Ruth Gardner's Blog 12/09/2010: Volunteer Quake-catchers
Articles, UC QuakeStudies
An entry from Ruth Gardner's blog for 12 September 2010 entitled, "Volunteer Quake-catchers".
An entry from Ruth Gardner's blog for 12 September 2010 entitled, "Volunteer Quake-catchers".
Earthquakes impacting on the built environment can generate significant volumes of waste, often overwhelming existing waste management capacities. Earthquake waste can pose a public and environmental health hazard and can become a road block on the road to recovery. Specific research has been developed at the University of Canterbury to go beyond the current perception of disaster waste as a logistical hurdle, to a realisation that disaster waste management is part of the overall recovery process and can be planned for effectively. Disaster waste decision-makers, often constrained by inappropriate institutional frameworks, are faced with conflicting social, economic and environmental drivers which all impact on the overall recovery. Framed around L’Aquila earthquake, Italy, 2009, this paper discusses the social, economic and environmental effects of earthquake waste management and the impact of existing institutional frameworks (legal, financial and organisational). The paper concludes by discussing how to plan for earthquake waste management.
This paper presents the probabilistic seismic performance and loss assessment of an actual bridge– foundation–soil system, the Fitzgerald Avenue twin bridges in Christchurch, New Zealand. A two-dimensional finite element model of the longitudinal direction of the system is modelled using advanced soil and structural constitutive models. Ground motions at multiple levels of intensity are selected based on the seismic hazard deaggregation at the site. Based on rigorous examination of several deterministic analyses, engineering demand parameters (EDP’s), which capture the global and local demand, and consequent damage to the bridge and foundation are determined. A probabilistic seismic loss assessment of the structure considering both direct repair and loss of functionality consequences was performed to holistically assess the seismi risk of the system. It was found that the non-horizontal stratification of the soils, liquefaction, and soil–structure interaction had pronounced effects on the seismic demand distribution of the bridge components, of which the north abutment piles and central pier were critical in the systems seismic performance. The consequences due to loss of functionality of the bridge during repair were significantly larger than the direct repair costs, with over a 2% in 50 year probability of the total loss exceeding twice the book-value of the structure.
1. Dr RUSSEL NORMAN to the Minister of Trade: Does he still consider that the United States will benefit from being part of the Trans-Pacific Partnership; if so, how? 2. Hon PHIL GOFF to the Prime Minister: Does he believe that all persons who have served as Ministers in his Government have met the requirement of the Cabinet Manual to behave in a way that upholds, and is seen to uphold, the highest ethical standards in their ministerial capacity, their political capacity and their personal capacity; if so, why? 3. CRAIG FOSS to the Minister of Finance: What reports has he received on the Government's financial position? 4. Hon ANNETTE KING to the Minister of Tourism: How many full-time permanent jobs has his cycleway project created? 5. JONATHAN YOUNG to the Minister for Communications and Information Technology: What progress has been made on the Ultra-fast broadband initiative? 6. Hon TREVOR MALLARD to the Minister of Education: Which ministers, if any, did she personally consult with on the question of removing the requirement for police checks for employees of limited attendance early childhood centres before she introduced the Education Amendment Bill (No 2)? 7. AARON GILMORE to the Minister of Revenue: What examples can he give of families claiming social assistance for which they are not entitled and what has this Government done to stop this abuse? 8. Hon DAVID CUNLIFFE to the Minister of Finance: How much lower will the growth forecast be for the year to March 2011 in the Half Year Economic and Fiscal Update compared with the Budget 2010 forecast? 9. SHANE ARDERN to the Minister of Agriculture: What recent actions has the Government taken to improve the welfare of pigs in New Zealand? 10. Hon RUTH DYSON to the Minister of Health: Will he act to prevent closure of health services in Taihape? 11. AMY ADAMS to the Minister for Land Information: What steps has Land Information New Zealand taken to help in the rebuilding of Canterbury following the 4 September earthquake? 12. Hon DARREN HUGHES to the Minister of Transport: Which project has the higher benefit cost ratio: the Auckland CBD rail loop or the Puhoi to Wellsford Road of National Significance?