Photograph captioned by BeckerFraserPhotos, "Events Village in Hagley Park".
The opening event for the Gap Filler bookfridge, as people start to arrive.
People begin to gather at the opening event for the Gap Filler bookfridge.
The opening event for the Gap Filler bookfridge, as people start to arrive.
A PDF copy of the official magazine for the 2011 City 2 Surf event.
Photograph captioned by BeckerFraserPhotos, "Events have bypassed this notice as most buildings here have gone".
Woolly medals, stitched on the anniversary of the first earthquake at the Lyttelton Petanque Club, a gathering spot for many community events and activities.
At the opening event for the Gap Filler bookfridge, one of the organisers registers donated books with Bookcrossing.com, while volunteers start filling the fridge with books.
At the opening event for the Gap Filler bookfridge, one of the organisers registers donated books with Bookcrossing.com, while volunteers start filling the fridge with books.
The stitching of felt hearts on the anniversary of the first earthquake on the site of the demolished Ground Culinary Centre, which is now the Lyttelton Petanque Club grounds, a gathering spot for many community events and activities.
A collapsed section of the Cranmer Courts on the corner of Montreal Street and Kilmore Street. Safety fences have been erected around the building to prevent the public getting close enough to it to be endangered by falling masonry in the event of another earthquake.
The front of Liquidity Bar on Oxford Terrace, a yellow-sticker in the window. Inspecting engineers have spray-painted the windows with 'TF3 clear 24/2 0720' and 'USA 2'. A poster stuck on the front right wall advertises a music event from before the February 2011 earthquake.
This paper presents preliminary field observations on the performance of selected steel structures in Christchurch during the earthquake series of 2010 to 2011. This comprises 6 damaging earthquakes, on 4 September and 26 December 2010, February 22, June 6 and two on June 13, 2011. Most notable of these was the 4 September event, at Ms7.1 and MM7 (MM as observed in the Christchurch CBD) and most intense was the 22 February event at Ms6.3 and MM9-10 within the CBD. Focus is on performance of concentrically braced frames, eccentrically braced frames, moment resisting frames and industrial storage racks. With a few notable exceptions, steel structures performed well during this earthquake series, to the extent that inelastic deformations were less than what would have been expected given the severity of the recorded strong motions. Some hypotheses are formulated to explain this satisfactory performance. http://db.nzsee.org.nz/SpecialIssue/44%284%290297.pdf
A photograph of Celia Wade-Brown, Mayor of Wellington, speaking at a graduation ceremony for more than 40 new civil defence volunteers in the Wellington Town Hall. Members of the Wellington Emergency Management Office team were presented certificates of appreciation during this event. The certificates were presented to the members to honour their involvement in the emergency response to the 22 February 2011 earthquakes in Christchurch.
A photograph of Fred Mecoy, the Wellington City Council's Emergency Preparedness Manager, speaking at a graduation ceremony for more than 40 new civil defence volunteers in the Wellington Town Hall. Members of the Wellington Emergency Management Office team were presented certificates of appreciation during this event. The certificates were presented to the members to honour their involvement in the emergency response to the 22 February 2011 earthquakes in Christchurch.
Student leaders, including UCSA President Kohan McNab and Sam Johnston, head of the Student Volunteer Army, leading students from the University of Canterbury in a two minute silence to remember those who died in the 22 February 2011 earthquake. They have stood on top of the ENSOC fire engine to address the crowd, and the event has been filmed from that vantage point. The students have been enjoying a barbeque lunch break in Burwood Park after volunteering to dig up liquefaction as part of the Student Volunteer Army.
A faded yellow sticker stuck to the window of a house on Avonside Drive. It has been issued by the Christchurch City Council and reads, "Restricted Use. No entry except on essential business. Warning: This building has been damaged and its structural safety is questionable. Enter only at own risk. Subsequent aftershocks or other events may result in increased damage and danger, changing this assessment. Re-inspection may be required. The damage observed from external inspection is as described below." It goes on to set out the conditions for entry to the building and information about the inspector. The sign is so faded that the handwritten information is almost illegible.
A yellow sticker on the door of a house in Worcester Street reading, "Restricted use. No entry except on essential business. Warning: This building has been damaged and its structural safety is questionable. Earthquake aftershocks present danger. Enter only at own risk. Subsequent events may result in increased damage and danger, changing this assessment. Reinspection may be required. The damage is as described below: partial collapse of longitudinal walls". Following on from this are the specific conditions that must be complied with to enable entry into the property, the inspector's identification details, and the date and time the building was inspected. At the bottom the form reads, "Do not remove this placard. Placed by order of the territorial authority Christchurch City Council".
In the early morning of 4th September 2010 the region of Canterbury, New Zealand, was subjected to a magnitude 7.1 earthquake. The epicentre was located near the town of Darfield, 40 km west of the city of Christchurch. This was the country’s most damaging earthquake since the 1931 Hawke’s Bay earthquake (GeoNet, 2010). Since 4th September 2010 the region has been subjected to thousands of aftershocks, including several more damaging events such as a magnitude 6.3 aftershock on 22nd February 2011. Although of a smaller magnitude, the earthquake on 22nd February produced peak ground accelerations in the Christchurch region three times greater than the 4th September earthquake and in some cases shaking intensities greater than twice the design level (GeoNet, 2011; IPENZ, 2011). While in September 2010 most earthquake shaking damage was limited to unreinforced masonry (URM) buildings, in February all types of buildings sustained damage. Temporary shoring and strengthening techniques applied to buildings following the Darfield earthquake were tested in February 2011. In addition, two large aftershocks occurred on 13th June 2011 (magnitudes 5.7 and 6.2), further damaging many already weakened structures. The damage to unreinforced and retrofitted clay brick masonry buildings in the 4th September 2010 Darfield earthquake has already been reported by Ingham and Griffith (2011) and Dizhur et al. (2010b). A brief review of damage from the 22nd February 2011 earthquake is presented here