Search

found 4 results

Images, UC QuakeStudies

A digitally manipulated image of a excavator claw tangled with reinforcing cable, with a damaged concrete building in the background. The photographer comments, "The monster destroying the earthquake broken buildings close to the Lyttelton tunnel".

Audio, Radio New Zealand

Shift to quake recovery operation devastating for survivor;Brother of missing woman speaks out;Police say end of rescue effort sad day for all concerned;Other families trying to come to grips with rescue's end;Hundreds struggle on with life inside Christchurch cordon;Christ's College spared from large scale damage;Gang patches can return - Hells Angels lawyer;Botany to elect new MP tomorrow;Earthquake Minister on shift to recovery operation.

Research papers, University of Canterbury Library

In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.