The Christchurch City councillor in charge of council housing says he accepts trenchant criticism from the Earthquake Recovery Minister that the council has been woeful in fixing its quake-damaged housing stock.
A video about the earthquake damage to the Christchurch Town Hall. The video shows footage of a tour through the inside of the Town Hall, recorded on a GoPro camera. It also includes interviews with Councillor Glenn Livingstone and Councillor Tim Carter about their impressions of the damage and the work that will be needed to fix the building.
A selection of the week's news including a former New Zealand cricketer demanding answers over how his name has been linked an investigation into match-fixing, the Act Party leader announces he is quitting as party leader and will leave parliament next year, the biggest drug haul in New Zealand history, the Auditor General apologises to Mangawhai locals for Audit New Zealand's failure to identify a 60 million-plus waste-water debacle, the Labour Party says its victory in the Christchurch East by-election is an indictment of the Government's response to the earthquakes, we hear from the author of a book about the building blocks of our words and literature and the national champion who will proudly represent New Zealand at an international competition in Perth.
Following the 2010/2011 Canterbury, New Zealand earthquakes, a detailed door-to-door survey was conducted in the Christchurch region to establish the earthquake performance of lightweight timber-framed residential dwellings with a masonry veneer external cladding system. The post-earthquake survey involved documenting the condition of dwellings in areas that had experienced different levels of earthquake shaking, allowing comparison between the performance of different veneer systems and different shaking intensities. In total, just fewer than 1,100 residential dwellings were inspected throughout the wider Christchurch area. The survey included parameters such as level of veneer damage, type of veneer damage, observed crack widths, and level of repair required. It is concluded that based on observed earthquake performance at the shaking intensities matching or exceeding ultimate limit state loading, the post-1996 veneer fixing details performed satisfactorily and continued use of the detail is recommended without further modification. AM - Accepted Manuscript