Search

found 12 results

Images, UC QuakeStudies

A photograph of a spray-painted message on a fence reading, "4 sale - handy mans dream. Mild reno's needed. Easy indoor/outdoor flow - with water feature!" The photograph is captioned by Paul Corliss, "New Brighton by QEII Drive".

Images, UC QuakeStudies

A photograph of a spray-painted message on a fence reading, "4 sale - handy mans dream. Mild reno's needed. Easy indoor/outdoor flow - with water feature!" The photograph is captioned by Paul Corliss, "New Brighton by QEII Drive".

Images, UC QuakeStudies

A photograph of a spray-painted message on a fence reading, "4 sale - handy mans dream. Mild reno's needed. Easy indoor/outdoor flow - with water feature!" The photograph is captioned by Paul Corliss, "New Brighton by QEII Drive".

Images, UC QuakeStudies

Water flows down the driveway of a house in Richmond. The photographer comments, "Tom and Yvonne McBrearty's house. This lovely house is now on an island in a creek. The water from Dudley Creek found its way to the Avon through their yard. It stopped flowing after two days".

Images, UC QuakeStudies

Water and liquefaction flows into the Avon River in Richmond. The water level is very high, and the water is cloudy with silt. The photographer comments, "Water from Dudley Creek took a shortcut across the road into the Avon. It doesn't have much of a drop from the road to the river".

Research papers, University of Canterbury Library

Many buildings with relatively low damage from the 2010-2011 Canterbury were deemed uneconomic to repair and were replaced [1,2]. Factors that affected commercial building owners’ decisions to replace rather than repair, included capital availability, uncertainty with regards to regional recovery, local market conditions and ability to generate cash flow, and repair delays due to limited property access (cordon). This poster provides a framework for modeling decision-making in a case where repair is feasible but replacement might offer greater economic value – a situation not currently modeled in engineering risk analysis.

Research papers, University of Canterbury Library

Results from a series of 1D seismic effective stress analyses of natural soil deposits from Christchurch are summarized. The analysed soil columns include sites whose performance during the 2010-2011 Canterbury earthquakes varied significantly, from no liquefaction manifestation at the ground surface to very severe liquefaction, in which case a large area of the site was covered by thick soil ejecta. Key soil profile characteristics and response mechanisms affecting the severity of surface liquefaction manifestation and subsequent damage are explored. The influence of shaking intensity on the triggering and contribution of these mechanisms is also discussed. Careful examination of the results highlights the importance of considering the deposit as a whole, i.e. a system of layers, including interactions between layers in the dynamic response and through pore water pressure redistribution and water flow.

Research Papers, Lincoln University

Numerous rockfalls released during the 2010–2011 Canterbury earthquake sequence affected vital road sections for local commuters. We quantified rockfall fatality risk on two main routes by adapting a risk approach for roads originally developed for snow avalanche risk. We present results of the collective and individual fatality risks for traffic flow and waiting traffic. Waiting traffic scenarios particularly address the critical spatial-temporal dynamics of risk, which should be acknowledged in operational risk management. Comparing our results with other risks commonly experienced in New Zealand indicates that local rockfall risk is close to tolerability thresholds and likely exceeds acceptable risk.

Research papers, University of Canterbury Library

The Canterbury earthquakes resulted in numerous changes to the waterways of Ōtautahi Christchurch. These included bank destabilisation, liquefaction effects, changes in bed levels, and associated effects on flow regimes and inundation levels. This study set out to determine if these effects had altered the location and pattern of sites utilised by īnanga (Galaxias maculatus) for spawning, which are typically restricted to very specific locations in upper estuarine areas. Extensive surveys were carried out in the Heathcote/Ōpāwaho and Avon/Ōtākaro catchments over the four peak months of the 2015 spawning season. New spawning sites were found in both rivers and analysis against pre-earthquake records identified that other significant changes have occurred. Major changes include the finding of many new spawning sites in the Heathcote/Ōpāwaho catchment. Sites now occur up to 1.5km further downstream than the previously reported limit and include the first records of spawning below the Woolston Cut. Spawning sites in the Avon/Ōtākaro catchment also occur in new locations. In the mainstem, sites now occur both upstream and downstream of all previously reported locations. A concentrated area of spawning was identified in Lake Kate Sheppard at a distinctly different location versus pre-quake records, and no spawning was found on the western shores. Spawning was also recorded for the first time in Anzac Creek, a nearby waterway connected to Lake Kate Sheppard via a series of culverts.