A news item titled, "Oxford Street Bridge Repaired", published on the Lyttelton Harbour Information Centre's website on Thursday, 29 September 2011.
None
Roading contractors are already repairing many Christchurch streets damaged by last week's earthquake.
Principal of Banks Ave School, Murray Edlin, and Canterbury Primary Principals Association president, John Bangma, discuss the issue of earthquake damaged schools in property repairs funding shock.
The Earthquake Commission says 95 percent of the invoices it gets from contractors repairing houses in Christchurch are paid out within two to three weeks.
Website of the EQR (Earthquake Recovery) Project Management Office, established by the EQC and managed by Fletcher Construction, that responds to claims for the repair and rebuilding of houses damaged in the Feb. 2011 Canterbury earthquake.
Heritage supporters are hoping that serious earthquake damage wrought upon Christchurch cemeteries will be repaired- but the issue of who funds that work remains unresolved.
With Christchurch having its first real taste of winter , the Earthquake Commission is telling Christchurch residents that its focus is on emergency repairs.
Lawrence Roberts' blog for those living in Cowlishaw Street, Chaddesden Lane, Patten Street, Retreat Road and close by. Includes information and news on earthquake assessment, repairs/rebuilding and related matters; and photo gallery.
In June, the Hororata hotel in Canterbury closed after it became clear there was no economic way to repair damage caused by the September earthquake.
The Canterbury District Health Board is facing a bill in excess of $70-million to repair earthquake damage to more than seven and a half thousand rooms in two of its hospitals.
The company hired by the Government to carry out earthquake repairs in Canterbury is refusing to install insulation at the same time as it replaces old cladding on houses.
A Christchurch support group says home owners will be alarmed at the blowout in earthquake repair costs.
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work on Hackthorne Road, Cashmere".
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work at a house on Hackthorne Road, Cashmere".
A newspaper lying on the boardroom table has a headline reading 'Top NZ companies planning contributions to earthquake relief'. A group of CEOs at a high level meeting almost have cardiac arrests when the chair reports that 'Some comedian suggested we CEOs donate our salary increases and bonuses... But now, moving on to serious matters... Context - Some big companies like Fletcher Building, General Motors and others have pledged substantial money to the Christchurch earthquake relief funds. The Christchurch earthquake happened 22 February 2011. Quantity: 1 digital cartoon(s).
A worker repairs a leaning power pole in Bexley. The photographer comments, "I was told that this electricity pole in Bexley always leans after every big earthquake. Maybe it might take more than a one man and one shovel to put 'straight'".
The EQC (Earthquake Commission) has developed new standards and designs to help rebuild Christchurch after the earthquakes of 2010 and 2011. The Department of Building and Housing have produced some generic building foundation and floor designs that can be used for residential homes being built or repaired on liquefied, tilting, unsettled and/or damaged land. (RebuildChristchurch.co.nz) Quantity: 1 digital cartoon(s).
Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:
The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.
The Plumbers industry body says some plumbers helping Christchurch quake victims are struggling to stay afloat, because the Earthquake Commission is not paying out fast enough for emergency repairs.
More than ten weeks after being damaged beyond repair by the Christchurch earthquake, there is still no decision about how or when the Grand Chancellor Hotel will be demolished.
Relates to the three new categories for residential foundation design that have been developed and will be required for repairing and rebuilding homes in Canterbury following the earthquakes of 2010 and 2011. The 'zones' referred to in the cartoon are the colours designated to different degrees of damage to particular areas or buildings in Christchurch after the earthquakes. Quantity: 1 digital cartoon(s).
In order to provide information related to seismic vulnerability of non-ductile reinforced concrete (RC) frame buildings, and as a complementary investigation on innovative feasible retrofit solutions developed in the past six years at the University of Canterbury on pre-19170 reinforced concrete buildings, a frame building representative of older construction practice was tested on the shake table. The specimen, 1/2.5 scale, consists of two 3-storey 2-bay asymmetric frames in parallel, one interior and one exterior, jointed together by transverse beams and floor slabs. The as-built (benchmark) specimen was first tested under increasing ground motion amplitudes using records from Loma Prieta Earthquake (California, 1989) and suffered significant damage at the upper floor, most of it due to lap splices failure. As a consequence, in a second stage, the specimen was repaired and modified by removing the concrete in the lap splice region, welding the column longitudinal bars, replacing the removed concrete with structural mortar, and injecting cracks with epoxy resin. The modified as-built specimen was then tested using data recorded during Darfield (New Zealand, 2010) and Maule (Chile, 2010) Earthquakes, with whom the specimen showed remarkably different responses attributed to the main variation in frequency content and duration. In this contribution, the seismic performance of the three series of experiments are presented and compared.
The cartoon shows an enormous ball of red tape and all around frustrated workers carry away their ladders and tools. Context - Three months after a quake that scored a direct hit under Christchurch, many residents are struggling with mountains of paperwork required to get their homes repaired and rebuilt. Reference numbers, codes and Pin numbers permeate our daily living now as we deal with the aftermath of two major earthquakes in six months. People feel they are lucky that they have the EQC pot to draw on, but there are a lot of complexities, anomalies and frustrations. (BBC News 21 May 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).
Almost 200 workers in Christchurch have lost their jobs with the closure of the Canterbury Spinners Plant - which the owners say was so badly damaged in last month's earthquake that it is beyond repair.
Text at top left reads 'Earthquake... aftershock... or "new event"... one thing remains constant...' Below is a snail with 'EQC payments' printed on its shell. Context - This is a reference to the problems that Christchurch people are having in getting payments from the EQC (Earthquake Commission) Disgruntled tradespeople who are owed hundreds of thousands of dollars by EQC are considering legal action. Remaining unpaid can mean that companies may have to consider laying people off. The Amalgamated Workers Union says delays in EQC payments for housing repair work in quake-hit Christchurch are building to a crisis point. Two versions of this cartoon are available Quantity: 2 digital cartoon(s).
In the top frames two children shout 'four point one', 'three point six', and 'five point two' and in the frame below it is seen that they are responding to bumps in the road as their mother drives through Christchurch streets. Context - The children have become expert at guessing the seismic intensity of earthquakes in Christchurch and are now applying them to bumps in the road. Colour and black and white versions available Quantity: 2 digital cartoon(s).
Text reads 'Solution to Christchurch sewage problems?...' A woman, with a roll of toilet paper in her hand, climbs a ladder to a toilet that is positioned on a sewage pipe high above the ground. There are further toilets at intervals on the pipe. Her husband stands in the garden and observes that it is 'Easy to access and easy to repair'. Context - the Christchurch earthquakes and continuing aftershocks have done huge damage to sewage infrastructures which suggests having the pipes above ground as a solution. Quantity: 1 digital cartoon(s).
A woman says to a builder 'Christchurch people will really appreciate your help to rebuild - What you construct looks like it's already been hit by an earthquake'. They are standing in front of a very shoddily-built cottage and the garden is festooned with litter. Context - After the Christchurch earthquakes there is a huge emphasis on fast rebuilding with the potential for below standard results.. Quantity: 1 digital cartoon(s).