An entry from Ruth Gardner's blog for 29 June 2013 entitled, "Regent Repairs".
The Earthquake Commission has brought forward its deadline for repairing thousands of earthquake-damaged properties in Canterbury by 12 months.
An entry from Deb Robertson's blog for 6 October 2013 entitled, "Earthquake Repairs Day is here!!!".
A forum's heard from older people in Christchurch saying they feel vulnerable, misled, and left out in the cold when it comes to earthquake repairs and payouts.
Group action may be taken against the Earthquake Commission over the quality of repairs to damaged Christchurch homes.
Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...
The information board for the Riccarton House earthquake repairs and strengthening project.
An audit of the Earthquake Commission's quake repairs in Christchurch has found many dissatisfied home owners and others being left in the dark.
Information board and hazard notices for the Riccarton House earthquake repairs and strengthening project.
Christchurch City Council staff have been given the hurry up from councillors over the length of time it is taking to repair or replace earthquake-damaged council housing.
An aerial photograph looking south over the Arts Centre on Worcester Boulevard. Scaffolding and cranes can be seen around the building which is having extensive repairs done to it after the earthquakes.
Sewer repairs due to earthquake damage have our street totally closed off apart from pedestrian traffic down the footpath.
20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
Two years on from the February twenty second earthquake, large parts of Christchurch Hospital are a construction site as repairs to damaged wards continue.
An intermittent collaboration between the Centre of Contemporary Art and a series of local artists looking to present new work which explores the realities of the post-earthquake cultural landscape in Christchurch. The artworks by Ed Lust, Sam Eng, and Robyn Wester each utilise the empty window space of the window and carport of the damaged COCA building which is awaiting repair.
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...
EQC's manager for the Canterbury home repair programme, Reid Stiven, respondes to claims of misleading estimates of damage to household foundations from the 2010 and 2011 earthquakes.
The company that has the main contract for repairing houses in Christchurch, Fletcher Earthquake Recovery, is assuring taxpayers it's doing everything it can to avoid any fraudulent behaviour.
Tower Insurance has increased the amount it is willing to pay towards repairing an earthquake-damaged Christchurch home, but is still refusing to pay for a more expensive rebuild.
One landscape colour digital photograph taken on 26 May 2013 on the corner of Norwich Quay and Canterbury Street, Lyttelton. The photograph shows the sites of the Royal Hotel, Shadbolt House, and the Lyttelton Hotel along Norwich Quay. The Wunderbar and the repair and strengthening work underway on the Lyttelton Working Mens Club/The Loons are v...
A message in a bottle, hidden under the floor of a Christchurch home for over fifty years, has been discovered during earthquake repairs and its writer's been tracked down.
The Earthquake Commission has been forced into an embarrassing admission that the details of all 83-thousand clients in its Canterbury Home Repair programme have been accidentally emailed to the wrong address.
Despite Government pressure on the Christchurch City Council to sell off some of its assets to help fund its 40% share of the city's earthquake repairs, the council has instead decided to raise rates, and rents.
The Earthquake Commission has admitted its privacy breach was almost 10 times worse than it had said, with the details of all 83-thousand clients in its Canterbury Home Repair programme being emailed out.
The Earthquake Commission has admitted the details of all 83-thousand clients in its Canterbury Home Repair programme have been accidentally emailed to the wrong place, not just the almost 10 thousand it said on Friday
A signpost pointing 'West' and 'East'. The sign pointing West is intact; that indicating East is broken and barely hanging on to the post. Refers to the condition of Christchurch City after the earthquakes of 2010 and 2011; the western wealthier suburbs were less damaged than the poorer Eastern suburbs. Also, progress on repair and rehabilitation of eastern housing had been slow. The redesign of the city centre seemed to be a western suburb priority which ignored the poverty and misery of living conditions on the east. Quantity: 1 digital cartoon(s).
Shows a group of snails working on the rebuild of Christchurch. Refers to the slow pace of recovery after February 2011 earthquake in Canterbury. Quantity: 1 digital cartoon(s).
Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage.
Following the 2010/2011 Canterbury, New Zealand earthquakes, a detailed door-to-door survey was conducted in the Christchurch region to establish the earthquake performance of lightweight timber-framed residential dwellings with a masonry veneer external cladding system. The post-earthquake survey involved documenting the condition of dwellings in areas that had experienced different levels of earthquake shaking, allowing comparison between the performance of different veneer systems and different shaking intensities. In total, just fewer than 1,100 residential dwellings were inspected throughout the wider Christchurch area. The survey included parameters such as level of veneer damage, type of veneer damage, observed crack widths, and level of repair required. It is concluded that based on observed earthquake performance at the shaking intensities matching or exceeding ultimate limit state loading, the post-1996 veneer fixing details performed satisfactorily and continued use of the detail is recommended without further modification. AM - Accepted Manuscript