Search

found 26 results

Articles, Christchurch uncovered

Did you ever wonder where the concept of locking things up came from? The reality of human nature seems to be that ever since people have owned things that are deemed valuable, they need to be protected from theft. Not … Continue reading →

Images, UC QuakeStudies

A photograph of Pasifika House at the University of Canterbury. The house has a damaged chimney. A sign on the door reads, "The University is on emergency lock down. This includes the fale. Please do not enter.

Images, UC QuakeStudies

A photograph of Pasifika House at the University of Canterbury. The house has a damaged chimney. A sign on the door reads, "The University is on emergency lock down. This includes the fale. Please do not enter.

Images, UC QuakeStudies

A photograph of Pasifika House at the University of Canterbury. The house has a damaged chimney. A sign on the door reads, "The University is on emergency lock down. This includes the fale. Please do not enter.

Images, Canterbury Museum

One green plastic Port-A-Loo door with surround, lock and mirror on interior; Port-A-Loo logo on front. One of the most immediate challenges facing Christchurch residents following the 22 February 2011 earthquake was the restriction on using residential toilet facilities. The restrictions were implemented due to the extensive damage to sewerage...

Images, eqnz.chch.2010

The Old Lyttelton Post Office, opened in 1874, showing damage after a series of earthquakes hit Christchurch and Lyttelton over the last 9 months. In the shadow of a broken house, Down a deserted street, Propt walls, cold hearths, and phantom stairs, And the silence of dead feet — Locked wildly in one another's arms I saw two lovers meet. ...

Images, Alexander Turnbull Library

Text above reads 'Central Christchurch business owners protest' and the words 'Cordon Blur' (wordplay on famous cookery schools 'Cordon Bleu' and 'blur' as in 'unclear'). The cartoon shows a striped barrier bearing the words 'KEEP OUT' that is being torn to pieces. A second version continues the text to read 'Central Christchurch business owners protest as future directions unclear'. Context - Protests from angry Christchurch business owners locked out of the damaged CBD have intensified today, with police physically intervening when several protesters went inside the cordon. They are worried about the state of their businesses inside the red zone, and say they have not been allowed in to collect critical records and basic tools so they can carry on working outside the cordon. (NZ Herald 21 March 2011) Quantity: 2 digital cartoon(s).

Audio, Radio New Zealand

A Christchurch couple locked in an ongoing legal battle with state-owned quake insurer Southern Response says it is sobering for a Court of Appeal decision to go their way, one decade on from the harrowing earthquakes. An earlier High Court decision found Southern Response guilty of misleading and deceptive behaviour when it short-changed Karl and Alison Dodds tens of thousands of dollars after their quake damaged house was written off. The Dodds say they were tricked into accepting a lower offer from Southern Response only to later discover the insurer had kept secret from them a second higher estimate to rebuild their damaged house, a so-called second secret detailed repair and rebuild analysis (DRA). The High Court ordered Southern Response to pay the Dodds almost $180,000 in damages, plus costs. But the government appealed the decision, saying it needed clarity, because of the thousands of similar cases it could be liable for. The Court of Appeal reduced the damages Southern Response has to pay $10,656.44 due to an earlier error in calculations. The Minister responsible Grant Robertson has declined to be interviewed. Southern Response also declined to be interviewed. Neither have ruled out appealing the decision in the Supreme Court.

Articles, UC QuakeStudies

A document that defines the requirements and objectives of design activities for SCIRT's reconstruction of the city's horizontal infrastructure and describes how these activities should be implemented.

Research papers, University of Canterbury Library

The increase of the world's population located near areas prone to natural disasters has given rise to new ‘mega risks’; the rebuild after disasters will test the governments’ capabilities to provide appropriate responses to protect the people and businesses. During the aftermath of the Christchurch earthquakes (2010-2012) that destroyed much of the inner city, the government of New Zealand set up a new partnership between the public and private sector to rebuild the city’s infrastructure. The new alliance, called SCIRT, used traditional risk management methods in the many construction projects. And, in hindsight, this was seen as one of the causes for some of the unanticipated problems. This study investigated the risk management practices in the post-disaster recovery to produce a specific risk management model that can be used effectively during future post-disaster situations. The aim was to develop a risk management guideline for more integrated risk management and fill the gap that arises when the traditional risk management framework is used in post-disaster situations. The study used the SCIRT alliance as a case study. The findings of the study are based on time and financial data from 100 rebuild projects, and from surveying and interviewing risk management professionals connected to the infrastructure recovery programme. The study focussed on post-disaster risk management in construction as a whole. It took into consideration the changes that happened to the people, the work and the environment due to the disaster. System thinking, and system dynamics techniques have been used due to the complexity of the recovery and to minimise the effect of unforeseen consequences. Based on an extensive literature review, the following methods were used to produce the model. The analytical hierarchical process and the relative importance index have been used to identify the critical risks inside the recovery project. System theory methods and quantitative graph theory have been used to investigate the dynamics of risks between the different management levels. Qualitative comparative analysis has been used to explore the critical success factors. And finally, causal loop diagrams combined with the grounded theory approach has been used to develop the model itself. The study identified that inexperienced staff, low management competency, poor communication, scope uncertainty, and non-alignment of the timing of strategic decisions with schedule demands, were the key risk factors in recovery projects. Among the critical risk groups, it was found that at a strategic management level, financial risks attracted the highest level of interest, as the client needs to secure funding. At both alliance-management and alliance-execution levels, the safety and environmental risks were given top priority due to a combination of high levels of emotional, reputational and media stresses. Risks arising from a lack of resources combined with the high volume of work and the concern that the cost could go out of control, alongside the aforementioned funding issues encouraged the client to create the recovery alliance model with large reputable construction organisations to lock in the recovery cost, at a time when the scope was still uncertain. This study found that building trust between all parties, clearer communication and a constant interactive flow of information, established a more working environment. Competent and clear allocation of risk management responsibilities, cultural shift, risk prioritisation, and staff training were crucial factors. Finally, the post-disaster risk management (PDRM) model can be described as an integrated risk management model that considers how the changes which happened to the environment, the people and their work, caused them to think differently to ease the complexity of the recovery projects. The model should be used as a guideline for recovery systems, especially after an earthquake, looking in detail at all the attributes and the concepts, which influence the risk management for more effective PDRM. The PDRM model is represented in Causal Loops Diagrams (CLD) in Figure 8.31 and based on 10 principles (Figure 8.32) and 26 concepts (Table 8.1) with its attributes.