. File reference: CCL-2013 -02-22-IMG_4026 From the collection of Christchurch City Libraries.
Scaffolding surrounds the Bank of New Zealand building, Cathedral Square.
Scaffolding supporting the McKenzie and Willis building. A New Zealand flag still flies from the flagpole above the damaged building.
A photograph of the new Press building and shipping containers supporting the facade of the Isaac Theatre Royal on Gloucester Street.
A photograph of the new Press building and shipping containers supporting the facade of the Isaac Theatre Royal on Gloucester Street.
Cars parked outside two new buildings on Norwich Quay in Lyttelton. Advertisements for fencing companies hang on security fences that surround the buildings.
The partially demolished BNZ building on Armargh Street, seen from New Regent Street.
An aerial photograph of new rowing club buildings along the Avon River in Wainoni.
The outdoor seating area of C1 Expresso's new location in the Alice in Videoland building.
An aerial photograph of Kilmore Street with a new medical facility under construction.
A new building under construction on Kilmore Street. A sign reading, 'Danger keep out' has been placed on the security fence.
The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand. While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible. Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...
A woman and her dog in the outdoor seating area of C1 Expresso's new location in the Alice in Videoland building.
People wait for buses at the new Bus Exchange between Lichfield and Tuam Streets. In the background is the temporary Central Library building.
A photograph of a window of the IRD building. Directions to a rear entrance have been written on the window.
On a walk around the neighbourhood, December 3, 2013, Christchurch New Zealand. www.stuff.co.nz/the-press/christchurch-life/avenues/featu...
Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...
What I found on a walk around the city Christchurch November 20, 2013 New Zealand. www.isaactheatreroyal.co.nz/ en.wikipedia.org/wiki/2011_Christchurch_earthquake
The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for the case of adhesive anchor connections than for the case of through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragm. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal foil sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes and a snapshot of the performed experimental program and the test results are presented herein. http://hdl.handle.net/2292/21050