Horizontal Infrastructure Governance - Client Governance Group
Articles, UC QuakeStudies
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A document which details the structure, roles and terms of reference for the Client Governance Group (CGG).
A document which details the agreement in September 2013 between the Government and the Christchurch City Council over governance of the horizontal infrastructure rebuild.
A manual which informs SCIRT AutoCAD users of all tools, utilities, keyboard shortcuts, and tips available within the SCIRT CAD System.
A design guideline which provides guidance to designers on how to carry out a whole of life evaluation of rebuild options.
A manual which provides SCIRT AutoCAD users with general guidance about how to use AutoCAD.
A designer's guideline which explains the role of Technical Leads at SCIRT.
A report which details the findings of a performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A plan which details how in 2013 SCIRT planned to engage its workforce in training.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A document which contains a set of procedures for the "best practice" mark out and recording of subsurface utilities.
A copy of the award application for the New Zealand Engineering Excellence Awards 2013.
This document describes the tool developed for capturing the abandoned and removed assets using the SCIRT GIS viewer.
An example of a tool SCIRT has used to communicate its projects to the business community.
A guideline created for SCIRT Delivery Teams which outlines the requirements for working around heritage items.
A plan which describes the framework, principles and process for determining project prioritisation and the sequence in which those projects are carried out. The first version of this plan was produced on 23 September 2011.
A design guideline which provides information about how to use the SCIRT Asset Assessment Spreadsheet.
A poster which outlines the dewatering process.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards and assessments of the survey results.
A design guideline which provides guidance to project definition and design teams on how to use Pipe Damage Assessment Tool (PDAT) outputs in their scoping and concept design work.