Those repairing an earthquake damaged cliff in Christchurch have had to wrangle with home owners who don't want to sell, and relocating a rare flightless moth. Rachel Graham reports.
A PDF copy of a handwritten journal kept by Robin Robins, documenting the repair work on his earthquake-damaged home between November 2012 and April 2017. Note that some personal information has been redacted from this document.
Repair work on Christchurch's iconic Town Hall, badly damaged in the earthquakes, has nearly hit the halfway mark.
Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...
Heritage supporters are hoping that serious earthquake damage wrought upon Christchurch cemeteries will be repaired- but the issue of who funds that work remains unresolved.
A worker in a high visibility vest and a hard hat repairing and strengthening the outside of a building at the University of Canterbury. The photograph has been captioned by BeckerFraserPhotos, "The repair work on the buildings at the University of Canterbury looks similar to the scenes in the CBD".
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Boat ramp at New Brighton. Avon River.
The Minister for Earthquake Recovery, Gerry Brownlee, says the recovery process from Canterbury's earthquake is moving quickly, despite strong aftershocks yesterday setting back repair work.
The Earthquake Commission has announced it is slashing 480 jobs as its repair work in Canterbury enters its final phase.
The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand. While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible. Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...
More repairs to the infrastructure as a result of the 2010 & 2011 earthquakes. Hardy Street/Owles Terrace corner (beside the boat launching ramp), New Brighton
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work on Hackthorne Road, Cashmere".
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
A photograph of an office in the Diabetes Centre. The office furniture has been pushed together to prepare the room for earthquake repair work.
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work at a house on Hackthorne Road, Cashmere".
A variation to the consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
Scaffolding covering the outer walls of the James Hight Building at the University of Canterbury. The photograph has been captioned by BeckerFraserPhotos, "The repair work on the buildings at the University of Canterbury looks similar to the scenes in the CBD".
Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:
Some Christchurch residents are frustrated at the time it's taking to work out what sort of foundations their homes will require when earthquake repairs are carried out.
A photograph of Wayne Smith and Ken Vickery inside the Observatory at the Christchurch Arts Centre, taken in the 1970s. Smith and Vickery are pictured next to the Townsend Telescope, which they have just refurbished. No repair work was necessary during this process.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Lyttelton area.
By closely examining the performance of a 22-storey steel framed building in Christchurch subject to various earthquakes over the past seven years, it is shown that a number of lessons can be learnt regarding the cost-effective consideration of non-structural elements. The first point in this work is that non-structural elements significantly affected the costs associated with repairing steel eccentrically braced frame (EBF) links. The decommissioning or rerouting of non-structural elements in the vicinity of damaged links in the case study building attributed to approximately half the total cost of their repair. Such costs could be significantly reduced if the original positioning of non-structural elements took account of the potential need to repair the EBF links. The second point highlighted is the role that pre-cast cladding apparently played on the distribution and type of damage in the building. Loss estimates obtained following the FEMA P-58 framework vary considerably when cladding is or isnt modelled, both because of changes to drift demands up the height of the building and because certain types of subsequent damage are likely to be cheaper to repair than others. Finally, costly repairs to non-structural partition walls were required not only after the moment magnitude 7.1 earthquake in 2010 but also in multiple aftershocks in the years that followed. Repair costs associated with aftershock events exceeded those from the main event, emphasizing the need to consider aftershocks within modern performance-based earthquake engineering and also the opportunity that exists to make more cost-effective repair strategies following damaging earthquakes.
Shows a man exhausted after a weekend of watching the All Blacks playing Ireland on TV. His wife understands the frustration of Christchurch residents waiting too long for repairs to properties. Context: Refers to frustrating delays in getting earthquake-related repairs done in Christchurch, this in large part due to slowness of insurance claims and permissions. Quantity: 1 digital cartoon(s).
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Christchurch City area.
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Earthquake damage repair work on the stop bank".
An intermittent collaboration between the Centre of Contemporary Art and a series of local artists looking to present new work which explores the realities of the post-earthquake cultural landscape in Christchurch. The artworks by Ed Lust, Sam Eng, and Robyn Wester each utilise the empty window space of the window and carport of the damaged COCA building which is awaiting repair.
The purpose of this research is to investigate men’s experiences of the 2016 7.8 magnitude Kaikōura earthquake and Tsunami. While, research into the impacts of the earthquake has been conducted, few studies have examined how gender shaped people’s experiences of this natural hazard event. Analysing disasters through a gender lens has significantly contributed to disaster scholarship in identifying the resilience and vulnerabilities of individuals and communities pre- and post-disaster (Fordham, 2012; Bradshaw, 2013). This research employs understandings of masculinities (Connell, 2005), to examine men’s strengths and challenges in responding, recovering, and coping following the earthquake. Qualitative inquiry was carried out in Northern Canterbury and Marlborough involving 18 face-to-face interviews with men who were impacted by the Kaikōura earthquake and its aftermath. Interview material is being analysed using thematic and narrative analysis. Some of the preliminary findings have shown that men took on voluntary roles in addition to their fulltime paid work resulting in long hours, poor sleep and little time spent with family. Some men assisted wives and children to high ground then drove into the tsunami zone to check on relatives or to help evacuate people. Although analysis of the findings is currently ongoing, preliminary findings have identified that the men who participated in the study have been negatively impacted by the 2016 Kaikōura earthquake. A theme identified amongst participants was an avoidance to seek support with the challenges they were experiencing due to the earthquake. The research findings align with key characteristics of masculinity, including demonstrating risky behaviours and neglecting self or professional care. This study suggests that these behaviours affect men’s overall resilience, and thus the resilience of the wider community.
One landscape colour digital photograph taken on 28 April 2012 looking south from Cunningham Terrace, Lyttelton. The photograph shows a homemade figure of Humpty Dumpty with a bandaged head sitting on a fence on top of a retaining wall awaiting repair. Contractor involved in repair work The retaining walls above and below Cunningham Terrace wer...