An article published in the August/September 2015 issue of BRANZ Build magazine. It summarises SCIRT's approach to innovation management and suggests some areas for improvement.
This thesis describes the management process of innovation through construction infrastructure projects. This research focuses on the innovation management process at the project level from four views. These are categorised into the separate yet related areas of: “innovation definition”, “Project time”, “project team motivation” and “Project temporary organisation”. A practical knowledge is developed for each of these research areas that enables project practitioners to make the best decision for the right type of innovation at the right phase of projects, through a capable project organisation. The research developed a holistic view on both innovation and the construction infrastructure project as two complex phenomena. An infrastructure project is a long-term capital investment, highly risky and an uncertain. Infrastructure projects can play a key role in innovation and performance improvement throughout the construction industry. The delivery of an infrastructure project is affected in most cases by critical issues of budget constraint, programme delays and safety Where the business climate is characterized by uncertainty, risk and a high level of technological change, construction infrastructure projects are unable to cope with the requirement to develop innovation. Innovation in infrastructure projects, as one of the key performance indicators (KPI) has been identified as a critical capability for performance improvement through the industry. However, in spite of the importance of infrastructure projects in improving innovation, there are a few research efforts that have developed a comprehensive view on the project context and its drivers and inhibitors for innovation in the construction industry. Two main reasons are given as the inhibitors through the process of comprehensive research on innovation management in construction. The first reason is the absence of an understanding of innovation itself. The second is a bias towards research at a firm and individual level, so a comprehensive assessment of project-related factors and their effects on innovation in infrastructure projects has not been undertaken. This study overcomes these issues by adopting as a case study approach of a successful infrastructure project. This research examines more than 500 construction innovations generated by a unique infrastructure alliance. SCIRT (Stronger Christchurch Infrastructure Rebuild Team) is a temporary alliancing organisation that was created to rebuild and recover the damaged infrastructure after the Christchurch 2011 earthquake. Researchers were given full access to the innovation project information and innovation systems under a contract with SCIRT Learning Legacy, provided the research with material which is critical for understanding innovations in large, complex alliancing infrastructure organisation. In this research, an innovation classification model was first constructed. Clear definitions have been developed for six types of construction innovation with a variety of level of novelties and benefits. The innovation classification model was applied on the SCIRT innovation database and the resultant trends and behaviours of different types of innovation are presented. The trends and behaviours through different types of SCIRT innovations developed a unique opportunity to research the projectrelated factors and their effect on the behaviour of different classified types of innovation throughout the project’s lifecycle. The result was the identification of specific characteristics of an infrastructure project that affect the innovation management process at the project level. These were categorised in four separate chapters. The first study presents the relationship between six classified types of innovation, the level of novelty and the benefit they come up with, by applying the innovation classification model on SCIRT innovation database. The second study focused on the innovation potential and limitations in different project lifecycle phases by using a logic relationship between the six classified types of innovation and the three classified phases of the SCIRT project. The third study result develops a holistic view of different elements of the SCIRT motivation system and results in a relationship between the maturity level of definition developed for innovation as one of the KPIs and a desire though the SCIRT innovation incentive system to motivate more important innovations throughout the project. The fourth study is about the role of the project’s temporary organisation that finally results in a multiple-view innovation model being developed for project organisation capability assessment in the construction industry. The result of this thesis provides practical and instrumental knowledge to be used by a project practitioner. Benefits of the current thesis could be categorized in four groups. The first group is the innovation classification model that provides a clear definition for six classified types of innovation with four levels of novelty and specifically defined outcomes and the relationship between the innovation types, novelty and benefit. The second is the ability that is provided for the project practitioner to make the best decision for the right type of innovation at the right phases of a project’s lifecycle. The third is an optimisation that is applied on the SCIRT innovation motivation system that enables the project practitioner to incentivize the right type of innovation with the right level of financial gain. This drives the project teams to develop a more important innovation instead of a simple problemsolving one. Finally, the last and probably more important benefit is the recommended multiple-view innovation model. This is a tool that could be used by a project practitioner in order to empower the project team to support innovation throughout the project.
A report created by the University of Canterbury Quake Centre and the University of Auckland, funded by the Building Research Levy. It shows how an innovation process was initiated and managed throughout the rebuilding of the horizontal infrastructure after the Canterbury earthquakes.
The Canterbury earthquakes destroyed the Christchurch CBD and caused massive disruption to business across the region. There was an urgent need to support business survival and foster economic recovery. Recover Canterbury is a hub providing seamless support for businesses affected by the earthquakes, giving them easy access to government and commercial expertise in a one-stop shop.
A document containing examples of the technical update newsletter which detailed SCIRT innovations. The newsletters in the document were produced between 1 July 2013 and 1 May 2014.
A copy of the minutes from a meeting between the Ministry of Business, Innovation and Employment (MBIE), and several Christchurch residents' groups, held on 20 June 2013.
A copy of the transcript of a meeting between the Ministry of Business, Innovation and Employment (MBIE), and several Christchurch residents' groups, held on 20 June 2013.
An audio recording of a meeting between the Ministry of Business, Innovation and Employment (MBIE), and several Christchurch residents' groups, held on 20 June 2013.
A paper delivered at Building a Better New Zealand (BBNZ 2014) Conference. The paper examines the relationship between innovation and productivity improvement in the construction industry.
A pdf copy of a presentation delivered at Building a Better New Zealand (BBNZ 2014) Conference. The presentation examines the relationship between innovation and productivity improvement in the construction industry.
The new EPIC Innovation Centre on the corner of Tuam and Manchester Streets.
A pdf copy of a PowerPoint presentation which illustrates the locations where Duncan Gibb presented his Brunel lecture.
A document made available to people attending Duncan Gibb's Brunel lecture.
A pdf copy of a PowerPoint presentation used by Duncan Gibb when presenting his Brunel lecture.
A document which summarises each winning Bill Perry Safety Award submission.
A document which outlines several of Drain Surgeons' safety initiatives; developed when carrying out CCTV operations.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A document which describes the purpose of the Bill Perry Safety Awards and outlines each winning submission.
A document which explains the rationale behind and development of City Care's Good to Go safety video.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.
A design guideline which defined the role of the technical forums within SCIRT.
A design guideline which defined the role of the Technical Leads within SCIRT technical forums.
A photograph of the side of the McKenzie & Willis building, seen from Tuam Street.
A report created by BRANZ, the University of Auckland and Constructing Excellence New Zealand which was commissioned by the Productivity Partnership. It examines the use of KPIs by a number of rebuild organisations.
A photograph of the east side of the Odeon Theatre, showing the severe damage at the back of the theatre.
A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
A copy of a document from Empowered Christchurch which was sent to Queen Elizabeth. The document consists of a letter from Empowered Christchurch to Douglas Martin, Crown Manager from the Christchurch City Council, and Official Information Act requests sent to Building and Construction Minister Maurice Williamson and Canterbury Earthquake Recovery Minister Gerry Brownlee. It also includes an appeal to the Queen on behalf of Christchurch residents with badly-damaged houses. Please note that a letter from the Ministry of Business, Innovation and Employment, which was originally included in the document, has been removed due to copyright issues.