Images, Alexander Turnbull Library

Text at the top of the cartoon reads 'NZ city strengthening?' A whole city enclosed in a glass dome and balanced on huge springs intended to make it earthquake resistant rocks as another aftershock hits. Context - Two earthquakes and hundreds of aftershocks have hit Christchurch, the first on 4 September 2010 and a second more devastating one on 22 February 2011. There has been great emphasis on making heritage buildings that are rebuilt and all new buildings earthquake resistant. The example in the cartoon is perhaps a Springs-with-damper base isolator. Quantity: 1 digital cartoon(s).

Videos, UC QuakeStudies

A video of a tour of the Christchurch Arts Centre, lead by Director Ken Franklin. Franklin talks about the strengthening work which was done to the Arts Centre before the earthquakes, the damage caused by the 4 September 2010 earthquake, and the importance of preserving the character of the buildings.

Audio, Radio New Zealand

With Adrian Regnault, the General Manager of Building Systems Performance at the Ministry of Business, Innovation and Employment; Stefano Pampanin, an Associate Professor in Structural Engineering at Canterbury University and the President of the NZ Society for Earthquake Engineering and John Finnegan - structural engineer, Aurecon.

Research papers, The University of Auckland Library

As a result of the 4 September 2010 Darfield earthquake and the more damaging 22 February 2011 Christchurch earthquake, considerable damage occurred to a significant number of buildings in Christchurch. The damage that occurred to the Christchurch Roman Catholic Cathedral of the Blessed Sacrament (commonly known as the Christchurch Basilica) as a result of the Canterbury earthquakes is reported, and the observed failure modes are identified. A previous strengthening intervention is outlined and the estimated capacity of the building is discussed. This strengthening was completed in 2004, and addressed the worst aspects of the building's seismic vulnerability. Urgent work was undertaken post-earthquake to secure parts of the building in order to limit damage and prevent collapse of unstable parts of the building. The approach taken for this securing is outlined, and the performance of the building and the previously installed earthquake strengthening intervention is evaluated.A key consideration throughout the project was the interaction between the structural securing requirements that were driven by the requirement to limit damage and mitigate hazards, and the heritage considerations. Lessons learnt from the strengthening that was carried out, the securing work undertaken, and the approach taken in making the building "safe" are discussed. Some conclusions are drawn with respect to the effectiveness of strengthening similar building types, and the approach taken to secure the building under active seismic conditions. AM - Accepted Manuscript

Research papers, Victoria University of Wellington

<b>In the late 1960s the Wellington City Council surveyed all the commercial buildings in the city and marked nearly 200 as earthquake prone. The owners were given 15 years to either strengthen or demolish their buildings. The end result was mass demolition throughout the seventies and eighties.¹ Prompted by the Christchurch earthquakes, once again the council has published a list of over 630 earthquake prone buildings that need to be strengthened or demolished by 2030.²Of these earthquake prone buildings, the majority were built between 1880 and 1930, with 125 buildings appearing on the Wellington City Council Heritage Building List.³ This list accounts for a significant proportion of character buildings in the city. There is a danger that the aesthetic integrity of our city will be further damaged due to the urgent need to strengthen these buildings. Many of the building owners are resistant because of the high cost. By adapting these buildings to house co-workspaces, we can gain more than just the retention of the building’s heritage. The seismic upgrade provides the opportunity for the office space to be redesigned to suit changes in the ways we work. Through a design-based research approach this thesis proposes a framework that clarifies the process of adapting Wellington’s earthquake prone heritage buildings to accommodate co-working. This framework deals with the key concepts of program, structure and heritage. The framework is tested on one of Wellington’s earthquake prone heritage buildings, the Wellington Working Men’s Club, in order to demonstrate what can be gained from this strengthening process. ¹ Reid, J., “Hometown Boomtown,” in NZ On Screen (Wellington, 1983).</b> ² Wellington City Council, List of Earthquake Prone Buildings as at 06/03/2017. (Wellington: Absolutely Positively Wellington. 2017). ³ ibid. 

Audio, Radio New Zealand

Provincial towns and rural communities around the country say they will be financially ruined under proposals to strengthen buildings following the Christchurch earthquakes. Dale Williams is Mayor of Otorohanga, Dave Cull is Mayor of Dunedin and Lawrence Yule is Mayor of Hastings and president of Local Government NZ.