A news item titled, "Oxford Street Bridge Repaired", published on the Lyttelton Harbour Information Centre's website on Thursday, 29 September 2011.
An entry from Ruth Gardner's blog for 19 May 2012 entitled, "Road Repairs".
An infographic listing statistics about infrastructure repairs.
Underground infrastructure being repaired on Avonside Drive.
A graphic showing the cost of infrastructure repairs across the city.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
Extensive repairs being made to the sewerage infrastructure on Avonside Drive.
A document containing photographs of SCIRT's Armagh Street bridge repairs.
A video which describes the history of the bridge and SCIRT's repair methodology.
A public relations flyer which outlines the repairs undertaken on the Gloucester Street bridge.
A document which details Downer's approach to heritage management when repairing the Armagh Street bridge.
A document which describes the processes that SCIRT took when repairing some of Christchurch's heritage bridges.
An award application for the Civil Contractors NZ Hirepool Construction Excellence Awards 2015 which details Downer's approach to repairing the Armagh Street bridge.
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
A report which details the archaeological monitoring carried out during the course of SCIRT project 11136, repairs to the Gloucester Street bridge.
A map showing infrastructure repairs to be carried out in Christchurch and surrounding areas.
An award application submitted for the IPWEA Annual Excellence Awards 2016, detailing Fulton Hogan's work repairing the repair methodology for the Sumner Road retaining wall - stage 4.
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A brochure created for Beca Heritage Week 2014, outlining SCIRT's repair work on heritage structures in the Central City. It was handed out to members of the public at SCIRT's walk and talk tours.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
A guideline created for SCIRT Delivery Teams which outlines the requirements for working around heritage items.
A run sheet which details who will do what at the opening of the Gloucester Street bridge.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.