Search

found 20 results

Images, UC QuakeStudies

A photograph of Jonathan Hall transferring Crack'd for Christchurch's ottoman artwork onto a wooden base in Helen Campbell's garage. The ottoman has been made out of polystyrene, wood, mesh, and concrete, laid over a steel frame.Crack'd for Christchurch comments, "December 2013. Jonathan delivers the footstool to Helen's garage where it will be mosaicked.."

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have attached to the front legs.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.

Images, UC QuakeStudies

A photograph of Crack'd for Christchurch's partially-constructed armchair artwork. The armchair is on a pallet in Greening the Rubble's workshop. Jonathan Hall has moulded polystyrene, wood, mesh, and concrete over the steel frame to construct the armchair. Two cast-iron bath feet have been attached to the front legs.

Images, UC QuakeStudies

A photograph of the steel frame of Crack'd for Christchurch's armchair artwork. The frame is on a pallet in the Greening the Rubble workshop. Two cast-iron bath feet have been attached to the front legs. The bottom half of the frame has been covered with mesh, wood, polystyrene, and concrete by Jonathan Hall.

Images, UC QuakeStudies

A photograph of a group of tents set up in Latimer Square next to the Singapore Rescue Team's store and equipment area. Plastic mesh and tape has been placed around the tents as a fence. The tents were used as temporary accommodation for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of a workstation in Crack'd for Christchurch's workshop. The workstation includes pieces of broken china, a pair of cutters for breaking up china, a plastic container to hold china pieces, and two mosaic plans. One of the plans has a piece of mesh laid over the top. The other is being used to lay out the mosaic.Crack'd for Christchurch comments, "Marie begins the very first flower. It is so difficult and time consuming that we are all in despair. Will this take forever? No-one is getting paid and we all have jobs and lives in some chaos thanks to the earthquakes."

Images, UC QuakeStudies

A photograph of a half-finished flower mosaic. The mosaic has been made out of pieces of broken china which have been laid over a paper design. Mesh has also been placed over the design so that it can be transferred easily to Crack's for Christchurch's concrete chair. Other pieces of china are scattered around the mosaic.Crack'd for Christchurch comments, "Marie begins the very first flower. It is so difficult and time consuming that we are all in despair. Will this take forever? No-one is getting paid and we all have jobs and lives in some chaos thanks to the earthquakes."

Images, UC QuakeStudies

A photograph of members of Crack'd for Christchurch working in their workshop. A number of mosaics of flowers and leaves have been laid out on the table in front of them. Boxes of broken china are organised on the shelf behind.Crack'd for Christchurch comments, "Back at the workshop, flower making continues. You can see a table covered with flower motifs, looking amazing. We had to make the flowers at home in the evenings as we all worked during the day. After much trial and error our flower experts (Helen, Sharon, and Jennie) came up with a clever way to attach the tiny pieces to mesh, so they could be transferred to the chair easily. From left: Sharon Wilson, Helen Campbell, and Shirley Walden."

Research papers, The University of Auckland Library

This thesis is a creative and critical exploration of how transmedia storytelling meshes with political documentary’s nature of representing social realities and goals to educate and promote social change. I explore this notion through Obrero (“worker”), my independently produced transmedia and transjournalistic documentary project that explores the conditions and context of the Filipino rebuild workers who migrated to Christchurch, New Zealand after the earthquake in 2011. While the project should appeal to New Zealanders, it is specifically targeted at an audience from the Philippines. Obrero began as a film festival documentary that co-exists with strategically refashioned Web 2.0 variants, a social network documentary and an interactive documentary (i-doc). Using data derived from the production and circulation of Obrero, I interrogate how the documentary’s variants engage with differing audiences and assess the extent to which this engagement might be effective. This thesis argues that contemporary documentary needs to re-negotiate established film aesthetics and practices to adapt in the current period of shifting technologies and fragmented audiences. Documentary’s migration to new media platforms also creates a demand for filmmakers to work with a transmedia state of mind—that is, the capacity to practise the old canons of documentary making while comfortably adjusting to new media production praxis, ethics, and aesthetics. Then Obrero itself, as the creative component of this thesis, becomes an instance of research through creative practice. It does so in two respects: adding new knowledge about the context, politics, and experiences of the Filipino workers in New Zealand; and offering up a broader model for documentary engagement, which I analyse for its efficacy in the digital age.

Research papers, University of Canterbury Library

We present initial results from a set of three-dimensional (3D) deterministic earthquake ground motion simulations for the northern Canterbury plains, Christchurch and the Banks Peninsula region, which explicitly incorporate the effects of the surface topography. The simu-lations are done using Hercules, an octree-based finite-element parallel software for solving 3D seismic wave propagation problems in heterogeneous media under kinematic faulting. We describe the efforts undertaken to couple Hercules with the South Island Velocity Model (SIVM), which included changes to the SIVM code in order to allow for single repetitive que-ries and thus achieve a seamless finite-element meshing process within the end-to-end ap-proach adopted in Hercules. We present our selection of the region of interest, which corre-sponds to an area of about 120 km × 120 km, with the 3D model reaching a depth of 60 km. Initial simulation parameters are set for relatively high minimum shear wave velocity and a low maximum frequency, which we are progressively scaling up as computing resources permit. While the effects of topography are typically more important at higher frequencies and low seismic velocities, even at this initial stage of our efforts (with a maximum of 2 Hz and a mini-mum of 500 m/s), it is possible to observe the importance of the topography in the response of some key locations within our model. To highlight these effects we compare the results of the 3D topographic model with respect to those of a flat (squashed) 3D model. We draw rele-vant conclusions from the study of topographic effects during earthquakes for this region and describe our plans for future work.

Research papers, The University of Auckland Library

The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand, earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for adhesive anchor connections than for through-bolt connections (i.e., anchorages having plates on the exterior facade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragm. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation, and the use of metal mesh sleeves. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5° to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes, a summary of the performed experimental program and test results, and a proposed pull-out capacity relationship for adhesive anchors installed into multi-leaf clay brick masonry are presented herein. AM - Accepted Manuscript

Research papers, The University of Auckland Library

The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for adhesive anchor connections than for through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragms. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal mesh sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes, a snapshot of the performed experimental program and the test results and a preliminary proposed pull-out capacity of adhesive anchors are presented herein.

Research papers, The University of Auckland Library

The connections between walls of unreinforced masonry (URM) buildings and flexible timber diaphragms are critical building components that must perform adequately before desirable earthquake response of URM buildings may be achieved. Field observations made during the initial reconnaissance and the subsequent damage surveys of clay brick URM buildings following the 2010/2011 Canterbury, New Zealand earthquakes revealed numerous cases where anchor connections joining masonry walls or parapets with roof or floor diaphragms appeared to have failed prematurely. These observations were more frequent for adhesive anchor connections than for through-bolt connections (i.e. anchorages having plates on the exterior façade of the masonry walls). Subsequently, an in-field test program was undertaken in an attempt to evaluate the performance of adhesive anchor connections between unreinforced clay brick URM walls and roof or floor diaphragm. The study consisted of a total of almost 400 anchor tests conducted in eleven existing URM buildings located in Christchurch, Whanganui and Auckland. Specific objectives of the study included the identification of failure modes of adhesive anchors in existing URM walls and the influence of the following variables on anchor load-displacement response: adhesive type, strength of the masonry materials (brick and mortar), anchor embedment depth, anchor rod diameter, overburden level, anchor rod type, quality of installation and the use of metal mesh sleeve. In addition, the comparative performance of bent anchors (installed at an angle of minimum 22.5o to the perpendicular projection from the wall surface) and anchors positioned horizontally was investigated. Observations on the performance of wall-to-diaphragm connections in the 2010/2011 Canterbury earthquakes, a snapshot of the performed experimental program and the test results and a preliminary proposed pull-out capacity of adhesive anchors are presented herein. http://www.confer.co.nz/nzsee/ VoR - Version of Record